You are on page 1of 1

Project Name : Msheireb Down Town Doha Project

Project No. : BP-04-04

Submittal Comment Sheet


Package No. : BP-04-04-00691 Rev: 01

Item No. : BP-04-04-01525 Rev: 01

Description : Material Submittal for Condensate Drain Pipe

Received Date : 31 July 2017

Response Date : 05 August 2017

Responder : Sameh Abied

Response : Approved As Noted “B”

Mechanical Comments:

1. No objection Technically for the proposed Condensate drain pipework by (Hepworth,


Qatar) as specified by the vendor list.
2. The proposed UPVC pipe class E is acceptable subject for the compliance to the addressed
comments.
3. The proposed system fittings shall be of the same pressure rating class E.
4. Final Arrangements / Sizes and locations shall be as per the approved shop drawings.
5. The pipe work installation & Insulation shall be done as per the approved method of statement.

For CEG International

______________
Hesham Ghoneim
Asst.R.E. Phase 4