How to Register: Demonstrates comprehensive knowledge in
the principles and practices of controlling Step 1: Fill in and submit the online application sediment, erosion and storm water form pollutants. Link for google form: Demonstrates the skills to observe onsite https://forms.gle/m7deZJHZFLTgFAR57 and offsite conditions that impact storm water discharges from active construction sites. MALAYSIAN CERTIFIED INSPECTOR OF SEDIMENT Step 2: Made payment and email the proof of payment to mso.seminar@gmail.com Demonstrates inspection expertise on AND EROSION CONTROL [MY-CISEC] TRAINING BMPs to determine if the mitigation & measures will minimize the discharge of CERTIFICATION EXAMINATION Step 3: You will receive the comfirmation letter pollutants from active construction sites. for the course, once your registration is accepted. Demonstrates the ability to communicate and report on their inspection of Date : March 30th – April 2nd , 2020 construction sites as to whether compliance Venue : Sunway Putra Hotel, Kuala Lumpur situations exist. Any inquiry please contact us at: *A Registrant is a person who has passed the certified examination. Email: mso.seminar@gmail.com This course meets CPD/PDH points from TRAINING MODULES Contact Person: 017-2229675 [Hasanah] EiMAS,MSO and BEM. 010-6549675 [Zahirah] *subjected to approval Inspector certification course with rules & regulations of Malaysia. About CISEC Inc. (USA) 3 ½ days ESC training and exam Its a non-profit 501(c) 6 organization which administers an international certification program that recognizes the abilities, skills, experience, and Course Fee:- Module 1: Rules & Regulation knowledge of inspectors who demonstrate their Member Non-Member proficiency in observing, inspecting, and reporting Normal RM3000 /pax RM3110/pax on the implementation of Stormwater Pollution JPS - MSMA Stormwater Management Early Bird Prevention Plans (SWPPPs) & EMP. Submission Checklist *Registrant and payment RM2800 /pax RM2910 /pax Malaysian Rules & Regulations before 29th Feb 2020 including but not limited to: Environment Quality Act Group *Minimum 5 pax RM2700 /pax RM2810 /pax The CISEC Programs 1974- EIA Sect 34A, Federal Land Conservation Act 1960, Water Act 1920, Local Government Act 1976, Reseat Exam CISEC provides comprehensive sediment and Town and Country Planning Act 1976, Street, RM500/ pax RM610/pax Only erosion and storm water pollution control inspector Drainage and Building Act Sect 70A, B,C& 71, Payment to : programs: Uniform Building By-Laws Sect 83, Fisheries Act Account Name: Pertubuhan Saliran Mesra Alam 1985 Sect 38(1)(k)…incl. new DOE-EIA Order 2015, *CISEC Registrant* Program Malaysia (Malaysian Stormwater Organisation) Individuals with two or more years of construction Environment Mainstreaming, GSR & LDPPMM. Account Number : 8001364810 [CIMB Bank] site inspection experience can apply for the CISEC Evaluating Construction Permit Processes & *payment can be made through bank transfer/ Registrant Examination and upon passing be Inspector Requirement cheque/cash certified CISEC Registrant. Understanding EMP and the S & EC Drawings *Local Order [LO] accepted Module 6 : Field –Trip Project Site
Class is divided into teams of 5-6 each with
divided roles & responsibilities, must have full set of PPEs Module 4 : Conducting Construction Site Teams shall identify & report BMPs installed Module 2 : Background of an Inspector correctly or otherwise; with 5W+1H questions Inspections Definitions o Erosion Inspection Requirements o Sediment o Role of Designers, Inspectors, and o Sedimentation Contractors Polymers and Sedimentation Inspector Responsibilities During Construction A Primer on Hydrology Activities o Topographic maps o Inspection Reports Module 7 : Teams Finding, Develop Report o Hydrographs and Sedigraphs o Reporting on BMP Maintenance o Documentation and Communication and Presentation Critical Inspector Requirements o Working with Contractors and Clients o EMPs and BMPs o Communication Inspecting a Construction Site Teams work separately to develop site o Recognizing limitations o During construction, Before grading sedimentation & erosion management report CISEC Code of Ethics o During construction, After grading Teams presentation to the class
Module 3 : Inspecting Best Management
Practices
Understanding the Phases of Construction
Inspecting o Barriers o Check structures o Drains and Inlets Sediment Containment Module 8 : Examination of Malaysian Systems Certified Inspector of Sediment and Erosion o Polymers o Wind/Dust control methods Control (MY-CISEC) o Erosion control practices Module 5 : General Exam Review o Hazardous waste material sites MY-CISEC Registrant Exam : 3.5 Hour Writing and Assessing Inspection Reports