You are on page 1of 2

COMPANY JOB Revisions

COUNTRY 0

Agip AREA CODE


PLANT /
Sheet / of Compiled Date
DEPT. REQUIRED DOCUMENTATION DATA SHEET
/

GATE VALVES FOR WELLHEAD


Delivery Delivery after order
P
O FOR APPROVAL FOR INFORM. FINAL
With offer
S
I
T DESCRIPTION OF Number of Number of Number Number of Number Number of Number
I
O copies/type copies/type of days copies/type of days copies/type of days
N
(1) (1) (1) (1)

01
Dimensional drawings and material list of
valves
02 Detail drawing of seating area of valve

03
Welding specification (for repairs) - (WPS)
Welders qualification procedure (PQR)

04 Inspection plans and inspection procedures

05
Documentation of inspections
(according to Inspection Data Sheet -"IDS")

06 Final documentation

07 Erection and maintenance manual

Spare parts on AGIP's form


08
(for start-up and two years operation)

09

10

11

12

13

M
O 14
D
.
M
15
E
C
.
16
V
L
I
. 17
2
0
2 18
/
0
NOTES : (1) N - Mat copies R - Reproducible copies on tracing paper M - Microfilm
S
H
C - On suitable magnetic EDP support (T) - Typical of the supplier (P) - Preliminary
.
0
1
INTERNAL NORMALIZATION This document is Company property.The Company lawfully reserves all rights.
COMPANY JOB Revisions
COUNTRY 0

Agip AREA CODE


PLANT /
Sheet / of Compiled Date
DEPT. REQUIRED DOCUMENTATION DATA SHEET
/

GATE VALVE FOR WELLHEAD

NOTES :

A) Drawings should be carried -out in accordance with the


Specification 05428.DOC.GEN.SDS "Basic forms for project and Internal
Normalization documentation".

B) All reproducible copies must be rolled and protected by card board tubes.

C) All documents shall be in English unless otherwise agreed by


the Purchaser.

D) On each documents shall be clearly indicated the Purchase order No.,


equipment No. and name, and the Supplier's identification No.

E) All documentations, unless otherwise specified,


must be addressed to:
AGIP S.p.A. - IMPI Engineering Department
20097 - S. Donato (MI) (ITALIA)
and marked for the attention of.............

M
O
D
.
M
E
C
.
V
L
I
.
2
0
2
/
0

S
H
.
0
2

INTERNAL NORMALIZATION This document is Company property.The Company lawfully reserves all rights.

You might also like