Start-up
Establishing PIPB Feed to
Transalkylation Reactor(R-51002)
Final Approval:-
Phenolics Operations Department Manager:-
Mr. Khater-Al, Ali Abdullah
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 2 of 39
Record of revision:
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 3 of 39
Content :
1. Purpose:
2. Important system components/ equipment:
3. Potential consequences by failure system:
4. Precautions and Limitations:
5. Special Tools/Equipment:
6. Prerequisites:
7. Process Description:
8. Operating Tasks:
9. Chemical and physical Properties (MSDS):
10. Control system and strategy :
11. Interlocks:
12. Critical safety systems:
13. Safety and Health:
14. Environmental:
15. Quality:
16. Start up Procedure:
17. Table of Critical Operating Limits:
18. Checklist: All
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510013
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 4 of 39
References:
P & ID NO’S:
510-25F-2006: Transalkylation Reactor & Feed Heater.
510-25F-2009: Benzene Column.
510-25F-2013: Cumene Column.
510-25F-2014: Cumene col. Condenser, Bottom pumps & Product pumps.
510-25F-2017: PIPB Column.
510-25F-2018: PIPB Col. Rec. pumps, Bottom pump and Residue and Aromatic cooler.
510-25F-2021: Secondary Benzene Treaters.
PFD NO:
510-25F-1001: Cumene Area Reaction Section.
510-25F-1003: Cumene/PIPB Column.
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 5 of 39
1. Purpose:
To provide Operating Procedures for normal start up of establishing PIPB Feed to the Transalkylation Reactor
in safe and logical sequence.
In case of failure of PIPB feeding to Transalkylation Reactor, Cumene plant has to take shut down.
While the critical operation parameters are not maintained , trip system will active ( as per point No. 11 &
12 ) and catalyst tend to be damage.
4.1. All personnel are required to wear standard personal protective equipment (PPE).
4.2. Material Safety Data Sheets (MSDS) – All personnel working in the Cumene area must become familiar
with the associated Benzene, Cumene MSDS in his assigned work area.
4.3. Ensure all electrical equipment properly grounded.
4.4. Keep all Motor & coupling guards in its place.
4.5. All fire detector & fire protection system, gas leak detector system are in line & ready for use.
4.6. Establish good communication between Field & Control room persons.
4.7. Safety shower system is operational .
5. Special Tools/Equipment:
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 6 of 39
6. Prerequisites:
6.1. Ensure that the Product storage flushing and hydrocarbon make up is
C.O.
carried out as per procedure.
6.2. Ensure that all Cumene plant battery limit equipments ready for start-
F.O.
up.
6.3. Ensure that Vent collection system and flare systems are operational. C.O.
6.4. Ensure that all utilities and OSBL facilities are operational. F.O.
F.O.
6.4.1. Nitrogen for inerting
F.O.
6.4.2. Steam systems -all levels.
F.O.
6.4.3. Steam condensate system all levels.
F.O.
6.4.4. Cooling water circulation for coolers and condensers.
F.O.
6.4.5. Potable water for safety showers.
F.O.
6.4.6. Fire water system.
F.O.
6.4.7. UPS and Auxiliary Power system.
6.5. All spectacle blinds are in their normal operating positions as per P&ID.
L.O.
Refer checklist for Blinds # 17.6
6.6. Ensure that the Line-up system as per system line-up check list # 17.9 L.O.
6.7. Ensure that the nitrogen blanketing system is in working condition and
Cumene storage tank has been properly nitrogen blanketed. L.O.
6.8. Verify that all control valves have been stroke checked and close in C.O.
manual with 0% output and all control valve bypasses are close.
6.9. Ensure that the WF, CF and BZW system has been commissioned and is
L.O.
in operational condition.
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510013
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 7 of 39
6.11. All Safety valves have been lined up as per PSV list.
L.O.
Refer checklist for PSVs # 17.3
6.12. All Car Seal Open/Close valves have been lined up as per checklist.
L.O.
Refer to car seals Checklist # 17.4
6.14. All vents (pressure –vacuum safety valve and emergency relief hatch)
are commissioned and drains on lines and equipment are closed. L.O.
Refer checklist for Vents & Drains # 17.7
6.15. Ensure that the all sample collection valves are closed L.O.
6.16. Ensure all related motors are energized. Refer checklist for Electrical #
L.O.
17.8
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510013
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 8 of 39
7. Process Description:
DIPB and TIPB, collectively called as PIPB, which is recovered in the PIPB column and recycle benzene are
combined and reacted over the zeolite catalyst ( EM-5510) to form cumene, to increase the overall cumene
production.
The transalkylation of PIPB with benzene back to cumene is nearly isothermal with only a slight
temperature rise across the single bed catalyst.
The recycle benzene and recycle PIPB is combined in a 1 : 1 ratio and is heated to about 183 oC in the
Transalkylation Feed Heater , before being fed to Transalkylation Reactor.
The reaction is controlled at back pressure of 20 barG.
8. Operating Tasks:
9.1. Chemistry
C6H6 ( Benzene )
C6H5CH(CH3)2 ( Cumene )
To ensure all material inside the Transalkylation Reactor in liquid phase, the effluent is controlled at back
pressure of 20 barG.
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510013
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 9 of 39
The Transalkylation Reactor (R-51002) is online with 50% of the normal flow of benzene flowing through flow
control valve 510-FV-051 into the catalyst bed.
The start up Cumene material from PIPB Column (C-51041) during inventory is sent back to Benzene Column
(C-51021).
Once the PIPB column temperature and concentration profile is within specification, divert PIPB to
transalkylator.
510-TIC-050 temperature indication feed inlet to R-51002, cascade to steam flow to feed heater
Controllers of Benzene, Cumene and PIPB Column refer to SOP No. SK-Phenolics-SU-510002 / 510010/
510011 respectively.
11. Interlocks:
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 10 of 39
Flammable, toxic – cancer hazard ( TLV 2.5 ppm), causes skin irritation.
Concentrations in system 99.71 wt %
Benzene : Harmful or fatal if swallowed. Flammable liquid and vapor. Harmful if inhaled or absorbed
through skin. Causes irritation to skin, eyes and respiratory tract. Affect central nervous system.
Cumene : Harmful or fatal if swallowed. Flammable liquid and vapor. Harmful if inhaled or absorbed
through skin. Causes irritation to skin, eyes and respiratory tract. Affect central nervous system.
14.2. Cumene
Air :
When released into the air, this material is expected to be readily degraded by reaction with photo
chemically produced hydroxyl radicals.
Waste water :
When released into water, this material is expected to readily biodegrade. When released into water,
this material may evaporate to a moderate extent.
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510013
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 11 of 39
15. Quality:
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 12 of 39
Note:
The Transalkylation Reactor (R-51002) is online with 50% of the normal flow of benzene flowing
through flow control valve 510-FV-051 into the catalyst bed.
F.O
1.1. Start the PIPB Column Vacuum Pump (PK-51041) as per
procedure or by vendor’s procedure.
C.O
1.2. Gradually reduce the set point of 510-PIC-096A to 0.85 barg.
F.O
2.1. Open the upstream and downstream isolation valve in the feed
line from P-51032 A/B of 510-FV-079.
C.O
2.2. Open manually the feed to C-51041, 510-FV-079, and adjust the
flow.
C.O
2.3. Cascade the feed control valve 510-FV-079 with Cumene column
level controller 510-LIC-027.
3. Line up the start up Cumene material from PIPB Column (C-51041) back
to Benzene Column (C-51021).
F.O
3.1. Close the block valve of PIPB recycle line in the common
discharge of P-51043 A/B to E-51002.
F.O
3.2. Open the cross-over line (510-P-0045) between the transalk
ylator effluent and PIPB recycle line from P-51043 A/B, by
opening the two block valves.
C.O
3.3. Manually open flow control valve 510-FV-082 and divert start up
Cumene material to C-51021.
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510013
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 13 of 39
Note:
Now Benzene is circulating through transalkylator and mixed Cumene /Benzene stream through
510-PV-060 to C-51021.
Note:
If the PIPB column temperature and concentration profile is within specification, divert PIPB to transalkylator.
Note:
Now mixed stream of Recycle PIPB & Recycle Benzene is flowing through E-51002 to Transalkylator R-51002.
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510013
Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: March 27 ,2010
Subsystem: Transalkylation Reactor
Page 14 of 39
C.O
7. Set temperature controller 510-TIC-050, the feed temperature to the
transalkylator at 183oC.
C.O
8. Gradually increase the flow of PIPB to the transalkylator while
monitoring the level on the chimney tray #30 in the PIPB Column.
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 15 of 39
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 16 of 39
Item No. PSV No. Set Pressure P&ID No. Line No. Required Position Resp. Date Time Init.
1. PSV015A 40.0 bar G 510-25F-2006 510-P-0160 Open both u/s & d/s F.O
valves
2. PSV015B 40.0 bar G 510-25F-2006 510-P-0160 Open both u/s & d/s F.O
valves
3. PSV012A 39.0 bar G 510-25F-2006 510-P-0161 Open both u/s & d/s F.O
valves
4. PSV012B 39.0 bar G 510-25F-2006 510-P-0161 Open both u/s & d/s F.O
valves
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510013
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 17 of 39
Item No. PSV No. Set Pressure P&ID No. Line No. Required Position Resp. Date Time Init.
5. PSV023 52.20 bar G 510-25F-2006 V-51002 Open both u/s & d/s F.O
valves
6. PSV024 52.0 bar G 510-25F-2009 V-51023 Open both u/s & d/s F.O
valves
7. PSV030A 3.50 bar G 510-25F-2013 510-P-0163 Open both u/s & d/s F.O
valves
8. PSV030B 3.50 bar G 510-25F-2013 510-P-0258 Open both u/s & d/s F.O
valves
9. PSV030C 3.50 bar G 510-25F-2013 510-P-0259 Open both u/s & d/s F.O
valves
10. PSV110 52.0 bar G 510-25F-2013 510-HS-0001 Open both u/s & d/s F.O
valves
11. PSV063 26.9 bar G 510-25F-2014 510-CWR-0013 Open both u/s & d/s F.O
valves
12. PSV-013A 3.50 bar G 510-25F-2017 510-P-0164 Open both u/s & d/s F.O
valves
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510013
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 18 of 39
Item No. PSV No. Set Pressure P&ID No. Line No. Required Position Resp. Date Time Init.
13. PSV-013B 3.50 bar G 510-25F-2017 510-P-0164 Open both u/s & d/s F.O
valves
14. PSV-027 52.0 bar G 510-25F-2017 510-HS-0002 Open both u/s & d/s F.O
valves
15. PSV-038 5.0 bar G 510-25F-2018 510-P-0394 Open both u/s & d/s F.O
valves
16. PSV-016 29.9 bar G 510-25F-2018 510-CWR-0018 Open both u/s & d/s F.O
valves
17. PSV-053 39.30 bar G 510-25F-2021 510-P-0167 Open both u/s & d/s F.O
valves
18. PSV-054 39.30 bar G 510-25F-2021 510-P-0168 Open both u/s & d/s F.O
valves
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510013
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 19 of 39
Item P&ID No. Line No. Car Sealed Valve Location Position Resp. Date Time Init.
No. Description
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 20 of 39
Item P&ID No. Line No. Car Sealed Valve Location Position Resp. Date Time Init.
No. Description
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 21 of 39
Item P&ID No. Line No. Car Sealed Valve Location Position Resp. Date Time Init.
No. Description
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 22 of 39
Item P&ID No. Line No. Tag No Service Resp. Date Time Init.
No.
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 23 of 39
Item P&ID No. Line No. Tag No Service Resp. Date Time Init.
No.
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 24 of 39
Item P&ID No. Line No. Tag No Service Resp. Date Time Init.
No.
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 25 of 39
Item No. P&ID No. Line No. Location Description. Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 26 of 39
Item No. P&ID No. Line No. Location Description. Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 27 of 39
Item No. P&ID No. Line No. Location Description. Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 28 of 39
Item No. P&ID No. Line No. Location Description Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 29 of 39
Item No. P&ID No. Line No. Location Description Required Resp. Date Time Init.
Position
14. 510-25F-2006 517-HS-0010 Drain valve on D/s of 510- Closed & F.O
FV-050 Blinded
15. 510-25F-2006 517-HS-0010 Drain valve on D/S block Closed & F.O
valve on D/S of 510-FV-050 Blinded
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510013
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 30 of 39
Item No. P&ID No. Line No. Location Description Required Resp. Date Time Init.
Position
16. 510-25F-2006 V-51002 Drain valve on U/S of PSV- Closed & F.O
023 Plugged
17. 510-25F-2006 510-AV-0001 Drain valve on D/S of PSV- Closed & F.O
023 Plugged
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 31 of 39
Item No. P&ID No. Line No. Location Description Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 32 of 39
Item No. P&ID No. Line No. Location Description Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 33 of 39
Item No. P&ID No. Line No. Location Description Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 34 of 39
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position
1. 510-25F-2006 510-P-0114 Block valve on U/S of check valve from Open F.O
P-51043A or B to E-51002
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 35 of 39
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position
8. 510-25F-2006 510-P-0050 Block valve on D/S of startup bypass line Open F.O
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 36 of 39
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position
26. 510-25F-2017 517-HS-0014 Main Steam block valve on U/S of ESV- Open F.O
114
27. 510-25F-2017 517-HS-0014 Bypass of Main Steam valve on U/S of Close F.O
ESV-114
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 37 of 39
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position
35. 510-25F-2018 510-P-0113 Bypass valve of Check valve of P-51043A Close F.O
discharge
38. 510-25F-2018 510-P-0113 Bypass valve of Check valve of P-51043B Close F.O
discharge
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 38 of 39
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position
41. 510-25F-2018 510-P-0120 Bypass valve of Check valve of P-51042A Close F.O
discharge
44. 510-25F-2018 510-P-0120 Bypass valve of Check valve of P-51042B Close F.O
discharge
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: March 27, 2010
Subsystem: Transalkylation Reactor
Page 39 of 39
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position