Table 2: Total Flow Rate at Side Drain (Left)

CHAINAGE AREA, A (m2) FLOWRATE, Q (m3/s)


Road Area Road Flowrate
CH 400 - 425

4.25m C .i . A 1
Q 1=
360
0.95 X 190 X 0.011
25m Q 1=
360
25 X 4.25
A 1= = 0.006 m3/s
10 000
= 0.011 ha2
Slope Area Slope Flowrate

C . i. A 2
Q 2=
9.372 m 360
0.5 X 190 X 0.023
25 m Q 2=
360
25 X 9.372
A 2= = 0.006 m3/s
10 000
= 0.023 ha2
Total Flowrate

QTotal = Q1 + Q2
= 0.006 + 0.006
= 0.012 m3/s

Road Area Road Flowrate


CH 425 - 450

4.25m C .i . A 1
Q 1=
360
0.95 X 190 X 0.011
25m Q 1=
360
25 X 4.25
A 1= = 0.006 m3/s
10 000
= 0.011 ha2

Slope Area
Slope Flowrate
12.193m
C . i. A 2
Q 2=
25 m
360
25 X 12.193 0.5 X 190 X 0.030
A 2= Q 2=
10 000 360
= 0.030 ha2 = 0.008 m3/s

Total Flowrate

QTotal = Q1 + Q2
= 0.006 + 0.008
= 0.014 m3/s

Road Area Road Flowrate


CH 450 - 475

4.25m C .i . A 1
Q 1=
360
0.95 X 190 X 0.011
25m Q 1=
360
25 X 4.25
A 1= = 0.006 m3/s
10 000
= 0.011 ha2
Slope Area Slope Flowrate

C . i. A 2
Q 2=
360
12.218 m
0.5 X 190 X 0.031
25 m Q 2=
360
25 X 12.218 = 0.008 m3/s
A 2=
10 000
= 0.031 ha2 Total Flowrate

QTotal = Q1 + Q2
= 0.006 + 0.008
= 0.014 m3/s

Road Area Road Flowrate


CH 475 - 500

4.25m C .i . A 1
Q 1=
360
25m 0.95 X 200 X 0.011
Q 1=
25 X 4.25 360
A 1=
10 000 = 0.006 m3/s
= 0.011 ha2
Slope Area Slope Flowrate

C . i. A 2
Q 2=
8.199 m 360
0.5 X 200 X 0.020
25 m Q 2=
25 X 8.199 360
A 2=
10 000 = 0.006 m3/s
= 0.020 ha2
Total Flowrate

QTotal = Q1 + Q2
= 0.006 + 0.006
= 0.012 m3/s

Table 3: Total Flow Rate at Bench Drain (Left)

CHAINAGE AREA, A (m2) FLOWRATE, Q (m3/s)


Slope Area Slope Flowrate
CH 400-425
7.065m C .i. A
Q=
360

25m 0.50 X 190 X 0.018


Q=
360
= 0.005 m3/s
25 X 7.065
A=
10 000
= 0.018 ha2
Slope Area Slope Flowrate
CH 425- 450
5.694m C .i. A
Q=
360

25m 0.50 X 210 X 0.014


Q=
360
25 X 5.694 = 0.004 m3/s
A=
10 000
= 0.014 ha2
Slope Area Slope Flowrate
CH 450-475
4.158m C .i. A
Q=
360

25m 0.50 X 220 X 0.010


Q=
360
= 0.003 m3/s
25 X 4.158
A=
10 000
= 0.010 ha2

RIGHT ROADSIDE DRAIN

CHAINAGE AREA, A (m2) FLOWRATE, Q (m3/s)


Road Area Road Flowrate
CH 400 - 425

4.25m C .i . A 1
Q 1=
360

25m
25 X 4.25 0.95 X 200 X 0.011
A 1= Q 1=
10 000 360
= 0.011 ha2 = 0.006 m3/s
Slope Area
Slope Flowrate
7.364 m
C . i. A 2
Q 2=
25 m 360
25 X 7.364 0.5 X 200 X 0.018
A 2= Q 2=
10 000 360
= 0.018 ha2 = 0.010 m3/s

Total Flowrate

QTotal = Q1 + Q2
= 0.006 + 0.010
= 0.016 m3/s

Road Area Road Flowrate


CH425-450

4.25m C .i . A 1
Q 1=
360
0.95 X 200 X 0.011
25m Q 1=
360
25 X 4.25
A 1= = 0.006 m3/s
10 000
= 0.011 ha2

Slope Area
Slope Flowrate

7.460 m C . i. A 2
Q 2=
360
25 m
0.5 X 200 X 0.019
25 X 7.460 Q 2=
A 2= 360
10 000
= 0.005 m3/s
= 0.019 ha2
Total Flowrate

QTotal = Q1 + Q2
= 0.006 + 0.005
= 0.011 m3/s

CH 450- 475 Road Area Road Flowrate

4.25m C .i . A 1
Q 1=
360
0.95 X 220 X 0.011
25m Q 1=
360
25 X 4.25
A 1= = 0.006 m3/s
10 000
= 0.011 ha2
Slope Area Slope Flowrate

C . i. A 2
Q 2=
9.477 m 360
0.5 X 220 X 0.024
25 m Q 2=
360
25 X 9.477
A 2= = 0.007 m3/s
10 000
= 0.024 ha2
Total Flowrate

QTotal = Q1 + Q2
= 0.006 + 0.007
= 0.013 m3/s

Road Area Road Flowrate


CH475-500

4.25m C .i . A 1
Q 1=
360
0.95 X 190 X 0.011
25m Q 1=
360
25 X 4.25
A 1= = 0.006 m3/s
10 000
= 0.011 ha2
Slope Area Slope Flowrate

9.883 m
C . i. A 2
Q 2=
25 m 360
25 X 9.883 0.5 X 190 X 0.018
A 2= Q 2=
10 000 360
= 0.025 ha2 = 0.007 m3/s

Total Flowrate

QTotal = Q1 + Q2
= 0.006 + 0.007
= 0.013 m3/s