29/05/2020
1
Document Details
Author Modifications Date Version
Adrea Vui Draft 21.05.20 1.0
Adrea Vui Draft 22.05.20 2.0
Adrea Vui Draft 29.05.20 3.0
Approvals
This document requires the following approvals:
Name Role Signature Approval Version
Date
Steve Gates Director (Sponsor) 01.06.20 3.0
Distribution
This document has been distributed to:
Name Role Date of Version
Issue
Richard Hemps Business Analyst – Caring for Others 01.06.20 3.0
2
TABLE OF CONTENTS
INTRODUCTION.................................................................................................................................4
TREE STRUCTURE VIEW...................................................................................................................5
GLOSSARY OF TERMS.......................................................................................................................6
SPONSOR ACCEPTANCE....................................................................................................................7
3
INTRODUCTION
This document will provide the high-level requirement steps necessary to accomplish the
deliverables of this project. These steps will be broken down into phases of the construction
stage using a Work Breakdown Structure (WBS).
4
TREE STRUCTURE VIEW
5
GLOSSARY OF TERMS
Civil Works: The design, erection and conservation of the naturally built environment,
which could be in the form of roads, bridges, etc.
Module Mounting: The process of fixing solar panels to the roof, building face or concrete
foundations
6
SPONSOR ACCEPTANCE
___________________________________________ Date:____________________
Steve Gates
Director