This document is a budget approval for the Landican, Baclayon Project dated May 22, 2020. It lists the materials, costs, quantities and totals for architectural, structural, plumbing, electrical, and fire and life safety plan items. The total budget approved is PHP 49,098.00. The budget was prepared by Architect Reynan M. Cirunay, approved by CEO Ariel Gabuya, and checked by Senior Drafstman Ian Joseph M. Echavia.
This document is a budget approval for the Landican, Baclayon Project dated May 22, 2020. It lists the materials, costs, quantities and totals for architectural, structural, plumbing, electrical, and fire and life safety plan items. The total budget approved is PHP 49,098.00. The budget was prepared by Architect Reynan M. Cirunay, approved by CEO Ariel Gabuya, and checked by Senior Drafstman Ian Joseph M. Echavia.
This document is a budget approval for the Landican, Baclayon Project dated May 22, 2020. It lists the materials, costs, quantities and totals for architectural, structural, plumbing, electrical, and fire and life safety plan items. The total budget approved is PHP 49,098.00. The budget was prepared by Architect Reynan M. Cirunay, approved by CEO Ariel Gabuya, and checked by Senior Drafstman Ian Joseph M. Echavia.