PSC Girder Design
PSC Girder Design
Transverse Members
End Crossgirder 0.794
0.240
A Yt Ayt Ayt2 Iself
Torsion due to Bending Moment effect = M/R Radius of Curvature = infinity for the straight girders
0.18
0.10
Girder Length 19.2 m
Span of girder c/c of bearing 18.571 m
L/D 10.67 0.300
Girder overhang on bearing 0.314 m
0.20
0.24
Mid span Support 0.60 0.60
Width of top flange(PSC) 1.000 1.000 m. Midspan End(supports)
Width of bot flange(PSC) 0.600 0.600 m.
Thk of top flange 0.180 0.180 m.
Thk of bot flange 0.240 0.000 m.
Web thickness 0.300 0.600 m.
Thk of top fl at web 0.280 0.237 m.
Thk of bot fl at web 0.440 0.000 m.
Depth of girder 1.500 1.500 m. 1.8 1.5
Thickness of top slab 0.240 0.240 m. Web Taper profile
Beff of top slab 2.650 2.650 m. =MIN(spacing,12*web thk))*Eslab/Egird
Spacing of girders 2.650
Actual width of slab 2.325 Outer Girder slab
Mid span Supports
SECTION PROPERTIES web top flange bot flange web top flange bot flange Slab
Area 0.450 0.126 0.035 0.072 0.030 0.900 0.072 0.011 0.000 0.00 0.636
x from bottom 0.750 1.410 1.287 0.120 0.307 0.750 1.410 1.301 0.000 0.000 1.620
distance from cg 0.061 0.599 0.476 0.691 0.504 0.055 0.605 0.496 0.000 0.000 0.428
Moment 0.084 0.000 0.000 0.000 0.000 0.169 0.000 0.000 0.000 0.000 0.003
Total Moment 0.182 0.201
Moment I yy 0.003 0.002 0.039 0.000191 0.00459 0.027 0.00031 0.007 0 0
Total Moment Iyy 0.049 0.034
PRE-CAST GIRDER mid span Support Torsional Property (for use in staad)
Area 0.713 0.983 m2 mid end
Area * x 0.578 0.791 slab 0.010 0.010
cg. Of girder 0.811 0.805 m web 0.008 0.071
Mom of inertia 0.182 0.201 m4 top fl 0.002 0.002
Top cg 0.689 0.695 m bot fl 0.002 0.000
Ztop 0.264 0.289 m3 Ixx = 0.022 0.083
Zbot 0.224 0.250 m3
2
C/S Area of Girder = 0.7 m
.
. . U.D.L due to Dead Load = 0.7 x 25
= 17.8 kN/m
2
Additional Area at End Section = 0.983 - 0.713 m
.
. . U.D.L due to Dead Load = 0.270 x 25
= 6.8 kN/m
24.6 kN/m
17.8 kN/m
support Centreline
support reaction of girder only = 2.1145 x 24.6 + 1.5 x 21.21
+ 17.8 x 5.9855
= 190.486 KN
Section No. 1--1 2--2 3--3 4--4 5--5 6--6
Section at Support 0.9D L/8 L/4 3L/8 L/2
Distance (x) 0 1.35 2.32 4.64 6.96 9.29
Shear (kN) 182.8 149.6 131.5 82.8 41.4 0.0
Moment(kNm) -1.2 233.5 435.2 633.6 795.7 861.6
Descriptions
1--1 2--2 3--3 4--4 5--5 6--6
Prestress Stage I σt 4.89 2.12 0.97 -0.98 -2.83 -3.18
σb 7.48 10.75 13.59 19.83 22.20 22.10
Dead Load σt 0.00 0.81 1.55 2.40 3.01 3.26
σb 0.00 -0.94 -1.81 -2.82 -3.55 -3.84
Resultant σt 4.88 2.92 2.52 1.42 0.19 0.08
σb 7.49 9.82 11.78 17.01 18.66 18.27
Sections 1--1 2--2 3--3 4--4 5--5 6--6
4.88 2.92 2.52 1.42 0.19 0.08
Losses 2
Losses from Stage I prestress to addition of Deckslab I.e., 28 days to 42 days
Creep of Concrete:- (Vide Cl:11.1 of I.R.C:-18-2000)
1--1 2--2 3--3 4--4 5--5 6--6
Prestress Stage I σt 4.66 2.01 0.92 -0.94 -2.69 -3.03
σb 7.12 10.24 12.94 18.89 21.14 21.05
Dead Load σt 0.00 0.81 1.55 2.40 3.01 3.26
σb 0.00 -0.94 -1.81 -2.82 -3.55 -3.84
Resultant σt 4.7 2.8 2.5 1.5 0.3 0.2
σb 7.1 9.3 11.1 16.1 17.6 17.2
Losses 3
Losses from addition of Deckslab till addition of SIDL I.e., 42 days to 60 days
Creep of Concrete:- (Vide Cl:11.1 of I.R.C:-18-2000)
1--1 2--2 3--3 4--4 5--5 6--6
Prestress Stage I σt 4.57 1.98 0.91 -0.92 -2.64 -2.97
σb 6.99 10.04 12.69 18.52 20.74 20.64
Dead Load σt 0.00 0.81 1.55 2.40 3.01 3.26
σb 0.00 -0.94 -1.81 -2.82 -3.55 -3.84
Deck Slab + Diaphragm σt 0.00 0.61 1.03 1.90 2.43 2.67
σb 0.00 -0.71 -1.20 -2.24 -2.86 -3.14
Resultant σt 4.6 3.4 3.5 3.4 2.8 3.0
σb 7.0 8.4 9.7 13.5 14.3 13.7
Total Time dependent Losses 4 (I)= 51.82 + 35.3 + 43.12 = 130.2 MPa.
% loss (of initial stress) for stage I= 130.23 / 1191 = 10.930 % Loss 4
Final stress (with 50% LL) σt 4.25 3.79 4.29 4.60 4.56 4.79
(for temperature check) σb 4.81 4.82 4.69 6.48 5.95 5.20
Remarks about Stresses at various Conditions.
(Vide Cl: 7.1 to 7.1.4 of IRC:-18-2000 )
Permissible Stress in Concrete at Stage I Prestress
Maximum Compressive Stress immediately after Prestressing shall not exceed minimum of the following
20 N/mm 2 or 0.5 Fcj
Fcj = Expected Concrete Strength at the time of Prestressing.
2
= 0.5 x 40 = 20 N/mm
2
Max Compressive Stress developed = 17.60 N/mm Hence O.K
Temporary Tensile Stress in the extreme fibre immediately after Prestressingshall not exceed,
= 1 of Maximum Compressive Stress immediately after Prestressing
10
2
= -1 x 17.60 = -1.76 N/mm
10 x x
2
Minimum Stress developed = 0.08 N/mm Hence O.K
Minimum reinforcement
IRC 18-2000: cl.15.1 atleast 10 mm dia bar at not greater than 200 mm.
IRC 18-2000: cl.15.2 Vertical dirn. 0.18% of web area
IRC 18-2000: cl.15.3 Longit. Min. 0.15% of c/s area for Upto M45; beyond M45, 0.18%.
min Longit. Steel reqd 1069.5 mm2 10 dia 14 Nos in web+top+bot flange
min Web vertical steel 540 mm2/m 10 dia 2 lg 200 mm spacing
(Note: the values given here are only as a check for min. steel. Actual steel provided is checked in the
following sections)
Q (of slab at critical pl.) 0.17 0.17 0.17 0.17 0.17 0.17
Shear flow KN/m 0 11 140 79 64 65
0.4*L*(fck)^.5 (slab) 1214 1214 1214 1214 1214 1214 IRC 22:cl 611.5.1
0.7*As*fy+.08*L*(fck)^.5 749 749 749 749 749 749 IRC 22:cl 611.5.1
(based on slab reinft of .9%) 1 1 1 1 1 1 Safe
Ast/m (in slab) min 1157 1157 1157 1157 1157 1157 IRC 22:cl 611.5.2.3
Ast prov. In slab (16@150) 2680 2680 2680 2680 2680 2680
1 1 1 1 1 1 Safe
Min Ast reqd in Top flange 1131 1131 1131 565 565 565 mm2/ m 50% of web
Min Ast reqd in Bot flange 1131 1131 1131 589 565 699 mm2/ m 50% of web
Provide 16@ 200 200 200 200 200 200 mm
Ast provided = 1005 1005 1005 1005 1005 1005 mm2/ m
Longitudinal steel in top flange 6 Nos 12 dia 679 mm2 Reqd is 340 OK
Longitudinal steel in web (mid) 12 Nos 10 dia 942 mm2 Reqd is 360 OK
Extra Longl. steel in web (end) 12 Nos 10 dia 942 mm2 Reqd is 1448 OK
Longitudinal steel in bot flange 6 Nos 12 dia 679 mm2 Reqd is 587 OK
L4
Y4
Bearing
CL
-X3 +X3
Y3
L/2
Y2
Y1
Xa X3 X2 X1
314.5
Elevation of a typical Cable
Typical cases of slip loss
Po
P1 X4
P4
P2
Po' P3
Case 1 (X4 case)
P1'
L1 L2
L3
Po
P1 P2
X5
P4
P3
Po' Case 2 (X5 case)
P2'
P1'
L1
L2
L3
Po
P1
P2 P3
Case 3 (Y5 case)
Y5
P0' P1' P2' P3'
L1
L2
L3
CABLE PROFILE(Stressing from both ends) base len gir len diff
Cable nos 1 2 3 19.96 19.2 0.76
No. of cables 1 1 1
Total force 3491 2572 3491
Check for length 9.450 9.450 9.450 9.450 Total length - 150 mm for setting
Xa 0 0 0 0 mm extra length of cable)
X1 0.120 0.620 1.120
Y1 0.480 0.300 0.120
Y1+Y2+Y3 1.5 0.350 1.150 0.750 0.350
X3 1.000 1.000 1.000
Y4a (hor splay 1) 0.000 0.000 0.000
L4a 1.000 1.500 1.500
Y4a (hor splay 2) 0.000 0.000
L4b 1.000 1.000
X2 8.330 7.830 7.330
c=(Y2+Y3)/X2(X2+2*X3) 0.008 0.006 0.003
a1 Atan(2*c*X2)(Rad) 0.129 0.091 0.049
(degree) 7.388 5.229 2.821
Y2 = 0.540 0.358 0.181
L1 = X3/cosa1 1.008 1.004 1.001
L2 = L1+X2+2y2^2/3*X2 9.362 8.845 8.334
L3 = L2+X1 9.482 9.465 9.454
a2 =2*Atan(2*Y4/X4) 0.000 0.000 0.000
Stress before slip (UTS)
P0 0.700 0.700 0.700
P1 =Po/Exp(kL1) 0.699 0.699 0.699
P2 =Po/Exp(u(a1+a2)+kL2) 0.672 0.677 0.683
P3 =Po/Exp(u(a1+a2)+kl3) 0.672 0.676 0.681
At 3l/8 2.32138
Yb 0.811 0.811 0.811
Yc 0.518 0.317 0.125
a radian 0.034 0.020 0.008
e=Yb-Yc 0.293 0.494 0.686 avg ecc 0.49098 m
Pi 2259.7 1655.9 2270.8
Picosa 2258.4 1655.6 2270.7
Pisina 77.4 32.9 18.3
Picosa*e 661.6 817.5 1557.4
At quarter span4.64275
Yb 0.811 0.811 0.811
Yc 0.639 0.395 0.162
a radian 0.070 0.047 0.024
e=Yb-Yc 0.171 0.416 0.649 avg ecc 0.41272 m
Pi 2233.9 1639.5 2253.2
Picosa 2228.4 1637.7 2252.6
Pisina 157.2 77.1 53.4
Picosa*e 382.0 681.5 1461.9
At 0.9D 7.9355
Yb 0.805 0.805 0.805
Yc 0.956 0.613 0.276
a radian 0.122 0.086 0.046
e=Yb-Yc -0.151 0.192 0.529 avg ecc 0.19215 m
Pi 2197.4 1616.3 2228.3
Picosa 2181.1 1610.4 2225.9
Pisina 266.8 138.1 102.1
Picosa*e -329.1 308.9 1176.4
At support 9.2855
Yb 0.805 0.805 0.805
Yc 1.150 0.750 0.350
a radian 0.130 0.092 0.049
e=Yb-Yc -0.345 0.055 0.455 avg ecc 0.05796 m
Pi 2187.6 1609.7 2220.3
Picosa 2169.2 1602.9 2217.6
Pisina 283.0 147.2 109.4
Picosa*e -749.0 87.7 1008.4
Type No of Force in Duct dia Jack Type Cable Elongati angle at Stressin
strands Cable (mm) (or eqv) Length on (each anchora g Stage
stressed (jack) (mm) end) ge (deg)
(kN) (mm)
Cable No.
1 19-T-13 19 2443.7 85 K-350 18963 62.2 7.388 1 9482
2 19-T-13 14 1800.4 85 K-350 18930 62.2 5.229 1 9465
3 19-T-13 19 2443.7 85 K-350 18908 62.3 2.821 1 9454
Note cable length includes 0 mm extra for jacking.
DESIGN OF END BLOCK
Refer Clause 17.2 of IRC:18-2000
0.35
1
0.40
Bearing Stress
As the anchorages are set out as per the manufacturer's specifications for embedded anchorages, bearing stress
checks are not carried out. Refer Note ii under clause 7.3 of IRC:18-2000.
Design temperatrure differences
Idealised section
2.650 2.650
0.332 0.325
1.018 0.97
0.300 0.600
0.390 0.44
0.600 0.6
0.25
h1 0.15 h1
4'C 0.7'C
h2 0.25 h2
0.2
h
0.2
h3
h3 0.15
0.8'C h4
0.25
2.1'C 6.6'C
h1=0.3h (Max 0.15m) h1=h4=0.2h<=0.25m
h2=0.3h>=0.1m<=0.25m h2=h3=0.25h <=0.20m
h3=0.3h <=0.15m h1 0.25
h1 0.15 h2 0.2
h2 0.25 h3 0.2
h3 0.15 h4 0.25
CALCULATION OF THERMAL STRESSES AT MID SECTION
TEMPERATURE RISE CASE
ε o-yθ
θ -α
αt Fci=Ec(ε(εo-
(ε Comp /
Point Y from top y*theta t alfa*t yθ
θ -α
αt) Ten
(m) 'C MPA
END SECTION
Temperature Rise
Temperature Fall
ε o-yθ
θ -α
αt Fci=Ec(ε(εo-
(ε Comp /
Point Y from top y*theta t alfa*t yθ
θ -α
αt) Ten
(m) 'C MPA
G1 G2 G3 G4 Diaphragm
702 355 355 701
2750
1500
Max Design Shear is 702 kN (Note: this is at the jack face or the CL of the girder. Actual shear
will be little less)
Check For Moment Of Resistant
Clear Cover 50 mm
Bar Dia 32 mm
deff provided = 1500 - 50 - 96 = 1354.0
Steel Required = M
σ st x j x d 0.2D = 300
= 1031963075.27 -Ast Ast1 (0.5(L/D-.5)= 3 bars
200 x 0.533 x 1354.0
2
= 7145.24 mm Mid ht 0.3D = 450
Ast2 = 6 bars
Using 32 mm dia bar ∴ No of Bars = 9
+Ast 0.25D-0.05L = 288 mm
Ast = 9 bars
Clear Cover 50 mm
Bar Dia 32 mm
deff provided = 1500 - 50 - 96 = 1354.0
Steel Required = M
σ st x j x d 0.2D = 300
= 760835523.24 -Ast Ast1 (0.5(L/D-.5)= 4 bars
200 x 0.667 x 1354.0
2
= 4214.38 mm Mid ht 0.3D = 450
Ast2 = 2 bars
Using 32 mm dia bar ∴ No of Bars = 6
+Ast 0.25D-0.05L = 238 mm
(Note: MOST standard drawings have same reinf at Ast = 6 bars
top and bottom)
Side face reinft
Side face reinft reqd as per IS 456:2000 is 0.002 X 1500 x 350
2 2
= 1050 mm 1608.5 mm
Provide 10 dia 11 Nos. on each face
All these loads are less than or equal to the loads experienced during the jacking operations.