Description : Material Submittal for Condensate Drain Pipe
Received Date : 31 July 2017
Response Date : 05 August 2017
Responder : Sameh Abied
Response : Approved As Noted “B”
Mechanical Comments:
1. No objection Technically for the proposed Condensate drain pipework by (Hepworth,
Qatar) as specified by the vendor list. 2. The proposed UPVC pipe class E is acceptable subject for the compliance to the addressed comments. 3. The proposed system fittings shall be of the same pressure rating class E. 4. Final Arrangements / Sizes and locations shall be as per the approved shop drawings. 5. The pipe work installation & Insulation shall be done as per the approved method of statement.