You are on page 1of 6

Supply of Aluminum partition with glass

Bidding documents for Supply of Aluminum partition with glass


Activity Dates
Bidding documents circulation May 30, 2016
Bid submission with required documents June 01,2016
      
Instruction to Bidders for submission of Bids and general
conditions of contract/PO:

1. Eligibility of Bidders: Only those bidders are eligible to apply who:

a) Are registered with tax authorities and have National Tax


Number (NTN) and/or GST. (Please submit copy of NTN and
GST certificates)
b) Have experience for supply of similar items and experience of
executing significant amount of orders i.e. single order
exceeding one (01) Million Pak Rupees during preceding two (2)
years. (Please compile complete details as per Annexure “B” and
attach relevant proof).
c) Must have own assembling facility/setup. (Save the Children
may physically inspect the applicant’s organizational setup /
facility at time of his own convenience )

2. Scope of Work: Supply of aluminum partition with glass as per


attached specifications in annexure “A” to this document. Successful
bidder need to comply with relevant quality standard and must
physically shows his most recently completed work upon intimation of
competent authority of Save the children and sample of one partition
with complete fixing must be established at desired premises within 2
calendar days of award of contract. Subsequent complete order will be
subject to approval of competent authority which minutely reviews
design & specifications requirements along with fixing work. In case
established aluminum partition sample does not meet minimum
quality standards and purchase order is cancelled, competent
authority may allow payment/ cost of submitted sample as per bid
price.

3. Delivery and Installation Location: Delivery and Installation shall


be required at address: Rana Plaza, 88-West, Block F, Fazal-e-Haq
Road, Blue Area, Islamabad within Fifteen (15) days after approval of
sample. The financial proposal must be supported by work execution
schedule which comply with lead time stipulated above.

4. Bid prices: Prices should be quoted in Pak Rupees as per attached


annexes “A”. The quoted price of must be final and inclusive of all
applicable taxes. No price variation shall be accepted after bid
opening and the quoted prices shall be considered as final prices.

5. Validity of Bid prices: Bid submitted by the bidders should have


quote validity period of at least thirty (30) days.

Page 1 of 6
Supply of Aluminum partition with glass

6. Bid Security: At the time of bid submission, interested eligible


bidders must submit a bid security (refundable) @ 3% of the total bid
value in the shape of Pay-order/Demand Draft issued by a scheduled
bank in the name of “Save the Children”. Bids submitted without bid
security shall not be considered. Bid security will be returned to
unsuccessful bidders within five (5) days of completion of evaluation of
bids to be completed within 2 weeks of bid submission. The bid
security of successful bidders shall only be returned after the
successful completion of the purchase order.

7. Cutting and overwriting: Only those bids will be considered which


are absolutely clear/unambiguous and legible. Any unavoidable
cutting/over-writing must be signed and stamped.

8. Bids Evaluation: Bids shall be evaluated on the basis of offered price


as submitted on Annexure “A” along with all required documentary
evidence as per clause 01 (Eligibility criteria).

9. Purchase Order: Purchase order will be issued to the successful


bidder and the organization reserves the right to award contract to
any bidder without assigning any reason whatsoever to the bidders. In
this regard, decision of the Country Director, Save the Children
Pakistan Program shall be final and non-challengeable in any forum.

10. Delivery: In case any completed/delivered work is found


not matching the earlier proved sample, defective/below standard
work will be rejected and no payment will be made for rejected work.
With the written consent of competent authority rejected work may be
replaced within 5 working days of communication of rejection.

11. Warranty: Supplied aluminum work with glass will have a 6


months warranty of manufacturing/assembling defects. Supplier will
replace faulty panels/parts/accessories free of cost within six months
of completion of supplies. Such faults when communicated via email
will be fixed/repaired within 2-3 working days.

12. Penalty: In case of work is delayed from given deadline of


15 days as per purchase order Save the Children shall impose penalty
on the bidder as per below schedule.

Day 1 to 5: 0.25 % per calendar day on the value of remaining items


that remains un-delivered as on the last date of work completion as
per the Contract.

Day 6 to 15: 0.5 % per day on the value of remaining items that
remains un-delivered as on the last date of work completion as per the
Contract.

Page 2 of 6
Supply of Aluminum partition with glass

The delay in delivery/fulfilling the complete order will not be acceptable


after 15 calendar days of expiry of deadline. In such a delay, the order
will be deemed as cancelled with defaulter becoming ineligible for any
claim whatsoever.

13. Payment: Save the Children shall make payment within 10


working days of work completion and receipt of invoice from the
bidder. Taxes at source shall be deducted from all payments made to
bidder/supplier as per Pakistan government tax laws and rules unless
a valid exemption certificate is provided by the bidder/supplier.

14. Preparation of Bid and submission: The bid documents


including the price schedule must be prepared on the attached
annexure “A” stamped and signed by the supplier and should be
submitted in sealed condition in marked envelopes as “Quotation for
Supply of Aluminum partition & glass” with complete return
address and contact numbers/cell numbers of the bidder/supplier.

Sealed bids with requested documents and information should be


dropped in the sealed bid box at below stated address against an
acknowledgment by or before 3:00 PM on Monday May 30, 2016.
Rana Plaza, 88-West, Block F, Fazal-e-Haq Road, Blue Area, Islamabad
(051-2871517)

Glass Partition Work in Blue Area Office


Total
S.N No/Tas Unit Total Cost
Description Unit Quantity
o k Rate/Sqft (PKR)
in Sqft
Glass Partition Work in Office
Supply and fixing Anodized
coated Clear plain 8 mm thick
non tampered glass fixed with
EPDM gaskets and silicon in 1.6
mm (15,16) section Aluminum
1. (champagne color) Partitions Sqft 1 1960
work complete fixing including
labor cost, joinery material
complete in all aspects, as per
site requirements and as per
Engineer direction.
Door Work in Office
Supply and fixing Anodized
coated Clear plain 8 mm thick
non tampered glass fixed with
EPDM gaskets and silicon in 1.6
2. Sqft 11 24
mm Aluminum (champagne
color) Doors work complete
fixing including locking
arrangement, 2 Handles, 4
Page 3 of 6
Supply of Aluminum partition with glass

hinges for smooth operation


including labour cost, joinery
material complete in all
aspects, as per site
requirements and as per
Engineer direction.
Glass Partition Work in Verandah
Supply and fixing Anodized
coated Plain 12 mm thick non
tampered color glass fixed with
EPDM gaskets and silicon in 1.6
mm (15,16) section Aluminum
(champagne color) Partition
work complete (Aver, opening
size is 11'*8.5') i.e. 2 panels in
a Sft 1 500
one opening and one Door
(6.5'*3.5') in entire work
complete fixing including
labour cost, joinery material
complete in all aspects and
complete air tight, as per site
requirements and as per
Engineer direction.
Total Estimated Cost PKR

Note:
 Your bid/proposal must be inclusive of freight and all other taxes
delivered at Save the Children Islamabad office.
 Tax at source will be deducted as per Pakistan Govt. Rule from all
payment to Supplier, unless a valid tax exemption is provided by
the supplier.
 Payment will only be made on submission of invoice in the name of
Save the Children.
 Bids after due date and time will not be entertained.
 Payment will be made as per name of business mentioned on
invoice.

Page 4 of 6
Supply of Aluminum partition with glass

INFORMATION ABOUT RELEVANT PROJECTS COMPLETED / ONGOING FOR LAST 2


YEARS
Annexure “B”

Purchase Client Contra


Contract
Sr. Order / Name & Contract ct Remarks
Awarded
# Contract Contact Amount Durati if any
Year
Details Details on

1
           

2
           

3
           

4
           

Page 5 of 6
Supply of Aluminum partition with glass

5
           

6
           

7
           

8
           

9
           

10
           

Note:
 Dully signed and stamped relevant purchase orders/contracts must
be enclosed.

All pages (BoQs & Terms & Conditions) are mandatory to be


signed and
Stamped, failing to comply with these conditions may lead to
wards the rejection of bid.

Page 6 of 6

You might also like