NAME OF THE CONTRACTOR: M/s Ram Kripal Singh Construction Private Ltd.
NAME OF WORK: Civil & Structural works(for Part-C) for upgrading pump stations/terminals of Naharkatiya-Barauni crude oil pipe line(NBPS) project of OIL at Barauni
CLIENT: M/s oil India Ltd.
CONSULTANT: M/s Engineers India Ltd.
WORK ORDER NO: pl/cont-03/3-23/4811 DATED 04/01/2014.
FINAL BILL, PS10(BARAUNI)
Date: Up to 15.07.2016
SOR payable % Quantity Amount in Rs.
BOQ amount in
Sl. No. Item Item No. Description Unit BOQ QTY. Rate in Rs. as per Remarks
Rs. Previous This Bill Upto Date Previous This Bill Upto Date
Sl. No. Contract
6 Q999.99.99V03 Air conditioning system for control LOT 1.000 12874848.00 60% 7724908.80 1.00 0.000 1.00 7724908.80 0.00 7724908.80
room building @ PS-10 Barauni………..
1.000 12874848.00 20% 2574969.60 1.00 0.000 1.00 2574969.60 0.00 2574969.60
1.000 12874848.00 10% 1287484.80 1.00 0.000 1.00 1287484.80 0.00 1287484.80
1.000 12874848.00 10% 1287484.80 1.00 0.000 1.00 1287484.80 0.00 1287484.80
1.000 12874848.00 20% 2574969.60 1.00 0.000 1.00 2574969.60 0.00 2574969.60
1.000 12874848.00 10% 1287484.80 1.00 0.000 1.00 1287484.80 0.00 1287484.80
1.000 12874848.00 10% 1287484.80 1.00 0.000 1.00 1287484.80 0.00 1287484.80
3 3 C002.02.00 Supplying,fixing and tensioning in M 7200.000 28.15 100% 202680.00 5053.98 0.000 5053.98 142269.54 0.00 142269.54
position……..barbed wire…..
5 8 C005.08.01V02 Supplying,fixing …….concertina wire…. M 950.000 750.72 100% 713184.00 505.40 0.000 505.40 379412.39 0.00 379412.39
12 24 C008.02.03 P/L. RCC… OF M25 CONCRETE CUM. 20.00 10097.18 100% 201943.60 14.35 0.000 14.35 144894.53 0.00 144894.53
13 26 C008.05.03 PROVIDING 20 WIDE EXPENTION JOINT M 20.00 1116.70 100% 22334.00 316.53 0.000 316.53 353463.47 0.00 353463.47
14 30 C008.12.03 Sealing Joint around Pedestal and M 20.00 1116.70 100% 22334.00 185.96 0.000 185.96 207666.00 0.00 207666.00
column
16 34 C009.15.01 Hot - SQM. 5000.00 563.04 100% 2815200.00 2939.05 0.000 2939.05 1654799.90 0.00 1654799.90
17 37 C010.01.01V02 Supplying & Fixing in position of 500mm M 100.00 2815.20 100% 281520.00 32.50 0.000 32.50 91494.00 0.00 91494.00
Dia pipe class NP3……….
19 40 C010.05.01V01 Supplying and laying in position PVC. M 1200.00 638.11 100% 765732.00 2943.60 0.000 2943.60 1878340.60 0.00 1878340.60
Pipes …. Dia (outer 160mm….
22 49 C012.03.01V02 Nom. Dia 50 mm , Pipe class J2A , - M 50.00 1069.78 100% 53489.00 74.20 0.000 74.20 79377.68 0.00 79377.68
23 58 C025.15.02V03 Providing and laying Brick masonry with cum. 350.000 4598.16 100% 1609356.00 373.54 0.000 373.54 1717578.29 0.00 1717578.29
locally available brick of specified class..
27 69 C025.56.00 Providing 16 mm thick average cement SQM 2500.00 262.75 100% 656875.00 1392.02 0.000 1392.02 365754.04 0.00 365754.04
plaster in cement mortar 1:6 ........
29 92 C034.03.03 100mm dia (All materials including M 95.00 3303.17 100% 313801.15 153.22 0.000 153.22 506095.19 0.00 506095.19
cement supplied by contractor) -
30 97 C034.14.01.V03 Construction of Soak pit ( 20 Users)..... EACH 2.00 45981.60 100% 91963.20 2.00 0.000 2.00 91963.20 0.00 91963.20
32 104 C034.19.01V13 Dia 50 mm , Brick Class 5 , - EACH 12.00 2796.43 100% 33557.16 8.00 0.000 8.00 22371.44 0.00 22371.44
35 113 C034.22.02.02V0 Construction of inspection EACH 22.00 28152.00 100% 619344.00 11.00 0.000 11.00 309672.00 0.00 309672.00
1 chamber/manholes....
36 116 C034.23.02.V03 Construction of Septic Tank ( 20 EACH 2.00 46732.32 100% 93464.64 2.00 0.000 2.00 93464.64 0.00 93464.64
Users)....
10% Placement of Order and approval LS 1.00 3772368.00 10% 377236.80 1.00 0.000 1.00 377236.80 0.00 377236.80
of drawing
10% on issunace of release note/ LS 1.00 3772368.00 10% 377236.80 1.00 0.000 1.00 377236.80 0.00 377236.80
Despatch clearence
20% after erection and installation LS 1.00 3772368.00 20% 754473.60 1.00 0.000 1.00 754473.60 0.00 754473.60
10% testig and commisioning LS 1.00 3772368.00 10% 377236.80 1.00 0.000 1.00 377236.80 0.00 377236.80
10% on completion of all works in all LS 1.00 3772368.00 10% 377236.80 1.00 0.000 1.00 377236.80 0.00 377236.80
respects
38 154 C176.01.00V01 Capacity 500 Litres , - EACH 1.00 7375.82 100% 7375.82 1.00 0.000 1.00 7375.82 0.00 7375.82
39 155 C176.01.00V02 Capacity 1000 Litres , EACH 5.00 14742.26 100% 73711.30 2.00 0.000 2.00 29484.52 0.00 29484.52
40 157 C177.03.00 Construction of rain water reaching well EACH 6.00 81640.80 100% 489844.80 2.00 0.000 2.00 163281.60 0.00 163281.60
including earth work
43 184 C999.99.99V09 Dismantling of BARBED WIRE FROM M 2700.00 5.63 100% 15201.00 118.70 0.000 118.70 668.28 0.00 668.28
EXISITING BOUNDARY WALL..
46 6 A002.02.03 Providing and laying Cement Granolithic Sq.m 25.000 431.66 100% 10791.50 49.67 0.000 49.67 21439.47 0.00 21439.47
Flooring…….
47 8 A002.03.01 Providing and laying average 50 mm Sq.m 5600.000 656.88 100% 3678528.00 1686.29 0.000 1686.29 1107688.27 0.00 1107688.27
thick Heavy Duty Flooring…….
49 14 A002.06.04 PVC panel Divider (3mmX20mmsize)..... RM 975.000 46.92 100% 45747.00 621.95 0.000 621.95 29181.89 0.00 29181.89
51 22 A002.10.01 25 mm thick kota stone.... Sq.m 90.000 1445.14 100% 130062.60 187.47 0.000 187.47 270925.45 0.00 270925.45
52 23 A002.10.03 18 mm thick kota stone.... Sq.m 30.000 1445.14 100% 43354.20 43.05 0.000 43.05 62215.81 0.00 62215.81
57 32 A002.17.05 Grainte Stone extra for round RM 150.000 290.90 100% 43635.00 101.30 0.000 101.30 29468.17 0.00 29468.17
nosing...........
63 54 A004.01.03 P/F Pressed steel door frames…….... RM. 80.000 1285.61 100% 102848.80 39.98 0.000 39.98 51398.69 0.00 51398.69
71 76 A005.01.09 Providing 6 mm thick average cement Sqm 5700.000 225.22 100% 1283754.00 4029.29 0.000 4029.29 907476.30 0.00 907476.30
plaster in cement mortar 1:4 ........
74 79 A005.04.00 Providing 20 mm X 10mm grooves in RM 7000.000 56.30 100% 394100.00 1659.70 0.000 1659.70 93441.11 0.00 93441.11
plastering...
75 82 A006.02.01 PL. CEMENT CONCRETE 1:2:4 Cu.m 500.000 6568.80 100% 3284400.00 118.11 0.000 118.11 775840.97 0.00 775840.97
79 90 A007.09.01 Providing and applying textured Sqm 2400.000 422.28 100% 1013472.00 1448.82 0.000 1448.82 611805.81 0.00 611805.81
granular type wall coating..........
82 100 A008.12.08 PL.RAIN WATER PIPE ….160MM DIA RM 510.000 1126.08 100% 574300.80 225.50 0.000 225.50 253931.04 0.00 253931.04
85 103 A008.20.00 Providing and fixing in position Sqm 160.000 1876.80 100% 300288.00 90.00 0.000 90.00 168912.00 0.00 168912.00
Polycarbonate sheets.....
88 109 A009.03.02 Set of 2 urinals.(with 10 litre capacity UNIT 1.000 11730.00 100% 11730.00 1.00 0.000 1.00 11730.00 0.00 11730.00
cistern) -
94 120 A009.18.00 Providing and fixing round edged mirror SQM. 2.000 1351.30 100% 2702.60 1.32 0.000 1.32 1783.72 0.00 1783.72
of 6mm thick float glass with 6mm thick
96 125 A010.01.02 GI Frame Work consisting of Wall Sqm 750.000 1323.14 100% 992355.00 367.65 0.000 367.65 486452.69 0.00 486452.69
channels.....
99 129 A010.12.00 Providing Fixing in position underdeck Sqm 2300.000 1126.08 100% 2589984.00 973.66 0.000 973.66 1096417.93 0.00 1096417.93
insulation........
100 131 A010.15.01 False Flooring Panels with 2 mm Sqm 700.000 6474.96 100% 4532472.00 271.77 0.000 271.77 1759725.78 0.00 1759725.78
thickfire Retardent...
102 135 A011.06.01 Providing and laying Plinth Sqm 1800.000 656.88 100% 1182384.00 529.90 0.000 529.90 348083.34 0.00 348083.34
protection.....
105 144 A999.99.99V01 Providing and fixing wall mounted NO. 4.000 11523.55 100% 46094.20 2.00 0.000 2.00 23047.10 0.00 23047.10
chinaware wash down
107 154 A999.99.99V14 Providing and fixing in position CP Brass NO. 4.000 910.25 100% 3641.00 4.00 0.000 4.00 3641.00 0.00 3641.00
Soap Dish of
108 156 A999.99.99V16 Providing and fixing in position CP Brass NO. 4.000 910.25 100% 3641.00 2.00 0.000 2.00 1820.50 0.00 1820.50
Toilet Paper
110 161 A999.99.99V22 Providing and fixing 2 hours fire rated, SQM. 19.000 62872.80 100% 1194583.20 32.01 0.000 32.01 2012621.20 0.00 2012621.20
fully glazed, double
113 165 A999.99.99V26 Providing and fixing 2 hours fire rated, SQM. 50.000 32750.16 100% 1637508.00 21.76 0.000 21.76 712687.69 0.00 712687.69
glazed partition of
114 166 A999.99.99V29 Providing and fixing in position 1000 RM. 65.000 2233.39 100% 145170.35 118.75 0.000 118.75 265215.06 0.00 265215.06
high decorative
116 171 A999.99.99V38 Ceramic Coloured galzed type tiles....... Sqm 100.000 1313.76 100% 131376.00 205.00 0.000 205.00 269323.76 0.00 269323.76
117 173 A999.99.99V40 Providing and fixing 2 hours fire rated, Sqm 5.000 24116.88 100% 120584.40 5.33 0.000 5.33 128451.33 0.00 128451.33
single shutter steel
133 23 S002.18.15 P/L RCC of M20grade…….in sub- Cu.m 70.000 7976.40 100% 558348.00 120.04 0.000 120.04 957485.97 0.00 957485.97
structure……
135 27 S002.19.17 P/L RCC of M30 grade…….in sup- Cu.m 1690.000 8351.76 100% 14114474.40 907.75 0.000 907.75 7581299.70 0.00 7581299.70
structure ..
136 29 S002.20.02 P/L RCC OF M20 GRADE Flooring)........ CUM. 500.000 8257.92 100% 4128960.00 333.16 0.000 333.16 2751208.63 0.00 2751208.63
138 33 S002.25.01 P/F centering and shuttering in Sq.m. 15965.000 459.82 100% 7341026.30 13626.38 171.483 13797.863 6265683.39 78851.31 6344534.70
foundations,footings………
55% ON RECEIPT AND ACCEPTANCE OF MT 780.000 93840.00 55% 40257360.00 305.621 0.000 305.621 15773711.05 0.00 15773711.05
MATERIAL AT SIDE.
10% on completion of all works in all MT 780.000 93840.00 10% 7319520.00 305.621 0.000 305.621 2867947.46 0.00 2867947.46
respects
supplying TRANSPORTINGSTORING
146 51 S006.16.01 FEBRICATING IN FIXING IN POSITION MT 7.000 112608.00 100% 788256.00 6.410 0.000 6.410 721794.50 0.00 721794.50
MS. METAL…
148 57 S006.19.06 Supplying, fabricating and erecting in MT. 30.000 107916.00 100% 3237480.00 11.11 0.000 11.11 1199165.96 0.00 1199165.96
position at all levels and locations
154 81 S010.01.02 DISMANTLING OF BRICK WORKALL Cu.m 165.000 1698.50 100% 280252.50 123.11 0.000 123.11 209109.24 0.00 209109.24
DEPTH…
155 83 S010.02.01 Dismantling of RCC work for all depths Cu.m 310.000 2627.52 100% 814531.20 34.81 0.000 34.81 91453.46 0.00 91453.46
below plinth level….
Dismantling GI
158 90 S010.07.01 /Asbestos/trans/lucent/sheet,Ridges,Gu Sq.m. 2.000 187.68 100% 375.36 0.00 0.000 0.00 0.00 0.00 0.00
tters etc…………
160 95 S011.06.01 Sand Filling………… Cum 675.00 1051.01 100% 709431.75 319.42 0.000 319.42 335712.56 0.00 335712.56
162 100 S999.99.99V01 Supplying AND FILLING SAND GRAVEL CUM. 110.00 1341.91 100% 147610.10 57.63 0.000 57.63 77330.32 0.00 77330.32
MIX 1:1 BELOW
165 12 E207.01.03 Supplying AND LAYING GI PIPE 65MM M 455.00 534.89 100% 243374.95 32.40 0.000 32.40 17330.44 0.00 17330.44
NB SIZES…
166 13 E207.01.07 Supplying AND LAYING GI PIPE M 825.00 1266.84 100% 1045143.00 249.38 0.000 249.38 315924.56 0.00 315924.56
150MM NB SIZES…
168 18 E304.01.01 Type IND 1 Fixtures. - NOS. 36.00 1407.60 100% 50673.60 100.00 0.000 100.00 140760.00 0.00 140760.00
169 20 E304.01.04 Type IND 4 Fixtures. - NOS. 106.00 2158.32 100% 228781.92 51.00 0.000 51.00 110074.32 0.00 110074.32
170 22 E304.01.13 Type SFD 12 Fixtures. - NOS. 12.00 1501.44 100% 18017.28 6.00 0.000 6.00 9008.64 0.00 9008.64
171 24 E304.01.22 Type RSD 10 Fixtures. - NOS. 28.00 1126.08 100% 31530.24 12.00 0.000 12.00 13512.96 0.00 13512.96
172 28 E304.01.47 Type ST 1 Fixtures. - NOS. 4.00 4504.32 100% 18017.28 6.00 0.000 6.00 27025.92 0.00 27025.92
173 31 E304.02.03 Type CFL 3 Fixtures. - NOS. 10.00 2721.36 100% 27213.60 20.00 0.000 20.00 54427.20 0.00 54427.20
174 32 E304.02.12 Type CFL16 Fixtures. - NOS. 16.00 1689.12 100% 27025.92 23.00 0.000 23.00 38849.76 0.00 38849.76
179 44 E307.01.03 15/5 A, 6 pin flush / surface mounting NOS. 66.00 534.89 100% 35302.74 77.00 0.000 77.00 41186.53 0.00 41186.53
sockets/receptacles
180 47 E307.02.01 5 A, piano type flush/surface mounted NOS. 155.00 168.91 100% 26181.05 181.00 0.000 181.00 30572.71 0.00 30572.71
swtches. -
183 57 E309.02.01 40 A, 4 pole incomer MCB isolator and 6 NOS. 9.00 15014.40 100% 135129.60 2.00 0.000 2.00 30028.80 0.00 30028.80
Nos. outgoing single pole MCBs
185 59 E309.02.03 40 A, 4 pole incomer MCB isolator and NOS. 11.00 21583.20 100% 237415.20 5.00 0.000 5.00 107916.00 0.00 107916.00
18 Nos. outgoing single pole MCBs
187 63 E310.03.02 Circuit wiring with 660 V grade , PVC M 850.00 159.43 100% 135515.50 4410.80 0.000 4410.80 703213.84 0.00 703213.84
insulated copper wires in 3CX2.5sq.m...
188 67 E310.04.04 3 C x 2.5 sq. mm armoured Cu cables. - M. 1110.00 168.91 100% 187490.10 720.60 0.000 720.60 121716.55 0.00 121716.55
191 76 E310.10.01 Supplying of (concealed type ) PVC M 1220.00 93.84 100% 114484.80 7973.55 0.000 7973.55 748238.31 0.00 748238.31
conduit of 25mm dia meter
192 77 E310.10.02 Supplying of (concealed type ) PVC M 2170.00 159.53 100% 346180.10 811.10 0.000 811.10 129394.78 0.00 129394.78
conduit of 40mm dia meter
Supplying,installation,testing and
193 80 E402.01.01 commisioning of GI earth Nos 46.00 12002.14 100% 552098.44 33.00 0.000 33.00 396070.62 0.00 396070.62
electrode...........
198 91 E404.01.01 3/8" dia (10 mm) flexible rope. - M. 180.00 168.91 100% 30403.80 46.00 0.000 46.00 7769.86 0.00 7769.86
199 96 E405.01.01 GI earth plate as per std. 7-51-0103. - NOS. 47.00 1201.15 100% 56454.05 11.00 0.000 11.00 13212.65 0.00 13212.65
201 102 E502.02.02 Flush Mounting Type. - NOS. 31.00 807.02 100% 25017.62 16.00 0.000 16.00 12912.32 0.00 12912.32
202 104 E502.03.01 1 No. twin flat wire. - M. 350.00 56.30 100% 19705.00 667.95 0.000 667.95 37605.59 0.00 37605.59
203 0 EXTRA-9 RSD-7 NOS. 259.00 4793.00 100% 1241387.00 121.00 0.000 121.00 579953.00 0.00 579953.00
204 0 EXTRA-10 SFD-6 NOS. 16.00 7832.88 100% 125326.08 16.00 0.000 16.00 125326.08 0.00 125326.08
Gross Bill amount including service Tax in Rs. 263669150.90 605073.23 266111664.13
Total 572986.01
Copy/Remarks: Item Value 572986.01
Service Tax Category : Service Value 572986.01
Service Tax @ 5.6% 32087.22
Sales Tax 0.000
Invoice Amount 605073.23
Amount Due 605073.23
Total payable Amount 605073
Amount in words: Four Crore Sixty Four Lakh Forty For RKSCPL
Thousand Eighty Seven only.
Name:
Signature:
Date:
OIL INDIA LTD
NBPS Project
PS-10, Barauni
Final Bill:- PS-07, PS-08, PS-09 & PS-10
1. Name of work :-CIVIL & STRUCTURAL WORKS FOR (PART-C) FOR UPGRADING PUMP
STATIONS/TERMINALS OF NAHRKATIA-BARAUNI CRUDE OIL PIPELINE (NBPS) PROJECT
INDEX SHEET
Sl. No. Description Page no. No. Of Sheets
1 Letter 1 1
1 Invoice 2 1
2 Memorandum of payment 3 1