You are on page 1of 2

NO DESCRIPTION UNIT QTY

EXCAVATION AND EARTHWORK

Site Preparation

Cutiing down trees and grubbing up their roots


including filling in voids and well rammed with
clean earth, of

A not exceeding 300 mm girth NO 5

B exceeding 600 mm and not exceeding 900 mm NO 3

C exceeding 900 mm and not exceeding 1200 mm NO 1


NO. DESCRIPTION UNIT QTY

EXCAVATION AND EARTHWORK (cont'd)

Excavation

Excavating to reduce level

A maximum depth not exceeding 0.25 m m³ 200

B maximum depth not exceeding 1.00 m m³ 75

Excavating trenches to receive foundations

C starting from reduced level, maximum depth not m³ 10


exceeding 1.00 m

D ditto, maximum depth not exceeding 4.00 m m³ 35

E starting from ground levels, maximum depth not m³ 15


exceeding 1.00 m

F ditto, maximum depth not exceeding 2.00 m m³ 20

G ditto, maximum depth not exceeding 4.00 m, m³ 5


curved on plan

You might also like