You are on page 1of 2

Salalah LPG Project

Contract No. : SLPG/08/2015


Petrofac Job No. : JI-2033

COMMENTS RESOLUTION SHEET


Discipline : STATIC Code A
Document Title :
Inspection and Test Plan for Field fabrication of Atmospheric/Condensate Contractor Transmittal No. : JI-2033-PECOL-SLPG-TS-1112 Date :28-08-2018
Tanks
Document No. : SLPG-Q-0000-04001-219-001-4 Rev : B Company Transmittal No. : JI-2033-SLPG-PECOL-TS-0807 Date : 13.10.2018
SR. Doc Rev Status
Page No. COMPANY COMMENTS CONTRACTOR RESPONSE
No. No. (Open / Closed)

A
WINTECO/ IOSS shall incorporate company
01 General comments in additions to Contractor Commnets are incorporated Closed
comments for this document, if applicable.

Refer mark-up copy of ITP enclosed with


this CRS. Comments provided for
02 General Atmospheric tanks (section-A) shall be In condensate tank also incorporated Closed
A
typically applicable for condensate tanks of
all relevant stages.

Contractor has not found reviewed the ITP Closed


03 General ITP has reviewed and signed in cover sheet
A by considering tanks are inspection level-1.

Document titel description shall be changed


04 General A Document title has changed Closed
as above.

FW tank inspection as per NFPA and API


05 General A whichever is stringent. We are following API standards Closed
Confirm

Contractor shall confirm Contract,


requirements of Project Specifications and
06 General
B applicable Codes and Standards, are
included unless any deviation is specifically
approved by Company.
Salalah LPG Project
Contract No. : SLPG/08/2015
Petrofac Job No. : JI-2033

COMMENTS RESOLUTION SHEET


Discipline : STATIC Code A
Document Title :
Inspection and Test Plan for Field fabrication of Atmospheric/Condensate Contractor Transmittal No. : JI-2033-PECOL-SLPG-TS-1112 Date :28-08-2018
Tanks
Document No. : SLPG-Q-0000-04001-219-001-4 Rev : B Company Transmittal No. : JI-2033-SLPG-PECOL-TS-0807 Date : 13.10.2018
SR. Doc Rev Status
Page No. COMPANY COMMENTS CONTRACTOR RESPONSE
No. No. (Open / Closed)

B All stage Inspection shall be witness by


07 General Contractors / Sub-contractors QA/QC
Engineer / Inspectors.

COMPANY SIGN OFF CONTRACTOR SIGN OFF

Prepared By: Anjani Kumar Singh

Date : 13.10.2018

Signature:

Approved By: Mohsin Al Harthy Approved by :

Signature:
Date : 13.10.2018 Date :

Signature: