MAHARASHTRA STATE ELETRICITY TRANSMISSION CO. LTD.

From: Additional Executive Engineer To:


EHV Testing Unit 2, Testing/Telecom Division The Executive Engineer,
Aurangabad. Testing / Telecom Division,
MSETCL Administrative Building, Ground Floor, MSETCL,
Wing 1, 132kV Harsool Substation Campus, Aurangabad.
Aurangabad-431001
Contact No : 8554995040
E-mail Id : adee22520@mahatransco.in

Mill Corner,

Ref.No.EHV TU–II/A’Bad/132kV Pishor/007 Date: 18.01.2020


(Submitted by eMail)

Sub: Analysis report of Occurrence Dt. 15/01/2020 at 132kV Pishor S/S.

Short description of fault:


On Dt. 15.01.2020 at 19:52 hrs, 132kV Pishor- Padegaon line tripped simultaneously with fault on
132kV Pishor-Sawangi line. The details are as below:

Relay & Window Indications:


Sr EHV Sub Stn / Circuit Window Indication Relay Indication
No.
1. 220kV Padegaon S/s
132kV Pishor line 1. Dist protection optd. Dist. Relay: Micom P442
2. AR L/O 1. Gen Trip
2. R Phase
3. Zone-2
4. AR L/O
5. If=1.231 kA
6. 83.74 kM
2. 220kV Sawangi S/s
132kV Pishor line 1. Dist protection optd. Dist. Relay : Micom P441
2. AR L/O 1. Gen Trip
2. R Phase
3. Zone 2
4. If=1.85 kA
5. Distance-53.6 kM
3. 132kV Pishor S/s
A. 132kV Padegaon line 1. Dist protection optd. Dist. Relay : ABB REL 670
2. Dist scheme VT 1.Gen Trip
supply fail 2.R Phase
3.Zone 4
4.VT Fuse Fail
B. 132kV Sawangi line Nil Back-up protn. : R-ph pick up

Load Affected: 17 MW
MAHARASHTRA STATE ELETRICITY TRANSMISSION CO. LTD.

Single line diagram of the network:

132kV Pishor Bus

Z4

Sawangi ckt
Padegaon Ckt
Z2

132kV Sawangi Bus Z2

132kV Padegaon Bus

Tripping Analysis & remedial majors carried out:

The 132 kv padegaon pishor line tripped in Z2 at 132 kv padegaon end and Z4 at 132kv pishor end.
Also 132 kv pishor sawangi line tripped from sawangi end only in Z2 .At pishor end circuit breaker not
tripped for 132 kv Sawangi bay due to non availability of distance relay. The backup relay setting of said bay
was reduced & made sensitive but as it is of electromagnetic type the setting i.e. ROT (200 mSec) is kept for
remote end fault. However, The same relay not operated with time due to relay inertia causing fault cleared
from remote end in Zone-II from 220 kV Sawangi & 220 kV Padegaon end.
The distance relay for 132 kV Pishor-Sawangi line is replaced on 16.01.2020.

Restoration activities carried out by the respective O&M Staff:

1. 132 kV Padegaon line charged at 20:25 Hrs DT:15.01.2020


2. 132 kV Sawangi line charged at 21:37 Hrs DT:15.01.2020

Suggestion to O&M authorities to avoid such recurrence:

It is suggested to arrange for regular line patrolling to avoid such recurrence

Add. Ex. Engineer


EHV Testing Unit – II, A’Bad.

Copy to:
1. The Dy. Ex. Engineer, 132kV Pishor S/S.