附录A:重大临时工程和临时工程分类清单
Note:
1. Temporary works, which might have impacts on the permanent work, require the work to be reviewed by the Permanent Work Designer (PWD) to
ensure permanent work is not adversely affected by MTW/TWs;
可能会对永久工程产生影响的临时工程需要永久工程施工图设计单位确认其对永久工程无影响;
2. MTW, otherwise stated, requires the work to be reviewed by the Permanent Work Designer to ensure work is not adversely affected by the
Temporary work;
如无特殊说明,重大临时工程(MTW)则需要施工图设计单位确认其对于永久工程无影响;
3. MTW must be endorsed by PE while TW depends on the importance of the work as marked in *;
重大临时工程(MTW)和部分标*的临时工程(TW)需要PE签字;
4. The list might be updated according to the site work progress.
本清单可能会根据现场工作开展进行更新。
5. Board of Engineers Malaysia: Guideline No. 001 - The Role and Responsibility of Professional Engineers for Temporary Works during Construction
Stage
http://www.bem.org.my/documents/20181/50002/Approved+313+BM+21.8.pdf/
Temporary Works
that form part of
Permanent
Works
将成为永久共程
一部分的临时工
程