You are on page 1of 21

ABSTRACT OF BARAUNI ( PS-10 )

NAME OF THE CONTRACTOR: M/s Ram Kripal Singh Construction Private Ltd.
NAME OF WORK: Civil & Structural works(for Part-C) for upgrading pump stations/terminals of Naharkatiya-Barauni crude oil pipe line(NBPS) project of OIL at Barauni
CLIENT: M/s oil India Ltd.
CONSULTANT: M/s Engineers India Ltd.
WORK ORDER NO: pl/cont-03/3-23/4811 DATED 04/01/2014.
FINAL BILL, PS10(BARAUNI)
Date: Up to 15.07.2016
SOR payable % Quantity Amount in Rs.
BOQ amount in
Sl. No. Item Item No. Description Unit BOQ QTY. Rate in Rs. as per Remarks
Rs. Previous This Bill Upto Date Previous This Bill Upto Date
Sl. No. Contract

6 Q999.99.99V03 Air conditioning system for control LOT 1.000 12874848.00 60% 7724908.80 1.00 0.000 1.00 7724908.80 0.00 7724908.80
room building @ PS-10 Barauni………..

1.000 12874848.00 20% 2574969.60 1.00 0.000 1.00 2574969.60 0.00 2574969.60

1.000 12874848.00 10% 1287484.80 1.00 0.000 1.00 1287484.80 0.00 1287484.80

1.000 12874848.00 10% 1287484.80 1.00 0.000 1.00 1287484.80 0.00 1287484.80

Air conditioning system for substation


7 Q999.99.99V04 building @ PS-10, barauni ……….. LOT 1.000 12874848.00 60% 7724908.80 1.00 0.000 1.00 7724908.80 0.00 7724908.80

1.000 12874848.00 20% 2574969.60 1.00 0.000 1.00 2574969.60 0.00 2574969.60

1.000 12874848.00 10% 1287484.80 1.00 0.000 1.00 1287484.80 0.00 1287484.80

1.000 12874848.00 10% 1287484.80 1.00 0.000 1.00 1287484.80 0.00 1287484.80

3 3 C002.02.00 Supplying,fixing and tensioning in M 7200.000 28.15 100% 202680.00 5053.98 0.000 5053.98 142269.54 0.00 142269.54
position……..barbed wire…..

Supplying febricatingand fixing in


4 5 C002.05.01 position structure steel y shaped MT 2.700 75072.00 100% 202694.40 1.763 0.000 1.763 132351.94 0.00 132351.94
overhang

5 8 C005.08.01V02 Supplying,fixing …….concertina wire…. M 950.000 750.72 100% 713184.00 505.40 0.000 505.40 379412.39 0.00 379412.39

Cutting down trees having a girth above


6 10 C006.01.00 30cms and upto and including of 60 EACH 15.000 1407.60 100% 21114.00 1.00 0.000 1.00 1407.60 0.00 1407.60
cms……………
Cutting down trees having a girth above
7 11 C006.02.00 60cms and upto and including of 120 EACH 15.000 2721.36 100% 40820.40 4.00 0.000 4.00 10885.44 0.00 10885.44
cms……………

Earth work in filling with borrow earth


8 15 C006.45.00 for all heights and depths for site CUM 55500.000 398.82 100% 22134510.00 37353.78 0.000 37353.78 14897433.34 0.00 14897433.34
grading………..

Supplying and stone aggregate of


9 19 C007.26.00 90mm down to 45 size for WBM. Layer Sq.m. 16300.00 262.75 100% 4282825.00 8817.14 0.000 8817.14 2316702.22 0.00 2316702.22
sub base course …...

Supplying and stone aggregate of


10 20 C007.29.00 63mm down to 45 size for WBM. Layer Sq.m. 10000.00 187.68 100% 1876800.00 5878.09 0.000 5878.09 1103199.93 0.00 1103199.93
base course …...

Supplying and laying WBM layers for


11 21 C007.34.00 road berms/shoulders, of stone Sq.m. 2500.00 215.83 100% 539575.00 311.72 0.000 311.72 67277.45 0.00 67277.45
aggregate of

12 24 C008.02.03 P/L. RCC… OF M25 CONCRETE CUM. 20.00 10097.18 100% 201943.60 14.35 0.000 14.35 144894.53 0.00 144894.53

13 26 C008.05.03 PROVIDING 20 WIDE EXPENTION JOINT M 20.00 1116.70 100% 22334.00 316.53 0.000 316.53 353463.47 0.00 353463.47

14 30 C008.12.03 Sealing Joint around Pedestal and M 20.00 1116.70 100% 22334.00 185.96 0.000 185.96 207666.00 0.00 207666.00
column

Providing and laying 25mm thick


15 32 C009.02.00 bitumen premix carpet including SQM. 5000.00 290.90 100% 1454500.00 2939.05 0.000 2939.05 854968.19 0.00 854968.19
heating bitumen,

16 34 C009.15.01 Hot - SQM. 5000.00 563.04 100% 2815200.00 2939.05 0.000 2939.05 1654799.90 0.00 1654799.90

17 37 C010.01.01V02 Supplying & Fixing in position of 500mm M 100.00 2815.20 100% 281520.00 32.50 0.000 32.50 91494.00 0.00 91494.00
Dia pipe class NP3……….

Supplying & Fixing in position of 350mm


18 38 C010.01.01V03 Dia pipe class NP3………. M 45.00 1970.64 100% 88678.80 12.50 0.000 12.50 24633.00 0.00 24633.00

19 40 C010.05.01V01 Supplying and laying in position PVC. M 1200.00 638.11 100% 765732.00 2943.60 0.000 2943.60 1878340.60 0.00 1878340.60
Pipes …. Dia (outer 160mm….

Supplying and fixing in the encasement


20 41 C010.06.00 concrete, cable crossing indicator, made EACH 50.00 609.96 100% 30498.00 32.00 0.000 32.00 19518.72 0.00 19518.72
out
Supplying and laying Mild steel
galvinesed pipes conforming to IS 1239
21 45 C012.01.01.V04 (heavy.. Nom Dia 50 mm,pipe class M 260.00 1266.84 100% 329378.40 613.75 0.000 613.75 777523.05 0.00 777523.05
J2Ain position PVC. Pipes …. Dia (outer
160mm….

22 49 C012.03.01V02 Nom. Dia 50 mm , Pipe class J2A , - M 50.00 1069.78 100% 53489.00 74.20 0.000 74.20 79377.68 0.00 79377.68

23 58 C025.15.02V03 Providing and laying Brick masonry with cum. 350.000 4598.16 100% 1609356.00 373.54 0.000 373.54 1717578.29 0.00 1717578.29
locally available brick of specified class..

Providing 13 mm thick average cement


24 60 C025.16.02 plaster in cement mortar 1:3 ........ SQM 350.000 178.30 100% 62405.00 1553.59 0.000 1553.59 277005.74 0.00 277005.74

Supplying and fixing in position …….CI


25 62 C025.21.01 manhole frame with lugs and cover…… Each 2.000 9384.00 100% 18768.00 0.000 8.000 8.000 0.00 75072.00 75072.00
circular size 500 mm dia medium duty
of grade MD-10

Supplying construction,testing &


25 67 C025.53.02 commissioning of RCC Neutralisation Nos 4.000 150144.00 100% 600576.00 2.00 0.000 2.00 300288.00 0.00 300288.00
pit...

Providing 13 mm thick average cement


26 68 C025.55.00 plaster in cement mortar 1:6 ........ SQM 2500.00 234.60 100% 586500.00 1403.36 0.000 1403.36 329228.96 0.00 329228.96

27 69 C025.56.00 Providing 16 mm thick average cement SQM 2500.00 262.75 100% 656875.00 1392.02 0.000 1392.02 365754.04 0.00 365754.04
plaster in cement mortar 1:6 ........

UNDERGROUND SEWER SYSTEM-HDPE


28 83 C029.03.01V02 PIPES Dia 80mm
M. 20.00 5996.38 100% 119927.60 42.10 0.000 42.10 252447.60 0.00 252447.60

29 92 C034.03.03 100mm dia (All materials including M 95.00 3303.17 100% 313801.15 153.22 0.000 153.22 506095.19 0.00 506095.19
cement supplied by contractor) -

30 97 C034.14.01.V03 Construction of Soak pit ( 20 Users)..... EACH 2.00 45981.60 100% 91963.20 2.00 0.000 2.00 91963.20 0.00 91963.20

Constructing stand posts for drinking


31 100 C034.17.00 water tap including supply of water tap EACH 12.00 4720.15 100% 56641.80 4.00 0.000 4.00 18880.60 0.00 18880.60
1/2"

32 104 C034.19.01V13 Dia 50 mm , Brick Class 5 , - EACH 12.00 2796.43 100% 33557.16 8.00 0.000 8.00 22371.44 0.00 22371.44

Supplying and laying Mild steel


33 109 C034.20.01V04 galvinesed pipes conforming to IS 1239 M 40.00 1191.77 100% 47670.80 233.00 0.000 233.00 277682.41 0.00 277682.41
(heavy.. Nom Dia 20 mm.
34 111 C034.21.02.V01 Construction of stone ware gully trap.... EACH 5.00 2993.50 100% 14967.50 4.00 0.000 4.00 11974.00 0.00 11974.00

35 113 C034.22.02.02V0 Construction of inspection EACH 22.00 28152.00 100% 619344.00 11.00 0.000 11.00 309672.00 0.00 309672.00
1 chamber/manholes....

36 116 C034.23.02.V03 Construction of Septic Tank ( 20 EACH 2.00 46732.32 100% 93464.64 2.00 0.000 2.00 93464.64 0.00 93464.64
Users)....

Design engineering supply and


152 C175.01.00V12 commision ing of Clean agent at control 0.000 0.00 0.00
Room Barauni

10% Placement of Order and approval LS 1.00 3772368.00 10% 377236.80 1.00 0.000 1.00 377236.80 0.00 377236.80
of drawing

10% on issunace of release note/ LS 1.00 3772368.00 10% 377236.80 1.00 0.000 1.00 377236.80 0.00 377236.80
Despatch clearence

40% on receipt and acceptance of


37 material at site LS 1.00 3772368.00 40% 1508947.20 1.00 0.000 1.00 1508947.20 0.00 1508947.20

20% after erection and installation LS 1.00 3772368.00 20% 754473.60 1.00 0.000 1.00 754473.60 0.00 754473.60

10% testig and commisioning LS 1.00 3772368.00 10% 377236.80 1.00 0.000 1.00 377236.80 0.00 377236.80

10% on completion of all works in all LS 1.00 3772368.00 10% 377236.80 1.00 0.000 1.00 377236.80 0.00 377236.80
respects

38 154 C176.01.00V01 Capacity 500 Litres , - EACH 1.00 7375.82 100% 7375.82 1.00 0.000 1.00 7375.82 0.00 7375.82

39 155 C176.01.00V02 Capacity 1000 Litres , EACH 5.00 14742.26 100% 73711.30 2.00 0.000 2.00 29484.52 0.00 29484.52

40 157 C177.03.00 Construction of rain water reaching well EACH 6.00 81640.80 100% 489844.80 2.00 0.000 2.00 163281.60 0.00 163281.60
including earth work

Scratching out the bituminous Black top


41 177 C999.99.99V01 layer of existing road and disposal of SQM 600.00 375.36 100% 225216.00 464.50 0.000 464.50 174354.72 0.00 174354.72
same
Dismantling and installation of fire
42 180 C999.99.99V04 fighting equipments (Water monitor) EACH 1.00 1876.80 100% 1876.80 2.00 0.000 2.00 3753.60 0.00 3753.60
including

43 184 C999.99.99V09 Dismantling of BARBED WIRE FROM M 2700.00 5.63 100% 15201.00 118.70 0.000 118.70 668.28 0.00 668.28
EXISITING BOUNDARY WALL..

44 SOR NO. A415-000-16-49-CF-SOR-8160-C-1 M 0.00 0.00

Providing and laying average cement


45 4 A002.01.01 concrete flooring in panels... Sq.m 320.000 309.67 100% 99094.40 278.08 0.000 278.08 86113.03 0.00 86113.03

46 6 A002.02.03 Providing and laying Cement Granolithic Sq.m 25.000 431.66 100% 10791.50 49.67 0.000 49.67 21439.47 0.00 21439.47
Flooring…….

47 8 A002.03.01 Providing and laying average 50 mm Sq.m 5600.000 656.88 100% 3678528.00 1686.29 0.000 1686.29 1107688.27 0.00 1107688.27
thick Heavy Duty Flooring…….

Providing and laying Cement Plaster


48 11 A002.04.03 Skirting 12 mm...…. RM 165.000 46.92 100% 7741.80 292.59 0.000 292.59 13728.32 0.00 13728.32

49 14 A002.06.04 PVC panel Divider (3mmX20mmsize)..... RM 975.000 46.92 100% 45747.00 621.95 0.000 621.95 29181.89 0.00 29181.89

Providing andfixing Panel divider 40


50 16 A002.06.06 mm...... RM 11170.000 65.69 100% 733757.30 3503.82 0.000 3503.82 230165.94 0.00 230165.94

51 22 A002.10.01 25 mm thick kota stone.... Sq.m 90.000 1445.14 100% 130062.60 187.47 0.000 187.47 270925.45 0.00 270925.45

52 23 A002.10.03 18 mm thick kota stone.... Sq.m 30.000 1445.14 100% 43354.20 43.05 0.000 43.05 62215.81 0.00 62215.81

Kota Stone Extra for providing Round


53 24 A002.10.05 nosing.... RM 90.000 309.67 100% 27870.30 159.85 0.000 159.85 49500.75 0.00 49500.75

Providing and laying


54 26 A002.11.07 decorative,mat/mirror finish vitrified Sq.m 665.000 1407.60 100% 936054.00 451.66 0.000 451.66 635752.08 0.00 635752.08
porcelain tiles…….

Grainte Stone slabs in flooring


55 30 A002.17.01 ,counters,treads........ Sq.m 150.000 6287.28 100% 943092.00 178.01 0.000 178.01 1119212.54 0.00 1119212.54
56 31 A002.17.03 Grainte Stone slabs in risers, skirting, Sq.m 70.000 6606.34 100% 462443.80 90.10 0.000 90.10 595218.02 0.00 595218.02
dado......

57 32 A002.17.05 Grainte Stone extra for round RM 150.000 290.90 100% 43635.00 101.30 0.000 101.30 29468.17 0.00 29468.17
nosing...........

Door shutter faced with 1mm thick


58 37 A003.02.03 approved quality lamination of Sq.m 28.000 7507.20 100% 210201.60 13.67 0.000 13.67 102612.91 0.00 102612.91
approved

Approved make heavy duty overhead


59 40 A003.07.01 hydraulic door closer with adjustable UNIT 13.000 2158.32 100% 28058.16 3.00 0.000 3.00 6474.96 0.00 6474.96
spanners,

Approved make pressure die cast zinc


60 42 A003.07.05 alloy, chromium plated door handle. UNIT 13.000 619.34 100% 8051.42 0.00 0.000 0.00 0.00 0.00 0.00
150mm

Approved quality anodized aluminium


61 46 A003.07.09 aldrop 300mm long, 19.05mm dia in UNIT 13.000 750.72 100% 9759.36 8.00 0.000 8.00 6005.76 0.00 6005.76
bronze

Approved quality anodized aluminium


62 48 A003.07.11 tower bolts conforming to IS-204 in UNIT 13.000 281.52 100% 3659.76 8.00 0.000 8.00 2252.16 0.00 2252.16
Bronze

63 54 A004.01.03 P/F Pressed steel door frames…….... RM. 80.000 1285.61 100% 102848.80 39.98 0.000 39.98 51398.69 0.00 51398.69

Supplying and fixing fully glazed


64 63 A004.04.03 anodized.. Aluminium glazed door Sq.m 145.000 7685.50 100% 1114397.50 78.51 0.000 78.51 603355.56 0.00 603355.56

Supplying and fixing fully glazed


65 64 A004.04.07 anodized.. Aluminium type fixed Sq.m 100.000 7319.52 100% 731952.00 12.32 0.000 12.32 90176.49 0.00 90176.49
partion

Aluminium glazed window/ventilator


66 65 A004.04.13 with approved make sections, friction Sq.m 250.000 6568.80 100% 1642200.00 53.50 0.000 53.50 351439.67 0.00 351439.67
hinges,…….openable

Aluminium glazed window/ventilator


67 66 A004.04.14 with approved make sections, friction Sq.m 130.000 6099.60 100% 792948.00 191.93 0.000 191.93 1170682.81 0.00 1170682.81
hinges

Electrically operated rolling shutter as


68 69 A004.05.09 per approved manufacturers design & Sq.m 80.000 5255.04 100% 420403.20 18.00 0.000 18.00 94590.72 0.00 94590.72
drawing

Providing15 mm thick average cement


69 74 A005.01.05 plaster in cement mortar 1:4 ........ Sqm 3100.000 281.52 100% 872712.00 1899.40 0.000 1899.40 534718.89 0.00 534718.89
70 75 A005.01.07 Providing 12 mm thick average cement Sqm 8200.000 253.37 100% 2077634.00 3180.03 0.000 3180.03 805725.37 0.00 805725.37
plaster in cement mortar 1:4 ........

71 76 A005.01.09 Providing 6 mm thick average cement Sqm 5700.000 225.22 100% 1283754.00 4029.29 0.000 4029.29 907476.30 0.00 907476.30
plaster in cement mortar 1:4 ........

Plain cement plaster with


72 77 A005.01.13 waterproofing compound conforming Sqm 6400.000 281.52 100% 1801728.00 1540.27 0.000 1540.27 433616.13 0.00 433616.13
to 18MM THICK………..

Plain cement plaster with


73 78 A005.01.19 waterproofing compound conforming Sqm 800.000 225.22 100% 180176.00 1481.87 0.000 1481.87 333747.66 0.00 333747.66
to 06MM THICK………..

74 79 A005.04.00 Providing 20 mm X 10mm grooves in RM 7000.000 56.30 100% 394100.00 1659.70 0.000 1659.70 93441.11 0.00 93441.11
plastering...

75 82 A006.02.01 PL. CEMENT CONCRETE 1:2:4 Cu.m 500.000 6568.80 100% 3284400.00 118.11 0.000 118.11 775840.97 0.00 775840.97

Providing and laying 4 mm App


76 84 A006.12.01 Membrane waterprofing Sqm 4200.000 713.18 100% 2995356.00 1764.58 0.000 1764.58 1258460.31 0.00 1258460.31

Providing and applying two or more


77 86 A007.03.00 coats (to give a smooth and even shade) Sqm 6800.000 187.68 100% 1276224.00 1842.09 0.000 1842.09 345723.38 0.00 345723.38
of

Providing and applying two coats of Oil


78 88 A007.04.02 bound distempering ...... Sqm 8700.000 140.76 100% 1224612.00 3342.17 0.000 3342.17 470443.59 0.00 470443.59

79 90 A007.09.01 Providing and applying textured Sqm 2400.000 422.28 100% 1013472.00 1448.82 0.000 1448.82 611805.81 0.00 611805.81
granular type wall coating..........

Pproviding and applying/finishing the


80 93 A007.11.00 wall/RCC surfaces with premium acrylic Sq.M 2400.000 140.76 100% 337824.00 8528.70 0.000 8528.70 1200499.74 0.00 1200499.74
smooth exterior paint……

Providing and fixing 40mm x 6mm M.S.


81 95 A008.10.00 flat wind ties over sheeting with R.M. 700.000 290.90 100% 203630.00 1216.30 0.000 1216.30 353821.67 0.00 353821.67
anticorrosive

82 100 A008.12.08 PL.RAIN WATER PIPE ….160MM DIA RM 510.000 1126.08 100% 574300.80 225.50 0.000 225.50 253931.04 0.00 253931.04

Providing and laying in position


83 101 A008.17.00 approved quality profiled , precoated Sqm 5800.000 1079.16 100% 6259128.00 4260.16 0.000 4260.16 4597394.27 0.00 4597394.27
steel sheets
Providing and laying in position
84 102 A008.18.00 approved quality profiled , precoated Sqm 1500.000 1173.00 100% 1759500.00 445.21 0.000 445.21 522227.81 0.00 522227.81
steel RIDGE AND CORNER

85 103 A008.20.00 Providing and fixing in position Sqm 160.000 1876.80 100% 300288.00 90.00 0.000 90.00 168912.00 0.00 168912.00
Polycarbonate sheets.....

Providing and fixing white glazed


86 105 A009.01.00 Earthenware Orissa pan type water UNIT 2.000 8351.76 100% 16703.52 2.00 0.000 2.00 16703.52 0.00 16703.52
closet with

One urinal.(with 5 litre capacity cistern)


87 108 A009.03.01 - UNIT 2.000 8023.32 100% 16046.64 1.00 0.000 1.00 8023.32 0.00 8023.32

88 109 A009.03.02 Set of 2 urinals.(with 10 litre capacity UNIT 1.000 11730.00 100% 11730.00 1.00 0.000 1.00 11730.00 0.00 11730.00
cistern) -

Providing Hand wash basin of approved


89 111 A009.05.02 colour earthenware of approved shape UNIT 4.000 6390.50 100% 25562.00 4.00 0.000 4.00 25562.00 0.00 25562.00
( Oval

Providing and fixing approved quality


90 113 A009.09.00 chromium plated brass towel rail of UNIT 4.000 572.42 100% 2289.68 4.00 0.000 4.00 2289.68 0.00 2289.68
20mm dia,

Providing and fixing approved quality


91 114 A009.10.00 chromium plated liquid soap container UNIT 4.000 656.88 100% 2627.52 4.00 0.000 4.00 2627.52 0.00 2627.52
including

Providing and fixing stainless steel


92 118 A009.16.00 Kitchen/ Laboratory sink of approx. Size NO. 2.000 10510.08 100% 21020.16 1.00 0.000 1.00 10510.08 0.00 10510.08
610mm x

Providing and fixing minimum 17mm


93 119 A009.17.00 thick polished granite stone partitions SQM. 2.000 5405.18 100% 10810.36 0.53 0.000 0.53 2837.72 0.00 2837.72
(in

94 120 A009.18.00 Providing and fixing round edged mirror SQM. 2.000 1351.30 100% 2702.60 1.32 0.000 1.32 1783.72 0.00 1783.72
of 6mm thick float glass with 6mm thick

Providing and fixing CP Brass hand


95 121 A009.19.00 shower (health Faucet, of Jaquar or NO. 4.000 2252.16 100% 9008.64 2.00 0.000 2.00 4504.32 0.00 4504.32
approved

96 125 A010.01.02 GI Frame Work consisting of Wall Sqm 750.000 1323.14 100% 992355.00 367.65 0.000 367.65 486452.69 0.00 486452.69
channels.....

12.5 mm Thick false celing tiles made of


97 127 A010.02.03 Gypsum board.... Sqm 750.000 731.95 100% 548962.50 367.66 0.000 367.66 269105.76 0.00 269105.76
98 128 A010.09.00 Providing Fixing tray type aluminium Sqm 800.000 2796.43 100% 2237144.00 462.03 0.000 462.03 1292034.55 0.00 1292034.55
plank false celing.....

99 129 A010.12.00 Providing Fixing in position underdeck Sqm 2300.000 1126.08 100% 2589984.00 973.66 0.000 973.66 1096417.93 0.00 1096417.93
insulation........

100 131 A010.15.01 False Flooring Panels with 2 mm Sqm 700.000 6474.96 100% 4532472.00 271.77 0.000 271.77 1759725.78 0.00 1759725.78
thickfire Retardent...

False Flooring Panels with 10 mm thick


101 132 A010.15.03 polished mirror... Sqm 120.000 6850.32 100% 822038.40 0.00 0.000 0.00 0.00 0.00 0.00

102 135 A011.06.01 Providing and laying Plinth Sqm 1800.000 656.88 100% 1182384.00 529.90 0.000 529.90 348083.34 0.00 348083.34
protection.....

Providing and fixing 2000 mm high


103 140 A011.15.00 transformer gate consisiting of 50 Sqm 48.000 4044.50 100% 194136.00 50.40 0.000 50.40 203842.80 0.00 203842.80
mmX50mm.....laying Plinth
protection.....

Providing & Fixing in position steel


104 141 A011.16.00 intrance Gates………… Sqm 36.000 11232.65 100% 404375.40 12.30 0.000 12.30 138161.60 0.00 138161.60

105 144 A999.99.99V01 Providing and fixing wall mounted NO. 4.000 11523.55 100% 46094.20 2.00 0.000 2.00 23047.10 0.00 23047.10
chinaware wash down

Providing and fixing in position CP Brass


106 150 A999.99.99V10 Angular stop NO. 12.000 910.25 100% 10923.00 16.00 0.000 16.00 14564.00 0.00 14564.00

107 154 A999.99.99V14 Providing and fixing in position CP Brass NO. 4.000 910.25 100% 3641.00 4.00 0.000 4.00 3641.00 0.00 3641.00
Soap Dish of

108 156 A999.99.99V16 Providing and fixing in position CP Brass NO. 4.000 910.25 100% 3641.00 2.00 0.000 2.00 1820.50 0.00 1820.50
Toilet Paper

Providing and fixing in position CP Brass


109 158 A999.99.99V19 Bib Cock (model NO. 4.000 1219.92 100% 4879.68 9.00 0.000 9.00 10979.28 0.00 10979.28

110 161 A999.99.99V22 Providing and fixing 2 hours fire rated, SQM. 19.000 62872.80 100% 1194583.20 32.01 0.000 32.01 2012621.20 0.00 2012621.20
fully glazed, double

Providing and fixing 2 hours fire rated,


111 162 A999.99.99V23 single shutter steel SQM. 5.000 17078.88 100% 85394.40 12.29 0.000 12.29 209885.77 0.00 209885.77
112 163 A999.99.99V24 Providing and fixing 2 hours fire rated, SQM. 6.000 17735.76 100% 106414.56 16.38 0.000 16.38 290551.09 0.00 290551.09
double shutter

113 165 A999.99.99V26 Providing and fixing 2 hours fire rated, SQM. 50.000 32750.16 100% 1637508.00 21.76 0.000 21.76 712687.69 0.00 712687.69
glazed partition of

114 166 A999.99.99V29 Providing and fixing in position 1000 RM. 65.000 2233.39 100% 145170.35 118.75 0.000 118.75 265215.06 0.00 265215.06
high decorative

Providing and applying 5mm thick


115 169 A999.99.99V36 abrasion resistant epoxy floor coating of Sqm 1300.000 2252.16 100% 2927808.00 132.81 0.000 132.81 299114.06 0.00 299114.06

116 171 A999.99.99V38 Ceramic Coloured galzed type tiles....... Sqm 100.000 1313.76 100% 131376.00 205.00 0.000 205.00 269323.76 0.00 269323.76

117 173 A999.99.99V40 Providing and fixing 2 hours fire rated, Sqm 5.000 24116.88 100% 120584.40 5.33 0.000 5.33 128451.33 0.00 128451.33
single shutter steel

Aluminium Glazed louvers same as


118 174 A999.99.99V42 sections (refer Item No.: A004.04.13 & Sqm 5.000 5255.04 100% 26275.20 87.61 0.000 87.61 460401.94 0.00 460401.94

Providing and fixing steel bird mesh


119 175 A999.99.99V43 ventilator consisting of steel sections, as Sqm 150.000 469.20 100% 70380.00 126.00 0.000 126.00 59119.20 0.00 59119.20
per IS:

120 SOR NO. A415-000-16-49-CF-SOR-8160-C-0 M 0.00 0.00 0.00

Earth work in excavation below ground


121 4 S001.01.01 level for all kinds of works in all types of Cu.m 33020.000 215.83 100% 7126706.60 15523.44 147.976 15671.416 3350424.14 31937.66 3382361.80
soils except soft rock and hard
rock……….for a depth upto 1.5m………..
Earth work in excavation below ground
level for all kinds of works in all types of
122 5 S001.01.02 soils except soft rock and hard Cu.m 13750.000 243.98 100% 3354725.00 9094.35 73.176 9167.526 2218839.51 17853.48 2236692.99
rock……….for a depth beyond 1.5m and
upto and inclusive of 3.0m….
Earth work in excavation below ground
level for all kinds of works in all types of
123 6 S001.01.03 soils except soft rock and hard Cu.m 1660.000 375.36 100% 623097.60 4646.28 4.083 4650.363 1744025.78 1532.59 1745558.37
rock……….for a depth beyond 3.0m and
upto and inclusive of 4.5m….
Earth work in excavation below ground
level for all kinds of works in all types of
124 7 S001.01.04 soils except soft rock and hard Cu.m 1480.000 431.66 100% 638856.80 643.66 0.000 643.66 277843.14 0.00 277843.14
rock……….for a depth beyond 4.5m and
upto and inclusive of 6.0m….

Backfilling after execution of work…..


125 9 S001.07.01 Beyond a lead of 0M and upto & Cu.m 11450.00 178.30 100% 2041535.00 25854.00 181.216 26035.216 4609768.31 32310.81 4642079.12
inclusive of 100M….
Backfilling after execution of work…..
126 10 S001.07.02 Beyond a lead of 100M and upto & Cu.m 10330.00 197.06 100% 2035629.80 0.00 0.000 0.00 0.00 0.00 0.00
inclusive of 500M….

BACKFILLING after execution of the


127 11 S001.07.03 WORK to proper grade and level with Cu.m 10330.00 215.83 100% 2229523.90 534.24 0.000 534.24 115305.02 0.00 115305.02
selected

Transporting and disposing the surplus


earth and debris including shrubs and
128 13 S001.10.01 vegetations from contruction area Cu.m 3100.000 225.22 100% 698182.00 4072.45 0.000 4072.45 917197.19 0.00 917197.19
beyond the initial lead of100 M and
upto and inclusive of 1.0KM…………….
Transporting and disposing the surplus
earth and debris including shrubs and
129 14 S001.10.02 vegetations from contruction area Cu.m 3100.000 234.60 100% 727260.00 0.00 0.000 0.00 0.00 0.00 0.00
beyond the initial lead of 1.0KM and
upto and inclusive of 3.0KM…………….
Transporting and disposing the surplus
earth and debris including shrubs and
130 17 S001.10.05 vegetations from contruction area to Cu.m 3100.000 356.59 100% 1105429.00 0.00 0.000 0.00 0.00 0.00 0.00
area any whereout side the plant
boundary …………….

P/L PCC for all depths below and upto


131 20 S002.17.01 plinth level in foundations, drains Cu.m 890.000 6287.28 100% 5595679.20 581.55 1.742 583.292 3656398.41 10952.44 3667350.85
etc…………

P/L PCC(M-20) for all depths below and


132 21 S002.17.08 upto plinth level in foundations, drains Cu.m 230.000 7038.00 100% 1618740.00 159.72 0.000 159.72 1124079.95 0.00 1124079.95
etc…………

133 23 S002.18.15 P/L RCC of M20grade…….in sub- Cu.m 70.000 7976.40 100% 558348.00 120.04 0.000 120.04 957485.97 0.00 957485.97
structure……

P/L RCC of M30 grade…….in sub-


134 25 S002.18.17 structure…… Cu.m 7950.000 8164.08 100% 64904436.00 2729.59 0.000 2729.59 22284623.44 0.00 22284623.44

135 27 S002.19.17 P/L RCC of M30 grade…….in sup- Cu.m 1690.000 8351.76 100% 14114474.40 907.75 0.000 907.75 7581299.70 0.00 7581299.70
structure ..

136 29 S002.20.02 P/L RCC OF M20 GRADE Flooring)........ CUM. 500.000 8257.92 100% 4128960.00 333.16 0.000 333.16 2751208.63 0.00 2751208.63

S/P in position HYDS bars


137 31 S002.23.08 reinforcement……………. MT 1080.000 73195.20 100% 79050816.00 614.250 0.996 615.246 44960150.36 72902.41 45033052.77

138 33 S002.25.01 P/F centering and shuttering in Sq.m. 15965.000 459.82 100% 7341026.30 13626.38 171.483 13797.863 6265683.39 78851.31 6344534.70
foundations,footings………

P/F centering and shuttering in Super


139 34 S002.25.02 structures……… Sq.m. 12510.000 591.19 100% 7395786.90 7426.01 0.000 7426.01 4390180.86 0.00 4390180.86
140 37 S003.03.13 P/L LEAK PROOF RCC OF GRADE M30… CUM. 430.000 11730.00 100% 5043900.00 124.68 21.447 146.127 1462496.40 251573.31 1714069.71

supplying and fixing in position 230mm


141 41 S003.05.02 wide x 5mm thick approved PVC water M 44.000 619.34 100% 27250.96 172.20 0.000 172.20 106650.35 0.00 106650.35
stops..

Supplying , transporting , storing ,


142 44 S004.03.03 fabricating & erecting in position … 0.000 0.00 0.00
structural steel works…

05% ON FINALIZATION OF QUANTITIES


PLAN AND SUBMISSION OF APPROVED MT 780.000 93840.00 5% 3659760.00 305.621 0.000 305.621 1433973.73 0.00 1433973.73
FABRICATION DRAWING

55% ON RECEIPT AND ACCEPTANCE OF MT 780.000 93840.00 55% 40257360.00 305.621 0.000 305.621 15773711.05 0.00 15773711.05
MATERIAL AT SIDE.

20% ON FABRICATION , SURFASE


143 PREPARATION AND APPLICATION OF MT 780.000 93840.00 20% 14639040.00 305.621 0.000 305.621 5735894.93 0.00 5735894.93
PRIMER COAT.

10% ON ERECTION, ALIGMENT


WELDING, GROUTING. MT 780.000 93840.00 10% 7319520.00 305.621 0.000 305.621 2867947.46 0.00 2867947.46

10% on completion of all works in all MT 780.000 93840.00 10% 7319520.00 305.621 0.000 305.621 2867947.46 0.00 2867947.46
respects

Supplying and appying coating of


144 46 S004.04.08 approved quality and shade as per SI. MT 775.000 7507.20 100% 5818080.00 308.724 0.000 308.724 2317649.82 0.00 2317649.82
No…..

supplying ,fabricating ,fixing & Keeping


145 49 S006.15.01 in position at all levels & locations MT 20.000 103224.00 100% 2064480.00 5.785 0.000 5.785 597147.54 0.00 597147.54
treaded Anchor Bolts …………

supplying TRANSPORTINGSTORING
146 51 S006.16.01 FEBRICATING IN FIXING IN POSITION MT 7.000 112608.00 100% 788256.00 6.410 0.000 6.410 721794.50 0.00 721794.50
MS. METAL…

Supplying, fabricating and erecting in


147 55 S006.18.01 position at all levels and locations MT. 30.000 112608.00 100% 3378240.00 3.10 0.000 3.10 349411.60 0.00 349411.60
bolted,

148 57 S006.19.06 Supplying, fabricating and erecting in MT. 30.000 107916.00 100% 3237480.00 11.11 0.000 11.11 1199165.96 0.00 1199165.96
position at all levels and locations

Supplying, fabricating and fixing in


149 70 S006.23.01 position at all locations 1000mm high M 2820.00 2233.39 100% 6298159.80 74.55 0.000 74.55 166499.22 0.00 166499.22
INCLINED
150 71 S006.23.03 Supplying, fabricating and fixing in M 330.00 2186.47 100% 721535.10 151.28 0.000 151.28 330764.81 0.00 330764.81
position at all locations 1000mm high

P/L brick masonry with bricks of class


151 76 S007.09.01 5.0 in cement mortar 1:6 …….. At all Cu.m 85.000 5724.24 100% 486560.40 462.36 0.000 462.36 2646637.42 0.00 2646637.42
depths below plingth level…..

P/L brick masonry with bricks of class


152 77 S007.09.02 5.0 in cement mortar 1:6 …….. At all Cu.m 2445.000 5911.92 100% 14454644.40 1010.33 0.000 1010.33 5973012.16 0.00 5973012.16
depths above plingth level…..

Dismantling of brick work for all depths


153 80 S010.01.01 below plinth level…. Cu.m 1010.000 1107.31 100% 1118383.10 327.57 0.000 327.57 362716.39 0.00 362716.39

154 81 S010.01.02 DISMANTLING OF BRICK WORKALL Cu.m 165.000 1698.50 100% 280252.50 123.11 0.000 123.11 209109.24 0.00 209109.24
DEPTH…

155 83 S010.02.01 Dismantling of RCC work for all depths Cu.m 310.000 2627.52 100% 814531.20 34.81 0.000 34.81 91453.46 0.00 91453.46
below plinth level….

Dismantling of PCC work for all depths


156 85 S010.04.01 below plinth level…. Cu.m 80.000 2026.94 100% 162155.20 57.31 0.000 57.31 116162.88 0.00 116162.88

Dismantling Bolted /Rivetted


157 88 S010.06.01 /Welded /Sructural steelwork of all MT 2.000 13137.60 100% 26275.20 0.00 0.000 0.00 0.00 0.00 0.00
descriptions ….

Dismantling GI
158 90 S010.07.01 /Asbestos/trans/lucent/sheet,Ridges,Gu Sq.m. 2.000 187.68 100% 375.36 0.00 0.000 0.00 0.00 0.00 0.00
tters etc…………

Providing and injecting approved


159 93 S011.01.01 chemical emulsions……..for pre- Sq.m. 4140.000 140.76 100% 582746.40 1678.09 0.000 1678.09 236207.95 0.00 236207.95
constructional ANTI-TERMITE
TREATMENT……….

160 95 S011.06.01 Sand Filling………… Cum 675.00 1051.01 100% 709431.75 319.42 0.000 319.42 335712.56 0.00 335712.56

Providing & laying 40mm thick


161 97 S011.07.01 DPC…………… Sqm 480.00 778.87 100% 373857.60 309.59 0.000 309.59 241129.58 0.00 241129.58

162 100 S999.99.99V01 Supplying AND FILLING SAND GRAVEL CUM. 110.00 1341.91 100% 147610.10 57.63 0.000 57.63 77330.32 0.00 77330.32
MIX 1:1 BELOW

Supplying AND LAYING GEO GRIT SS20


163 101 S999.99.99V02 OR EQUIVELENT… SQM. 550.00 234.60 100% 129030.00 198.62 0.000 198.62 46596.25 0.00 46596.25
164 4 E106.01.01 63 A, 415 V, 5 pin sockets NOS 11.00 19237.20 100% 211609.20 1.00 0.000 1.00 19237.20 0.00 19237.20

165 12 E207.01.03 Supplying AND LAYING GI PIPE 65MM M 455.00 534.89 100% 243374.95 32.40 0.000 32.40 17330.44 0.00 17330.44
NB SIZES…

166 13 E207.01.07 Supplying AND LAYING GI PIPE M 825.00 1266.84 100% 1045143.00 249.38 0.000 249.38 315924.56 0.00 315924.56
150MM NB SIZES…

Supply, fabrication and installation of


167 15 E208.08.00 MS base frames, supports for KG. 100.00 131.38 100% 13138.00 256.00 0.000 256.00 33633.28 0.00 33633.28
switchgear,

168 18 E304.01.01 Type IND 1 Fixtures. - NOS. 36.00 1407.60 100% 50673.60 100.00 0.000 100.00 140760.00 0.00 140760.00

169 20 E304.01.04 Type IND 4 Fixtures. - NOS. 106.00 2158.32 100% 228781.92 51.00 0.000 51.00 110074.32 0.00 110074.32

170 22 E304.01.13 Type SFD 12 Fixtures. - NOS. 12.00 1501.44 100% 18017.28 6.00 0.000 6.00 9008.64 0.00 9008.64

171 24 E304.01.22 Type RSD 10 Fixtures. - NOS. 28.00 1126.08 100% 31530.24 12.00 0.000 12.00 13512.96 0.00 13512.96

172 28 E304.01.47 Type ST 1 Fixtures. - NOS. 4.00 4504.32 100% 18017.28 6.00 0.000 6.00 27025.92 0.00 27025.92

173 31 E304.02.03 Type CFL 3 Fixtures. - NOS. 10.00 2721.36 100% 27213.60 20.00 0.000 20.00 54427.20 0.00 54427.20

174 32 E304.02.12 Type CFL16 Fixtures. - NOS. 16.00 1689.12 100% 27025.92 23.00 0.000 23.00 38849.76 0.00 38849.76

300 mm dia., 1 phase, 900 rpm, wall


175 35 E305.01.01 mounting type epoxy painted exhaust NOS. 8.00 4879.68 100% 39037.44 5.00 0.000 5.00 24398.40 0.00 24398.40
fan

450 mm dia., 1 phase, 900 rpm, wall


176 36 E305.01.02 mounting type epoxy painted exhaust NOS. 13.00 5911.92 100% 76854.96 4.00 0.000 4.00 23647.68 0.00 23647.68
fan

Supply, installation, connection, testing


177 37 E305.04.00 and commissioning of 240 V AC, 1200 NOS. 4.00 3199.94 100% 12799.76 5.00 0.000 5.00 15999.70 0.00 15999.70
mm
178 43 E307.01.01 5 A, 5 pin flush/ surface mounting NOS. 42.00 487.97 100% 20494.74 48.00 0.000 48.00 23422.56 0.00 23422.56
sockets/receptacles. -

179 44 E307.01.03 15/5 A, 6 pin flush / surface mounting NOS. 66.00 534.89 100% 35302.74 77.00 0.000 77.00 41186.53 0.00 41186.53
sockets/receptacles

180 47 E307.02.01 5 A, piano type flush/surface mounted NOS. 155.00 168.91 100% 26181.05 181.00 0.000 181.00 30572.71 0.00 30572.71
swtches. -

15 A, piano type flush/surface mounted


181 48 E307.02.03 swtches. - NOS. 66.00 337.82 100% 22296.12 47.00 0.000 47.00 15877.54 0.00 15877.54

Supply and installation of dust and vermin


182 52 E308.01.02 proof G.I. sheet steel (1.6 mm thick) NOS. 9.00 1,219.92 100% 10979.28 2.00 0.000 2.00 2439.84 0.00 2439.84
JUNCTION BOX.

183 57 E309.02.01 40 A, 4 pole incomer MCB isolator and 6 NOS. 9.00 15014.40 100% 135129.60 2.00 0.000 2.00 30028.80 0.00 30028.80
Nos. outgoing single pole MCBs

40 A, 4 pole incomer MCB isolator and


184 58 E309.02.02 12 Nos. outgoing single pole MCBs NOS. 14.00 17829.60 100% 249614.40 8.00 0.000 8.00 142636.80 0.00 142636.80

185 59 E309.02.03 40 A, 4 pole incomer MCB isolator and NOS. 11.00 21583.20 100% 237415.20 5.00 0.000 5.00 107916.00 0.00 107916.00
18 Nos. outgoing single pole MCBs

Circuit wiring with 660 V grade , PVC


186 62 E310.03.01 insulated copper wires in 3CX1.5sq.m... M 2300.00 121.99 100% 280577.00 3866.46 0.000 3866.46 471669.21 0.00 471669.21

187 63 E310.03.02 Circuit wiring with 660 V grade , PVC M 850.00 159.43 100% 135515.50 4410.80 0.000 4410.80 703213.84 0.00 703213.84
insulated copper wires in 3CX2.5sq.m...

188 67 E310.04.04 3 C x 2.5 sq. mm armoured Cu cables. - M. 1110.00 168.91 100% 187490.10 720.60 0.000 720.60 121716.55 0.00 121716.55

Supply and installation of 50 mm x 50


189 72 E310.08.00 mm, (18 SWG) 'METSEC' channel M. 900.00 487.97 100% 439173.00 155.00 0.000 155.00 75635.35 0.00 75635.35
190 74 E310.09.01 1.5 sq. mm wires. - M. 1200.00 46.92 100% 56304.00 1389.46 0.000 1389.46 65193.28 0.00 65193.28

191 76 E310.10.01 Supplying of (concealed type ) PVC M 1220.00 93.84 100% 114484.80 7973.55 0.000 7973.55 748238.31 0.00 748238.31
conduit of 25mm dia meter

192 77 E310.10.02 Supplying of (concealed type ) PVC M 2170.00 159.53 100% 346180.10 811.10 0.000 811.10 129394.78 0.00 129394.78
conduit of 40mm dia meter

Supplying,installation,testing and
193 80 E402.01.01 commisioning of GI earth Nos 46.00 12002.14 100% 552098.44 33.00 0.000 33.00 396070.62 0.00 396070.62
electrode...........

Supplying AND INSTALLATION AND


194 83 E403.01.02 CONNECTION OF 50X6MM GI M 700.00 403.51 100% 282457.00 118.60 0.000 118.60 47856.29 0.00 47856.29
EARTHING ……

Supplying AND INSTALLATION AND


195 84 E403.01.04 CONNECTION OF 20X3 MM GI M 1250.00 140.76 100% 175950.00 895.70 0.000 895.70 126078.73 0.00 126078.73
EARTHING ……

Supplying AND INSTALLATION AND


196 86 E403.02.01 CONNECTION OF 75 X10 MM GI M 600.00 487.97 100% 292782.00 527.00 0.000 527.00 257160.19 0.00 257160.19
EARTHING ……

Supplying AND INSTALLATION AND


197 87 E403.02.02 CONNECTION OF 50X6MM GI M 700.00 290.90 100% 203630.00 1983.30 0.000 1983.30 576941.97 0.00 576941.97
EARTHING ……

198 91 E404.01.01 3/8" dia (10 mm) flexible rope. - M. 180.00 168.91 100% 30403.80 46.00 0.000 46.00 7769.86 0.00 7769.86

199 96 E405.01.01 GI earth plate as per std. 7-51-0103. - NOS. 47.00 1201.15 100% 56454.05 11.00 0.000 11.00 13212.65 0.00 13212.65

TDJB Flush mounting type with an


200 100 E502.01.06 additional cable pull box at bottom for NOS. 4.00 8445.60 100% 33782.40 2.00 0.000 2.00 16891.20 0.00 16891.20
easy

201 102 E502.02.02 Flush Mounting Type. - NOS. 31.00 807.02 100% 25017.62 16.00 0.000 16.00 12912.32 0.00 12912.32

202 104 E502.03.01 1 No. twin flat wire. - M. 350.00 56.30 100% 19705.00 667.95 0.000 667.95 37605.59 0.00 37605.59

203 0 EXTRA-9 RSD-7 NOS. 259.00 4793.00 100% 1241387.00 121.00 0.000 121.00 579953.00 0.00 579953.00
204 0 EXTRA-10 SFD-6 NOS. 16.00 7832.88 100% 125326.08 16.00 0.000 16.00 125326.08 0.00 125326.08

Supply, installation, testing and


commissioning of 240 V AC,
205 0 EXTRA-12 NOS. 8.00 6048.00 100% 48384.00 2.00 0.000 2.00 12096.00 0.00 12096.00
450mm Dia., wall mounting fan with
reulator.

Design, Procurement, Installation &


Commissioning of Electrical power
206 0 EXTRA-16 feeder along with accessories & Lot. 2.000 1415000.00 100% 2830000.00 0.000 1.000 1.000 0.00 1415000.00 1415000.00
electrical Cabling with end
termination.

Design, Procurement, Installation &


Commissioning of transformer for
generating neutral supply for
207 0 EXTRA-17 Lot. 2.000 325000.00 100% 650000.00 0.000 1.000 1.000 0.00 325000.00 325000.00
Electrical power feeder along with
accessories & electrical Cabling with
end termination.

Total amount excluding service Tax in Rs. 249686695.92 572986.01 251999681.94

Add service Tax @5.6% 13982454.97 32087.22 14111982.19

Gross Bill amount including service Tax in Rs. 263669150.90 605073.23 266111664.13

Say in Rs. 263669151 605073 266111664

for RKSCPL for EIL for OIL

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:


ABSTRACT
Name of contractor :- Ram kripal singh construction Pvt. Ltd.
Name of client :-
OIL INDIA LIMITED
CIVIL & STRUCTURAL WORKS FOR (PART-C) FOR UPGRADING PUMP
NAME OF WORK :- STATIONS/TERMINALS OF NAHRKATIA-BARAUNI CRUDE OIL PIPELINE (NBPS)
PROJECT
W. O. No.:- PL/CONT-03/3-23/4811 DT.
Bill No :- FINAL upto-15.07.2016
Sl. SOR Item Sl. Reference
Item No. Description Of Work Unit Quantity
No. No. Page No.

Circular size 500mm dia. CI


1 62 C025.21.01 Nos. 8.000
Manhole frame…..

Earth work Excavation below


2 4 S001.01.01 Ground Lvl. All kinds of Cum 147.976
works……..a depth upto 1.500 mt.

Earth work Excavation below


3 5 S001.01.02 Ground Lvl. All kinds of Cum 73.176
works……..a depth upto 3.000 mt.

Earth work Excavation below


4 6 S001.01.03 Ground Lvl. All kinds of Cum 4.083
works……..a depth upto 4.500 mt.

Bacfilling after the execution of


5 9 S001.07.01 work.......beyound a lead of 0 and Cum 181.216
upto & inclusive of 100 mtr.

Provinding and laying Plain


Cement Concrete ……1:5:10….
6 20 S001.17.01 Cum 1.742
.for all depth below and upto plinth
Lvl. In foundation……..

supplying and placing in position


7 31 S002.23.08 high strength deformed steel bars MT 0.996
reinforcement for RCC works.

Providing & fixing centering in


foundation ,raft, footings,… for all
8 33 S002.25.01 Sqm. 171.483
depth and upto & inclusive of plinth
level

Providing & laying Leak Proof


9 37 S003.03.13 Reinforcement Cement Concrete of Sqm. 21.447
M-30 grade…….in Sub Structure.
OIL INDIA LIMITED
MEMORANDUM OF PAYMENT
FINAL BILL
Bill period:15/07/2016
1. Name of work:- CivilBarauni
& structural work(for Part-C) for upgrading pump stations/terminals of Naharkatiya- BarauniDt.25.12.2016
crude oil
pipeline(NBPS) project of OIL.
2. Name of Contractor:- M/s Ram Kripal Singh Construction Pvt. Ltd.
(a) LOA No and Date:-PL/CONT-03/3-23/4811 dated 04.01.2014.
(b) W.O No and Date:-
3. Date of starting work:- 04.01.2014
4. Date of schedule completion of work:- 03/03/2015
5. Extensions if any:-15.07.2016
6. Date of actual completion of work:- In Progress
7. Contract value of work:- Rs.52,00,03,661.86/- (excluding service tax)
8. Service Tax Registration No:- AACCR6279FST001
9. TIN/GNR No:-19891649836
10. VAT No:-19891649836
11. PAN No:-AACCR6279F

Upto Previous(Rs.) Since Previous(Rs.) Total upto Date(Rs.)


(A) WORK DONE
Gross Total amount (Excludingservice tax) as per 249686695.92 572986.01 250259681.93
Abstract
Total (A) 249686695.92 572986.01 250259681.93

(B) Other Payment Recommended


1. Secured advance 0 0 0
2. Service Tax @ 5.6% 13982454.97 32087.22 14014542.19
Total (B) 13982454.97 32087.22 14014542.19
( C ) RECOVERIES
1.Security Deposit 10% 24968669.5923664 57298.60 25025968.1933664
2.Mobilisation Advance 0 0 0
3. Interest on Mobilisation advance 0 0 0
4. Income Tax @ 2% on 0 0 0
5. WCT (WB) @3% 0 0 0
6. WCT (Bihar) @ 0 0 0
7. Electricity 0 0 0
8. Water charge 0 0 0
9. Equipment Hire charge 0 0 0
10. Medical expenses 0 0 0
11. Other 1% (for construction workers cess) on 0 0 0
TOTAL (C) 24968669.59 57298.60 25025968.19

(D) Net payment(A+B-C) 238700481.30 547774.63 239248255.93


Recommended 238700481 547775 239248256
Remarks: 1. Certified that the works have been done as per drawings and measured as per contract
2. The works claimed have not measured in the earlier bills
3. The items are inclusive & upto 90% payable category as per contract

Signature of RKSCPL Signature of EIL Signature of OIL


TAX INVOICE 25.12.2016
Period : 15.07.2016
Bill No. & Date : Final(PS-10), Barauni
Name of Contractor : M/s RAM KRIPAL SINGH
CIVIL&STRUCTURAL CONSTRUCTION
WORK(FOR PVT.UPGRADING
PART-C) FOR LTD. PUMP
Name of work : STATIONS/TERMINALS OF NAHARKATIYA-BARAUNI CRUDE OIL
L.O.A No. & Date : PIPELINE(NBPS PROJECT OF
PL/CONT/-03/3-23/4811 OIL.04/01/2014
dated
Contractual Commencement Date : 04.01.2014
Contractual Completion Date : 03.03.2015
Date of Extention 15.06.2016
Original Contract Value : 52,00,03,661.86/-eclusive of service tax @4.944%.
Service Tax Number. AACCR6279FST001
VAT No.(State-WB) 19891649836
PAN No. AACCR6279F
Sl. No. Item Code Item Description Qty. Unit Price (Rs.) Unit Code Value in Rs.

Bill for Services provided towards


1 _ Civil&Structural Works as per 1 572986.01 _ 572986.01
annexture.

Total 572986.01
Copy/Remarks: Item Value 572986.01
Service Tax Category : Service Value 572986.01
Service Tax @ 5.6% 32087.22
Sales Tax 0.000
Invoice Amount 605073.23
Amount Due 605073.23
Total payable Amount 605073
Amount in words: Four Crore Sixty Four Lakh Forty For RKSCPL
Thousand Eighty Seven only.
Name:
Signature:
Date:
OIL INDIA LTD
NBPS Project
PS-10, Barauni
Final Bill:- PS-07, PS-08, PS-09 & PS-10

1. Name of work :-CIVIL & STRUCTURAL WORKS FOR (PART-C) FOR UPGRADING PUMP
STATIONS/TERMINALS OF NAHRKATIA-BARAUNI CRUDE OIL PIPELINE (NBPS) PROJECT

2. Name of contractor:- M/S RKSCPL

W.O.I. No & Date:-PL/CONT-03/3-23/4811 DT. 04.01.2014

INDEX SHEET
Sl. No. Description Page no. No. Of Sheets

1 Letter 1 1

1 Invoice 2 1

2 Memorandum of payment 3 1

3 Combined Abstract of Payment 4 to 38 35

4 Barauni Abstract of Payment 39 to 55 17

5 Sonapur Abstract of Payment 56 to 74 19

6 Madarihat Abstract of Payment 75 to 82 8

7 Dumar Abstract of Payment 83 to 90 8

8 Abstract for page nos. 91 1

9 Measurment Sheet 92 to 112 21

12 Statutory Compliance Sheet and Documents 113 to 132 20

Total no sheets= 132

You might also like