You are on page 1of 1

PROJECT : LANDICAN, BACLAYON PROJECT

DATE : MAY 22, 2020

BUDGET APPROVAL

No. of pcs Material Cost Total


796.4 ARCHITECTURAL PHP 15.00 PHP 11,946.00
796.4 STRUCTURAL PHP 25.00 PHP 19,910.00
15 PLUMBING PHP 350.00 PHP 5,250.00
89 ELECTRICAL PPE PHP 60.00 PHP 5,340.00
89 ELECTRICIAN RME PHP 30.00 PHP 2,670.00
796.4 FIRE AND LIFE SAFETY PLAN PHP 5.00 PHP 3,982.00
Total PHP 49,098.00

Prepared by: Approved by:

AR. REYNAN M. CIRUNAY MR. ARIEL GABUYA


ARCHITECT CEO / ALPDC

Checked by:

MR. IAN JOSEPH M. ECHAVIA


SENIOR DRAFTSMAN

You might also like