DAILY REPORT OPERATION PLTM LUBUK GADANG 2 x 4 MW

MONTH : NOVEMBER 2019


Record From 10:00 – 10:00 Hours
20 Kv TRANSMISSION
DATE WEATHER WATER WAY POWER (MW) TURBINE REMARK

6-7 Morning : Sunny Max : 5.6 MW 1. Unit #1 and Unit #2 Trip at 4.9 MW, 1. Unit #1 Start Operating unit
Mid Day : Sunny Min : 2.4 MW Due to Ground Fault Indication at Isolated. can not be
Afternoon : Sunny Malako Feeder. (07:23-10:00) 157 maximazed,
KWH Production : 109472 kwh = 57.01 %
Evening : Sunny Unit #1 (03:59-04:19) 20 Minutes. Minutes. because of water
Output Average : 109472/24 = 4561 KW = 4.5
Mid Nigh : Sunny Unit #2 (03:59-04:20) 21 Minutes. supply is not
MW
enough to operate
2. Unit #1 and Unit #2 Trip at 4.3 MW, at maximum load.
Due to Over Current Indication at
Ps = 566 Kwh Malako Feeder.
Unit #1 (04:25-04:37) 12 Minutes.
Unit #2 (04:25-04:32) 7 Minutes.
Total Unit #1 and Unit #2 Stop Operation:
Total Unit #1 Not Operation : 70 Minutes
3. Unit #1 and Unit #2 Trip at 5.1 MW,
Due to Ground Fault Indication at
Total Unit #2 Not Operation : 223 Minutes
Malako Feeder, because the tree hit
Total Not Operation : 293/2 = 146.5 Minutes
on 20 KV Line.
Unit #1 (05:44-06:03) 19 Minutes.
Unit #2 (05:44-06:04) 20 Minutes.
4. Unit #1 and Unit #2 Trip at 4.7 MW,
Due to Ground Fault Indication at
Malako Feeder, because a monkey
hit on 20 KV Line.
Unit #1 (06:13-06:27) 14 Minutes.
Unit #2 (06:13-06:31) 18 Minutes.
5. Unit #1 and Unit #2 Trip at 3.6 MW,
Disconecting from Incoming Express
In Balun Substation, Start Isolated.
Unit #1 (07:23-07:28) 5 Minutes.
Unit #2 (07:23-10:00) 157 Minutes.

Acknowladge, Lubuk Gadang, 07 November 2019


Plant Manager Report by Group : C

Akhriat Ramli Randyko Setiawan