You are on page 1of 1

ELE

A B C D E F G
17.60
GENERAL NOTE
4.90 1.20 2.70 2.70 1.20 4.90

W/08 W/08

BAL. BAL.

SD/02 SD/02

1 BEDROOM
RJ45 RJ45
BEDROOM 1

BEDROOMRJ45 RJ45 BEDROOM


RJ45 RJ45

3.65

3.65
RJ45 RJ45

D/03
TOIL. SH. SH. TOIL.D/03
2 D/02 D/02
2
D/03 D/03
SH.
TOIL. TOIL. SH.

2.45

2.45
W/03 W/03
D/02 PANT. PANT. D/02
D/03 D/03

3 3

W/08 BEDROOM BEDROOM W/08


5.00

5.00
RJ45 RJ45

D/02 D/02
RJ45 RJ45
21.55

cut out

cut out

21.55
ELE ELE
H 4 4 F

W/03
TOIL. D/03 DRESS. JUNCTION BOX
(30x30x15cm)
JUNCTION BOX DRESS. D/03 TOIL. W/03
(30x30x15cm)
SH.

SH.
2.40

2.40
A/C A/C

UP UP SH.
SH.

5 5
TOIL.D/03 DRESS. STAIRCASE - 1 STAIRCASE - 1 DRESS. D/03 TOIL.
2.90

2.90
W/03 W/03

6 D/02 SITTING SITTING D/02 6 REVISION :


07
RJ45 RJ45 06
05
04
M. BEDROOMRJ45 RJ45 M. BEDROOM 03
5.15

5.15
SD/01 SD/01
02

RJ45 RJ45
01

BALCONY BALCONY NO. DATE REVISED APPROVED

PROJECT

7 7 PROPOSED 3 VILLAS (G + 1)
W/21 W/21

CLIENT

KHALIFA SAEED MOHAMMED


FIRST FLOOR PLAN AHMAD SULAIMAN
1/100
TITLE
4.90 1.20 2.70 2.70 1.20 4.90
17.60 FIRST FLOOR PLAN VILLA (1 & 2)
TELEPHONE LAYOUT
A B C D E F G

ELE
E

RJ-45 ROAD LEVLEL

ENG. ADNAN SAFFARINI


12U(60X60X15)cm DESIGN,SUPERVISON, & CONSULT

1x 50mm Dia PIPE

1x 50mm Dia PIPE


12U NOTES:

60
WITH MICRO ODF 1- ALL 12U WILL BE IN DRY AREA IF NOT WE WILL PROVIDE
HEAD OFFICE , POST BOX - 4000 DUBAI : 04-2222002
ABUDHABI:02-626050,SHJ:06-5733100,ALAIN:03-668970
JUNCTION BOX DOUBLE WALL.
30X30X15 CM 2- OPTICAL SPLITTER COMPACT SIZE, RACK MOUNTABLE 19".
3- MODULAR OPTICAL SPLITTER, 2X32. SIGN
M.H 60X60X80cm
ARCHITECT AHMED SAFFARINI
4- PATCH PANEL 24 PORTS WITH SC/APC ADAPTERS. STRUCTURE ENG. SIGN

NOTES: 5- PATCH PANEL FRONT PLATE COMPATIBLE FOR SC/APC ADAPTERS.


ELECTRICAL ENG. MAHDI SIGN
6- ALL 12U WITH MICRO ODF
1- ALL 12U WILL BE IN DRY AREA IF NOT MECH. ENG. SIGN
7- ALL TERMINATION OF FIBER OPTIC CABLES WILL BE UNDER
WE WILL PROVIDE DOUBLE WALL. BUILDING CONTRACTOR SCOPE. CAD BY ALHAMAM JARRAD SIGN
2- PATCH PANEL 24 PORTS WITH SC/APC ADAPTERS. CHECKED BY : ENG . AMJAD FAIQ DATE
3- ALL 12U WITH MICRO ODF
4- ALL TERMINATION OF FIBER OPTIC CABLES WILL LEAD-IN-DUCT FORMATION
BE UNDER BUILDING CONTRACTOR SCOPE. DETAIL "T" SHEET U.A.E. CITY LOCATION PLOT NO.
AL MANARA
A2 DUBAI DUBAI 3631110

SCALE : REF NO : SHEET NO:

1/100 AR TEL-02
P47399

You might also like