Mill Corner,
Load Affected: 17 MW
MAHARASHTRA STATE ELETRICITY TRANSMISSION CO. LTD.
Z4
Sawangi ckt
Padegaon Ckt
Z2
The 132 kv padegaon pishor line tripped in Z2 at 132 kv padegaon end and Z4 at 132kv pishor end.
Also 132 kv pishor sawangi line tripped from sawangi end only in Z2 .At pishor end circuit breaker not
tripped for 132 kv Sawangi bay due to non availability of distance relay. The backup relay setting of said bay
was reduced & made sensitive but as it is of electromagnetic type the setting i.e. ROT (200 mSec) is kept for
remote end fault. However, The same relay not operated with time due to relay inertia causing fault cleared
from remote end in Zone-II from 220 kV Sawangi & 220 kV Padegaon end.
The distance relay for 132 kV Pishor-Sawangi line is replaced on 16.01.2020.
Copy to:
1. The Dy. Ex. Engineer, 132kV Pishor S/S.