COMMENT SHEET
CLIENT : M/s HPCL, VIZAG EIL Job No. B016
PROJECT : VRMP : CPP (606) Transmittal No.
Document Name P&ID-REV-O CPP
Instrumentation
Review Code
01-OCT-2019
SADHNA SINGH (8424)
2 of 13
Page 2 of 13
9. As per Cl. 5.v (b), Calibration pot shown Nil Point closed -- --
Calibration pot to be in revised drawing
provided as per tender.
01-OCT-2019
SADHNA SINGH (8424)
3 of 13
Page 3 of 13
COMMENT SHEET
CLIENT : M/s HPCL, VIZAG EIL Job No. B016
PROJECT : VRMP : CPP (606) Transmittal No.
Document Name P&ID-REV-O CPP
Instrumentation
Review Code
10. BHEL to Capacity of Mixing and Sizing criteria Sizing criteria Nil Point closed.
explain the metering tank is based on document to be is storage for
basis for 2% solution submitted. 12 hrs and 2%
capacity concentration as Na3 solution
concentration.
PO4.12H2O and 12
hours storage time.
111 All drains within All individual drains Refer comments Complied. Nil Point closed.
the skid shall be within the skid are from HPCL. Drain to OWS
collected within the disposed to storm water. Chemical drains is shown.
skid at single point shall be connected
to OWS
and disposed to
storm water
12 Tag number Corrected in revised Nil Point closed. -- --
(serial drawing
number) of
motor is
different from
that of pump.
BHEL to
check and
correct
Type of LG Indicated in
and LT shall revised
be indicated in P&ID, Rev.3
the P&ID
01-OCT-2019
SADHNA SINGH (8424)
4 of 13
Page 4 of 13
COMMENT S HEET
CLIENT : M/s HPCL, VIZAG EIL Job No. B016
PROJECT : VRMP : CPP (606) Transmittal No.
Document Name P&ID-REV-O CPP
Instrumentation
Review Code
01-OCT-2019
SADHNA SINGH (8424)
5 of 13
Page 5 of 13
PLC and vice versa.
7. Gas detectors not indicated in As per BHEL Contractor Shown in relevant Noted Point
the P&ID. practice, HC response is not P&ID Closed.
analyzers will be acceptable. We
shown in the GA understand that
drawing and not in instead of HC
P&ID. analyzers , it’s
HC detector.
17. P&ID no. 1181(HP dosing Signals related to Contractor Complied in Noted Point
system): motors/drives response is not revised drawing. closed.
shall be as per acceptable. All
MCC signal, if any, shall be
Drive control control room
indicated in P&ID. philosophy. indication/com
(TYPICAL COMMENT) Hence, not mend shall be
shown separately shown with tag
in P&ID. no. in P&ID as
per BEDP-part-
B, section-9.
01-OCT-2019
SADHNA SINGH (8424)
6 of 13
Page 6 of 13
attached
01-OCT-2019
SADHNA SINGH (8424)
7 of 13
Page 7 of 13
As commented earlier,
Interconnecting line number is to
be mentioned.
NOTES
01-OCT-2019
SADHNA SINGH (8424)
8 of 13
Page 8 of 13
COMMENT SHEET
CLIENT : M/s HPCL, VIZAG EIL Job No. B016
PROJECT : VRMP : CPP (606) Transmittal No.
Document Name P&ID-REV-O CPP
Instrumentation
Review Code
01-OCT-2019
SADHNA SINGH (8424)
9 of 13
Page 9 of 13
9. As per Cl. 5.v (b), Calibration pot shown Nil Point closed -- --
Calibration pot to be in revised drawing
provided as per tender.
01-OCT-2019
SADHNA SINGH (8424)
10 of 13
Page 10 of 13
COMMENT SHEET
CLIENT : M/s HPCL, VIZAG EIL Job No. B016
PROJECT : VRMP : CPP (606) Transmittal No.
Document Name P&ID-REV-O CPP
Instrumentation
Review Code
10. BHEL to Capacity of Mixing and Sizing criteria Sizing criteria Nil Point closed.
explain the metering tank is based on document to be is storage for
basis for 2% solution submitted. 12 hrs and 2%
capacity concentration as Na3 solution
concentration.
PO4.12H2O and 12
hours storage time.
111 All drains within All individual drains Refer comments Complied. Nil Point closed.
the skid shall be within the skid are from HPCL. Drain to OWS
collected within the disposed to storm water. Chemical drains is shown.
skid at single point shall be connected
to OWS
and disposed to
storm water
12 Tag number Corrected in revised Nil Point closed. -- --
(serial drawing
number) of
motor is
different from
that of pump.
BHEL to
check and
correct
Type of LG Indicated in
and LT shall revised
be indicated in P&ID, Rev.3
the P&ID
01-OCT-2019
SADHNA SINGH (8424)
11 of 13
Page 11 of 13
COMMENT S HEET
CLIENT : M/s HPCL, VIZAG EIL Job No. B016
PROJECT : VRMP : CPP (606) Transmittal No.
Document Name P&ID-REV-O CPP
Instrumentation
Review Code
01-OCT-2019
SADHNA SINGH (8424)
12 of 13
Page 12 of 13
PLC and vice versa.
7. Gas detectors not indicated in As per BHEL Contractor Shown in relevant Noted Point
the P&ID. practice, HC response is not P&ID Closed.
analyzers will be acceptable. We
shown in the GA understand that
drawing and not in instead of HC
P&ID. analyzers , it’s
HC detector.
17. P&ID no. 1181(HP dosing Signals related to Contractor Complied in Noted Point
system): motors/drives response is not revised drawing. closed.
shall be as per acceptable. All
MCC signal, if any, shall be
Drive control control room
indicated in P&ID. philosophy. indication/com
(TYPICAL COMMENT) Hence, not mend shall be
shown separately shown with tag
in P&ID. no. in P&ID as
per BEDP-part-
B, section-9.
01-OCT-2019
SADHNA SINGH (8424)
13 of 13
Page 13 of 13