Rehabilitation of GGPS Yaqbi uper kurram District
BOQ: Main Building Work (Rehab work)
Length Width Depth
S# Description Ref: MRS-19 No Quantity Unit Unit Rate Total Cost Remarks
(ft) (ft) (ft)
Make & fix deodar planking in eave boards
1 etc planed on 12-30-c
both sides complete : 1/2" thick
Grant Total -
Rehabilitation of GGPS Yaqbi uper kurram District
S# Description Ref: MRS-19 Length Width Depth/ Height Estimated Quantity Unit Unit Rate Estimated Cost (PKR) Remarks
Excavation in foundation
1 of building, bridges etc 03-25-d 4.00 3.00 0.75 9.00 Cft 0.00
complete : in
Plain Cement Concrete
shingle/gravel
including placing,
2 compacting, finishing & 06-05-i 4.00 3.00 0.75 9.00 Cft 0.00
curing (Ratio 1:4:8)
6 Total 0.00
Rehabilitation of GGPS Yaqbi uper kurram District
Bill of Quantities of land devlopment
S# Description Ref: MRS- Length (ft) Width (ft) Depth (ft) No Quantity
19
infront of
Sft rooms
block
Sft 0
infront of
Cft rooms
block
Cft 0
around pcc
Tuff tile
cft 0
infront of
sft rooms
block
sft 0
0
Rehabilitation of GGPS Yaqbi uper ku
BOQ: New Latrine b
Ref: MRS- Length
S# Description Width (ft)
19 (ft)
1 Excavation for foundation of building in ordinary soil 03-25-b
Wash room (Long wall) 13.5 2
Wash room (Short wall) 3.75 2
Total Excavation
Spraying anti-termite liquid mixed with water in ration of
2 26-15
1:40
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
Providing and Fixing angle iron railing with MS
Pipe 2" dia at top and at Mid-height, using
25-41
2.5"x2.5"x3/8" angle iron post 4.5' long, 5" to 6"
14 apart, complete :inculding PCC
Ramp 15
11-23-a-
Distempering new surface:three coat
15 03
Long Wall (intrernal ) 5
Short Wall (internal) 5
Roof 5 5
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
16 Cement Pointing Struck joints, on wall upto 20' height: Rati 11-18-b
Long Wall 12.25 0
Short Wall 6.5 0
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
Total Estimated Cost (PKR)
ilitation of GGPS Yaqbi uper kurram District
BOQ: New Latrine block
Estimated Estimated Cost
Depth (ft) No Unit Unit Rate
Quantity (PKR)
2 2 108 Cft
2 3 45 Cft
153 0.00
220 Sft 0.00
2 2 54 cft
2 3 22.5 cft
2 2 100 cft
176.5 0.00
0.5 2 27 cft
0.5 3 11.25 cft
0.5 1 44 cft
82.25 0.00
hing and curing
0.34 1 27.0725 cft
27.0725 Cft 0.00
9 2 165.375 cft
9 3 101.25 cft
0.5 2 12 cft
278.63
7 2 35 Sft
1.5 2 5 Sft
40 0.00
5 2 50 sft
5 4 100 sft
5 4 100 sft
30 sft
255 Sft 0.00
9 4 180 Sft
9 4 180 Sft
50 Sft
410 Sft
7 2 35 Sft
5 Sft
40 Sft
371 Sft 0.00
9 2 220.5 Sft
9 2 117 Sft
Total 337.5 Sft
Sft
7 2 35 Sft
1.5 2 4.5 Sft
39.5 Sft
298 Sft 0.00
15
15 Rft 0.00
3 4 60 Sft
3 4 60 Sft
2 50 Sft
Total 170 Sft
Sft
7 2 35 Sft
1.5 2 5 Sft
40 Sft
131 Sft 0.00
9 2 221 Sft
9 2 117 Sft
Total 338 Sft
7 1 18 Sft
1.5 1 2 Sft
20 Sft
317.75 Sft 0.00
ed Cost (PKR) -
Remarks
*
Rehabilitation of GGPS Yaqbi uper kurram District
Bill of Quantities of sanitation fixtures
SN Description Ref: MRS Code 19 Quantity Unit
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
Rehabilitation of GGPS Yaqbi uper kurram District
Bill of Quantities of Washing Pad
Sub Head mRS 2019 Nomenclature Description Reference L B D/H
No. Location Ft Ft Ft
Excavation in
foundation of
building, bridges etc
complete : in Excavation
1 03-25-d shingle/gravel for 7 5.67 0.83
Foundation
Plain Cement
Concrete including PCC (1:3:6)
4 06-05-h placing, compacting, 7 5 0.33
finishing & Curing 4" thick
(Ratio 1:3:6)
Marble Tile
(Trevera) Front 7 8.25 Perimeter
1 32.94 Cft
1 19.85 Cft -
1 11.55 Cft -
1 11.55 Cft -
1 18.96 Cft -
1 1.75 Cft -
1 10.50 Cft -
1 2.63 Cft -
1 1.00 LS -
1 57.75 Sft
2 7.08 Sft
2 3.75 Sft
2 0.75 Sft
69.33 Sft
6.93 Sft
76.26 Sft -
69.33 Sft -
1 19.81 Sft -
1 15.00 Rft -
-
Rehabilitation of GGPS Yaqbi uper kurram District
Sign Board and Dustbin
S# Description Ref: MRS Length Width Depth No Quanti Un Unit Rate Claimed Remar
- 19 (ft) (ft) (ft) ty it ks
1 Excavation for foundation of 03-23-b
building in ordinary soil
Foundation 1 1 1 4 4 Cft
Total Excavation 4 Cft 0
PCC (1:2:4) including
2 placing,compaction,finishing and 06-05-f 0
curing
Foundation 1 1 0.5 4 2 cft 0
Total PCC 2 cft 0
Dust bin, 18 SWG GI Sheet 1.5' Dia
3 Custom made Drum with 2'' Dia 18 NSI 1 2 No 0
SWG MS Pipe supports, Complete in
all respect, as shown in drawing
Total 2.00 No 0
Supply and fixing Sign Board 4'x3'
4 size with 18 gauge iron sheet, NSI 1.00 Nos 0
painting etc, Completed in all
respect as shown in Drawing
Total 0.00
Rehabilitation of GGPS Yaqbi uper kurram District
room
Room Verandah
Proposed
of Flag Proposed
posr of toiled
block
Main Gate