Rehabilitation of GGPS Sangina uper kurram District
BOQ: Main Building Work (Rehab work)
Length Width Depth
S# Description Ref: MRS-19 No Quantity Unit Unit Rate Total Cost Remarks
(ft) (ft) (ft)
PCC (1:3:6) including
1 06-05-h
placing,compaction,finishing and curing
Path ways 190 4 0.33 1 250.8 cft 0.0 room to toilte block
Dismantling of roof treatment 04-22-b
class rooms block 25 16 2 800 sft
verandah 26 9 1 234 sft
Total 1034.0 sft 0.0
2 ROOF TREATMENT
Second class tile roofing consisting of 4"
earth and 09--02
1" mud plaster with gobri leeping etc
Grant Total -
Rehabilitation of GGPS Sangina uper kurram District
infront of
Sft rooms
block
Sft 0
infront of
Cft rooms
block
Cft 0
around pcc
Tuff tile
cft 0
infront of
sft rooms
block
sft 0
0
Rehabilitation of GGPS Sangina uper kurram District
Bill of Quantities of Flag Post
S# Description Ref: MRS 19 Length Width Depth/ Height Estimated Quantity Unit Unit Rate Estimated Cost (PKR) Remarks
Excavation in foundation
1 of building, bridges etc 03-25-d 4.00 3.00 0.75 9.00 Cft 0.00
complete : in
Plain Cement Concrete
shingle/gravel
including placing,
2 compacting, finishing & 06-05-i 4.00 3.00 0.75 9.00 Cft 0.00
curing (Ratio 1:4:8)
Total 0.00
GGPS Sameer lower kurram Agency
Bill of Quantities of Washing Pad
Sub Head mRS 2019 Nomenclature Description Reference L B D/H
No. Location Ft Ft Ft
Excavation in
foundation of
building, bridges etc
complete : in Excavation
1 03-25-d shingle/gravel for 7 5.67 0.83
Foundation
Plain Cement
Concrete including PCC (1:3:6)
4 06-05-h placing, compacting, 7 5 0.33
finishing & Curing 4" thick
(Ratio 1:3:6)
Marble Tile
(Trevera) Front 7 8.25 Perimeter
1 32.94 Cft -
1 19.85 Cft -
1 11.55 Cft -
1 11.55 Cft -
1 18.96 Cft -
1 1.75 Cft -
1 10.50 Cft -
1 2.63 Cft -
1 1.00 LS -
1 57.75 Sft -
2 7.08 Sft -
2 3.75 Sft -
2 0.75 Sft -
69.33 Sft -
6.93 Sft -
76.26 Sft -
69.33 Sft -
1 19.81 Sft -
1 15.00 Rft -
-
GGPS Sameer
BOQ: New Latrine b
Ref: MRS Length
S# Description Width (ft)
19 (ft)
1 Cement plastring 1:4 upto 20' height 1/2" thick 11-09-b
Both wash room Long Wall and short wall Lum sam 200
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
3 Cement Pointing Struck joints, on wall upto 20' height: Rati 11-18-b
Long Wall 12.25 0
Short Wall 6.5 0
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
11-21-b-
Distempering Old surface : Two coats 02
4
Long Wall (intrernal ) 5
Short Wall (internal) 5
Roof 5 5
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
Total Estimated Cost (PKR)
GGPS Sameer
BOQ: New Latrine block
Estimated Estimated Cost
Depth (ft) No Unit Unit Rate
Quantity (PKR)
200 Sft
Sft
Sft
200 Sft 0
9 2 220.5 Sft
9 2 117 Sft
Total 338 Sft
Sft
7 2 35 Sft
1.5 2 4.5 Sft
39.5 Sft
298 Sft 0
9 2 221 Sft
9 2 117 Sft
Total 338 Sft
7 2 35 Sft
1.5 2 5 Sft
40 Sft
298 Sft 0
3 4 60 Sft
3 4 60 Sft
2 50 Sft
Total 170 Sft
Sft
7 2 35 Sft
1.5 2 5 Sft
40 Sft
131 Sft 0
ed Cost (PKR) 0
Remarks
Around plaster
*
GGPS Sameer
Bill of Quantities of sanitation fixtures
S# Description Ref: MRS 19 Estimated Quantity Unit
Providing and Fixing CP soap
1 dish. 14-13 2 Each
Providing and Fixing glazed
earthen ware low down
2 flushing cistern 3 gallons 14-10-a 2 Each
capacity : White
Total
Supply and fixing of 1.0 HP Monoblock water pump 1.25"x1" single phase upto 88 ft head (Type DE-S2) i/c all acce
on fixtures
Unit Rate Estimated Cost (PKR) Remarks
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Room 2
Room1 Verandah
Proposed
flag post
Main Gate
kurram District
Toilet block
Washing
Pad