You are on page 1of 2

PT.

Merak Energi Indonesia 2x60MW CFPP Project


Document Review Comment Sheet Owner’s Transmittal No. : MEI-11-T-2637-DECH-100200-BS
Document No. & Revised Returned Owner’s reply
No Owner’s Comments Contractor’s Response
Name Status Status

0-ME110-ER102- Rev.1 RC
00001
Boiler Mass & Heat
Balance Diagram,
Design Coal, 100%
Boiler Load (Rev.0)

1 Tag No. Of ID, PA, SA Fans : POSCOEN revised it.


Refer to MoM-QC-TY-001 (Tong
Yang Shop Inspection August
02, 2011),
Posco will apply Tag No. base
on GA Drawing of these fans &
revise Tag. No. of PFD & other
related documents

You might also like