` Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: Mar 14 ,2010
Subsystem: Transalkylation Reactor
Page 1 of 31
Start-up
Transalkylation Reactor Drying
( R-51002)
Developed By J.B.Mahadik
Final Approval:-
Phenolics Operations Department Manager:-
Mr. Khater-Al, Ali Abdullah
Record of revision:
Content :
1. Purpose:
2. Important system components/ equipment:
3. Potential consequences by failure system:
4. Precautions and Limitations:
5. Special Tools/Equipment:
6. Prerequisites:
7. Process Description:
8. Operating Tasks:
9. Chemical and physical Properties (MSDS):
10. Control system and strategy :
11. Interlocks:
12. Critical safety systems:
13. Safety and Health:
14. Environmental:
15. Quality:
16. Start up Procedure:
17. Table of Critical Operating Limits:
18. Checklist: All
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510009
` Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: Mar 14 ,2010
Subsystem: Transalkylation Reactor
Page 4 of 31
References:
P&ID No :
510-25F-2004: Alkylation Reactor Circulation Pump & circulation cooler
510-25F-2005: Alkylation Reactor.
510-25F-2006: Transalkylation Reactor & Feed Heater.
510-25F-2007: Transalkylation reactor start-Up Heater.
510-25F-2009: Benzene Column.
510-25F-2021: Secondary Benzene Treaters.
PFD NO:
510-25F-1001: Cumene area reaction section.
1. Purpose:
To provide Standard Operating Procedure for Transalkylation reactor drying and associated equipments in
start up service in a safe and efficient manner.
In case of failure of the Transalkylation Reactor drying, plant will have much water in the system and
catalyst life will be shortened and Cumene Plant has to take shut down.
While temperature is not controlled during drying activities, catalyst could be damaged .
5. Special Tools/Equipment:
6. Prerequisites:
6.1. Ensure that the Product storage flushing and hydrocarbon make up is
C.O.
carried out as per procedure.
6.2. Ensure that all Cumene plant battery limit equipments ready for start-
F.O.
up.
6.3. Ensure that Vent collection system and flare systems are operational. C.O.
6.4. Ensure that all utilities and OSBL facilities are operational F.O
F.O.
6.4.1. Nitrogen for inerting
F.O.
6.4.2. Steam systems -all levels.
F.O.
6.4.3. Steam condensate system all levels.
F.O.
6.4.4. Cooling water circulation for coolers and condensers.
F.O.
6.4.5. Potable water for safety showers.
F.O.
6.4.6. Fire water system.
F.O.
6.4.7. UPS and Auxiliary Power system.
6.5. Ensured that all commissioning steps are carried out with respect to
F.O.
mechanical completion.
6.6. All spectacle blinds are in their normal operating positions as per P&ID.
F.O.
Refer checklist for Blinds # 18.5
6.7. Ensure that the Line-up system as per system line-up check list # 18.8 F.O.
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510009
` Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: Mar 14 ,2010
Subsystem: Transalkylation Reactor
Page 7 of 31
6.8. Ensure that the nitrogen blanketing system is in working condition F.O.
6.9. Verify that all control valves have been stroke checked and close in C.O
manual with 0% output and all control valve bypass are close.
6.10. Ensure that the PCS and BZW system has been commissioned and is in
F.O.
operational condition.
6.12. All Safety valves have been lined up as per PSV list.
F.O.
Refer checklist for PSVs # 18.2
6.13. All Car Seal Open/Close have been lined up as per checklist.
F.O.
Refer to car seals Checklist # 18.3
6.15. All vents (pressure –vacuum safety valve and emergency relief hatch)
are commissioned and drains on lines and equipment are closed. F.O.
Refer checklist for Vents & Drains # 18.6
6.16. Ensure that the all sample collection valves are closed F.O.
6.17. Ensure all Pump motors are energized. Refer checklist for Electrical #
F.O.
18.7
7. Process Description:
The catalyst in the Transalkylation reactor contains of moisture that is picked up during transportation to site,
during storage on site and when the catalyst is loaded into the reactors. This moisture is extracted from the
catalyst with circulating dry benzene at elevated temperature and is removed from the system via the
Benzene Column Reflux Drum water boot.
8. Operating Tasks:
9.1. Chemistry
C6H6 Benzene
9.2. Physical properties
Benzene is liquid material, colorless, sweet odor which is extremely hazardous.
As a liquid, vapor, or mist is readily absorbed through the skin, mucous membranes, gastrointestinal and
respiratory tracts, and can cause cancer .
Moisture that present in the catalyst and the system to be removed less than 100 wt ppm by
circulating dry benzene at elevated temperature. To avoid catalyst damage during this stage, drying
progress to be controlled in range of temperature difference between circulated benzene and the
top of catalyst bed is less than 28 oC.
Benzene is line up into the start up heater to increase temperature by controlling the outlet
temperature against high pressure steam flow.
510-TIC-050 temperature indication control of recycle inlet of transalkylation reactor , with high
and low alarm temperature on DCS
11. Interlocks:
1. 510-S-002 Low low recycle benzene flow Close FV-008/050, ESV-117, ESD-116
5. 510-S-009 Low low level in V-51021 , ESD Close HV-121 and stop P-51021 A/B
pushbutton on console at UCB or at
field
510-HV-121 not open Stop P-51021 A/B
ESD pushbutton on console at UCB or Close HV-122 and stop P-51024 A/B
at field
12.1. Temperature difference between recycle benzene and top catalyst bed is not more than 28oC
12.2. Reactor outlet moisture content to be less than 100 wt ppm
Flammable, toxic – cancer hazard ( TLV 2.5 ppm), causes skin irritation.
Concentrations in system 99.71 wt %
14. Environmental:
14.1. Air :
It will usually either break down or decompose over a few days, with the products eventually ending up
in the air. It can be washed out of the air by rain, but will evaporate and continue to contaminate the air.
It can attach to rain or snow and be carried back down to the ground.
15. Quality:
2.1. Open the vent valve on upstream of the cooling water return
F.O
line block valve.
2.4. Close the vent valve when air is removed and only cooling
F.O
water comes out. Install blind on the vent valve.
2.5. Open the cooling water return block valve gradually. F.O
2.6. Open cooling water supply totally. Check for any leakage F.O
4.5. Open the block valve on line 510-P-0021 to the top of the
F.O
Transalkylator.
Note:
Monitor the temperatures of the Benzene stream and the Catalyst bed in the
Transalkylator, Differential temperature should not exceed 28°C.
5.2. Open the inlet and outlet valves of E-51002 and set the Recycle
Benzene flow to 5000 kg/hr on 510-FIC-051 to Transalkylation C.O
Feed Heater E-51002.
Note:
When the Transalkylator bed temperature increases to 70°C, increase the Recycle Benzene flow and temperature.
Note:
At this point, Recycle Benzene temperature flowing through Transalkylator is 98°C and the bed temperature is 70°C.
WARNING:
THE STEPS 1.6 AND 1.7 REQUIRE HEAT AND HEARING PROTECTION.
7.1. Open the steam valve 510-FV-050 gradually and start heating
up the Transalkylation Feed Heater. Open the steam in steps
of 3-5% if the temperature in the bottom doesn’t rise.
Repeat this step until the desired temperature and pressure C.O
has been reached. (Condensate is still not aligned to the
condensate header). Keep monitoring the pressures and
temperatures of the Transalkylator.
7.3. Line up the condensate to the header and close the drain: If
the desired temperature and pressure are reached and the
F.O
condensate sample is within the conductivity specification.
Mount the blind to the drain line which were removed.
8.2. Slowly increase the set point of 510-TIC-050 to 200°C until the
C.O
transalkylator bed temperatures reaches to 175°C.
Note:
Monitor 510-TIC-050 and bed temperatures 510-TI-051,510-TI-052,510-TI-053, 510-TI-054, 510-TI-
055 and adjust the set point if temperature differential is more than 28°C.
Phenolics-Cumene Doc. No.: SK-Phenolics-SU- 510009
` Rev. No.: 1
Plant Start-Up
System: Alkylation and Transalkylation
Date: Mar 14 ,2010
Subsystem: Transalkylation Reactor
Page 15 of 31
11.4. Close the Transalkylator filling line valves, drain and swing the
C.O
spectacle blind in close position.
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510009
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 16 of 31
Process Consequences of
Operating Safe Safe Consequences
Variable deviating outside Safety Systems or
Range Alarms Required Actions Upper Lower of deviating Outside of
(Variable and of normal Required Actions
(Units) Limit Limit Safe Operating Limits
Tag Number) operating range
Reactor Catalyst may get
damaged, maintain 28°C
At low temp.
differential temperature
Reactor Catalyst Maintain 510-TIC-050 Maintain 510-TIC-050
510-TIC-050 175-200°C 207oC 200°C 175°C between Reactor inlet
may not dry temperature. temperature.
510-TIC-050 & Reactor
perfectly
bed temperatures 510-TI-
051 to 510-TI-055.
Reactor Catalyst may get
damaged, maintain 28°C
At low temp.
Maintain 510-TI-051 differential temperature Maintain 510-TI-051 to
Reactor Catalyst
510-TI-051 175-200°C - to 510-TI-055 200°C 175°C between Reactor inlet 510-TI-055
may not dry
temperatures. 510-TIC-050 & Reactor temperatures.
perfectly
bed temperatures 510-TI-
051 to 510-TI-055.
C-51021 will be operated
C-51021 will be
Maintain 510-PIC-060 at higher pressure Maintain 510-PIC-060
510-PIC-060 20.0 bar g 21 barg operated at higher 20.0 bar g -
pressure resulting in benzene pressure
pressure.
going to flare.
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510009
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 17 of 31
18. Checklist :
18.1. Safety Devices Checklist:
Item PSV No. Set Pressure P&ID No. Line No. Required Position Resp. Date Time Init.
No.
1. PSV017A 11.0 bar G 510-25F-2004 510-CWR-0009 Open both u/s & d/s valves F.O
2. PSV017B 11.0 bar G 510-25F-2004 510-CWR-0009 Open both u/s & d/s valves F.O
3. PSV011A 40.0 bar G 510-25F-2005 510-P-0159 Open both u/s & d/s valves F.O
4. PSV011B 40.0 bar G 510-25F-2005 510-P-0159 Open both u/s & d/s valves F.O
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510009
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 18 of 31
Item PSV No. Set Pressure P&ID No. Line No. Required Position Resp. Date Time Init.
No.
5. PSV015A 40.0 bar G 510-25F-2006 510-P-0160 Open both u/s & d/s valves F.O
6. PSV015B 40.0 bar G 510-25F-2006 510-P-0160 Open both u/s & d/s valves F.O
7. PSV012A 39.0 bar G 510-25F-2006 510-P-0161 Open both u/s & d/s valves F.O
8. PSV012B 39.0 bar G 510-25F-2006 510-P-0161 Open both u/s & d/s valves F.O
9. PSV023 52.20 bar G 510-25F-2006 V-51002 Open both u/s & d/s valves F.O
10. PSV007 39.0 bar G 510-25F-2007 510-P-0026 Open both u/s & d/s valves F.O
11. PSV024 52.0 bar G 510-25F-2009 510-HS-0004 Open both u/s & d/s valves F.O
12. PSV016 29.90 bar G 510-25F-2018 510-CWR-0018 Open both u/s & d/s valves F.O
13. PSV038 5.0 bar g 510-25F-2018 510-P-0394 Open both u/s & d/s valves F.O
14. PSV053 39.30 bar G 510-25F-2021 510-P-0167 Open both u/s & d/s valves F.O
15. PSV054 39.30 bar G 510-25F-2021 510-P-0167 Open both u/s & d/s valves F.O
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510009
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 19 of 31
Item P&ID No. Line No. Car Sealed Valve Location Position Resp. Date Time Init.
No. Description
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 20 of 31
Item P&ID No. Line No. Car Sealed Valve Location Position Resp. Date Time Init.
No. Description
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 21 of 31
Item P&ID No. Line No. Car Sealed Valve Location Position Resp. Date Time Init.
No. Description
Item P&ID No. Line No. /Eqpt. No. Tag No Service Resp. Date Time Init.
No.
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 22 of 31
Item P&ID No. Line No. /Eqpt. No. Tag No Service Resp. Date Time Init.
No.
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 23 of 31
Item P&ID No. Line No. /Eqpt. No. Tag No Service Resp. Date Time Init.
No.
Item No. P&ID No. Line No./Eqpt. No. Location Description. Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 24 of 31
Item No. P&ID No. Line No./Eqpt. No. Location Description. Required Resp. Date Time Init.
Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 25 of 31
Item P&ID No. Line No./Eqpt. No. Location Description Required Resp. Date Time Init.
No. Position
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 26 of 31
Item P&ID No. Line No./Eqpt. No. Location Description Required Resp. Date Time Init.
No. Position
13. 510-25F-2006 R-51002 Drain valve at the bottom of R-51001 Closed & F.O
Blinded
14. 510-25F-2006 510-P-0050 Drain valve to BZW on U/S of block valve Closed F.O
on R-51001 bottom to C-51021
15. 510-25F-2006 510-P-0050 Drain valve to BZW on D/S of block valve Closed F.O
on R-51001 bottom to C-51021
16. 510-25F-2006 510-P-0041 Drain valve to BZW on U/S of 510-FV-051 Closed F.O
17. 510-25F-2006 510-P-0049 Drain valve in between double block Closed F.O
valve assembly to BZW
18. 510-25F-2006 517-HS-0010 Drain valve on D/s of 510-FV-050 Closed & F.O
Blinded
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510009
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 27 of 31
Item P&ID No. Line No./Eqpt. No. Location Description Required Resp. Date Time Init.
No. Position
19. 510-25F-2006 517-HS-0010 Drain valve on D/S block valve on D/S of Closed & F.O
510-FV-050 Blinded
20. 510-25F-2006 V-51002 Drain valve on U/S of PSV-023 Closed & F.O
Plugged
21. 510-25F-2006 510-AV-0001 Drain valve on D/S of PSV-023 Closed & F.O
Plugged
24. 510-25F-2009 510-P-0050 Drain valve to BZW on D/S of 510-PV- Closed F.O
0060
25. 510-25F-2018 510-P-0114 Drain valve to BZW on D/S of 510-FV-082 closed F.O
Phenolics- Cumene Doc. No.: SK-Phenolics-SU-510009
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 28 of 31
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position
1. 510-25F-2004 510-P-0036 Double block valve assembly near interconnection Open F.O
of line 510-P-0008
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 29 of 31
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position
6. 510-25F-2005 510-P-0038 Double block valve assembly on U/S of FE-012 Open F.O
10. 510-25F-2006 510-P-0021 Block valve to R-51002 Filling line Open F.O
11. 510-25F-2006 510-P-0050 Double block valve assembly on U/S start up Open F.O
Bypass line
12. 510-25F-2006 510-P-0050 Block valve on D/S of startup bypass line Open F.O
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 30 of 31
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position
16. 510-25F-2006 510-P-0043 Double block valve assembly from E-51002 to R- Open F.O
51001
21. 510-25F-2006 517-HS-0010 Main block valve on HS line on U/S of FE-050 Open F.O
22. 510-25F-2006 517-HS-0010 Bypass of Main block valve of HS line on U/S of FE- Close F.O
050
Rev. No.: 1
Plant Start-Up
System : Alkylation and Transalkylation
Rev. Date: Mar 14, 2010
Subsystem: Transalkylation Reactor
Page 31 of 31
Item P&ID No. Line No. Location Description Required Resp. Date Time Init.
No. Position