You are on page 1of 20

National Programme Office, Kabul

Engineering Department
April- 2020
No. Date
1
3

Revision

General Notes
Approved by

Surveyed by
Checked by

Structural Design by

1- The bridge has been designed for IRC Class A live loading
2- Bearing capacity of soil taken 200KN/m² in foundation design
and it should be compared with actual capacity of soil under foundation.
Bishwo Shrestha

Uma Shankar

Zia Fazily

Amin

If the actual capacity of soil is less than considered in design, it


should be inform to Kabul engineering department to redesign foundation
according to the actual bearing capacity of soil.
3- All dimension are in cm unless specified and Levels are in m.
4- Levels given to the structures and chainage taken for road are arbitrary
value and are referenced from the surveyed BM
5- Materials obtained from cutting should be used for filling purpose.
6- Clear cover for superstructure should be of 40mm and substructures and
foundation should be 75mm.
7- Concrete used is
Aga Khan Foundation, Afghanistan

- M15 for Wing Wall Top cover PCC,


Central Engineering Department
National Program Office, Kabul

-M20 or equivalent for Sub Structure,kerb, Approach slab, and Wing Wall
RCC Band.
-M25 or equivalent for Superstructures and Abutment.
ALL Structural Concrete shall be mix designed confirming ACI-318/Indian
standard code of practice.
8- Stone masonry used is 1:4 for Wings Wall and other
9- All steel reinforcement should be deform and grade (Fe-415).
10- Concrete in main girders, cross girders and deck slab shall be placed in
full width, no permission for construction joints in the middle of girders and
slab.
11- Concrete in safety Krebs shall be placed at least 20 days after placing
concrete in deck slab.
Date
Drawing No.

Scale

12- Duration of curing of RCC and PCC work shall not be less than 28 days.
13- Water should be clean and without organic materials for structures work.
As shown(A3)
April-2020
ST-1

14- Bearing pads shall conform to AASHTO/IRC standard specification for


highway bridges.
15- Reinforcement detail shall be as per Drawings. Lapps shall provide
for standards practice with staggering distance of 1.3 times
the developing length
Project Code

District

Province
Village

16- Construction and materials used shall be carried out as per the
specification and drawings.Contractor should get approval before
any changes taken place during construction.
Baghlan
BDK-INF

Rawand

Mai-e-Mai

17- Length, height and slope of wing walls and protection wall should be
adjusted according to the site condition.
Drawing Title:

Project name:

18- Only one vehicle (IRC Class A) should be permitted to pass/cross the
bridge at one time.
Rawand RCC Bridge

19- No traffic should be allowed for 30 days of construction of deck slab.


General Notes
LEGEND TABLE
Descriptions Alignments
Existing Wooden Bridge
Existing Tree

140
Existing River (River Direction)
Private Land
Site Benchmarks
Proposed PE Pipe d=250mm
Existing Building
North Arow

14.99
18.
0

3.50
3.50

3.50
5.50
14.9
8
18.0
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District Mai-e-Mai
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Approved by Drawing No. ST-2 Project Code
Topographic Survey Plan
3 Bishwo Shrestha BDK-INF
LEGEND TABLE
Descriptions Alignments
Existing Wooden Bridge
Existing Tree

140
Existing River (River Direction)
Private Land
Site Benchmarks
Proposed PE Pipe d=250mm
Existing Building
Proposed Site River Bank
Proposed Bridge
Proposed Canal

14.99
North Arow
18
.0

3.50
3.50

3.50
5.50
14.9
8
18.0
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District Mai-e-Mai
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Approved by Drawing No. ST-3 Project Code BDK-INF
Topographic Survey Plan and Site Plan
3 Bishwo Shrestha
Proposed Side river bank
Proposed PE Pipe d=250mm
Proposed
RCC Bridge
3.70

5.00
1
3.70
3.60
3.60

5.00
3.60
3.60 18.00
1
3.60
Existing Wooden
Bridge to be removed
Bridge Plan
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Approved by Drawing No. ST-4 Project Code
Plan
3 Bishwo Shrestha BDK-INF
Proposed 3inch GI pipe for crossing existing water supply
18.00 See Section D-D ST-5'
3.70 0.85 3.60 3.60 3.60 3.60 3.60
Impact block 0.85 3.70
(60cmx50cmx100cm) Impact block
RCC M20(1:1.5:3) (60cmx50cmx100cm)
1713.68
40.01
Back Filling with 29.85
Back Filling with
compaction 95%

3.62
compaction 95%

3.99
each 15cm layer each 15cm layer
by layer RCC M25(1:1:2)
by layer
1709.48
43.62 33.32
1708
Proposed PE (dia=250mm)
pipe instead of existing canal

5.38
5.01
1705
7.00 11.70 7.00
18.00
Section 1-1
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Approved by Drawing No. ST-5 Project Code
Section x-x
3 Bishwo Shrestha BDK-INF
Ø10 mm @15cm c/c
RCC M20 (1:1.5:3)
both sides
0.10

Ø8 STIRRUPS @20 C/C


Proposed Protection Wall
0.50

0.5
2NO'S Ø12
0.25
0.20
SECTION 1-1
0.50 0.50 0.50
1.50
RCC M20 (1:1.5:3)
Section A-A Ø8 STIRRUPS @20 C/C
L= 10.5 M

0.50
2NO'S Ø12
Rive

7.5 CM PCC
M:15 (1:2:4)
r Fl o

0.30
SECTION 2-2
w

Ø8 STIRRUPS @20 C/C

0.50
C a 2NO'S Ø12
n

0.30
al F
low
0.20

0.25
0.50 0.50 0.50 PLAN
11
. 1.50
Intake gate 10 72 DETAIL Z
.50
2 .0
0 Section B-B SKIN PLATE
4MM THICK
CHANNEL
L= 47 M CHANNEL
12X5X0.6CM 10X4.7X0.5CM

0.12
0.40
0.50
0.78 SECTION S-S

Ø0
BACK FILLING

0.70
HAND WHEEL D=40CM

.25
AREA = 0.40 M²
CUTTING
AREA = 0.51 M² BEARINPLATES&4BOLTS
Ca 18x16x2cm

0.50
SPINDLE Ø40MM

na
0.68 Proposed PE Pipe

l
SPINDLE CONNECTION

Flo
d=250mm

1.05
NUT

w
SKIN PLATE
Section C-C

0.50
4MM THICK
CHANNEL
L= 7 M 10X4.7X0.5CM

0.05
CHANNEL
0.12 12X5X0.6CM
Proposed PE Pipe
d=250mm Guard rail SECTION G-G
L=54M
HAND WHEEL D=40CM
BEARING PLATES &
4BOLLTS 18x16x2 CM
G
Curb
SPINDLE Ø40MM
0.60

0.22

0.35

0.50
CHANNEL12x5x0.6CM
SPINDLE CONNECTION
Proposed Road to NUT

1.05
SKIN PLATE
the bridge 4MM THICK S S

0.50
CHANNEL
Proposed 3inch GI 12X5X0.6CM

0.05
0.05 0.05
pipe for crossing CHANNEL 0.40
10X4.7X0.5CM 0.50
existing water supply
G
L=20M ELEVATION
INTAKE GATE PLAN
Proposed Canal Plan Section D-D SECTION S-S
SECTION G-G
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Approved by Drawing No. ST-5' Project Code
Proposed Canal and pipe detail
3 Bishwo Shrestha BDK-INF
10cm,th PCC(1:2:4)
240 6022 78
GL
113

50 10cm,th PCC(1:2:4)
273

64 3" PVC Pipe


for weep hole
60 90 15cm, th RCC
160

band M:20 (1:1.5:3)


70
75

15cm, th RCC 15cm, th RCC


band M:20 (1:1.5:3) band M:20 (1:1.5:3) 60 72
191 82
180

180

3" PVC Pipe

180
for weep hole
50
295

295

60

295
868

37
15cm, th RCC 15cm, th RCC
620

band M:20 (1:1.5:3) band M:20 (1:1.5:3)


262 50 48
180

180

200

180
545
RB RB RB
60 50 40
340 219
250

250

250

250
300

300

185

185
235

10cm PCC (1:3:6) 10cm PCC (1:3:6)


10cm PCC (1:3:6) 15cm Stone Soling 15cm Stone Soling
15cm Stone Soling
300 260
400
Section B-B Section C-C, D-D
Section A-A
230 150 150 197
Stone boulder 170 150 149 200
Stone boulder 147 150 150 150
Stone boulder
Compaction Soil
Compaction Soil Compaction Soil
Section X-X
Section Y-Y Section Z-Z
Ø12@20c/c Ø12@20c/c Ø12@20c/c Ø12@20c/c Ø12@20c/c
340 191 250 82 219
15cm, th RCC band 15cm, th RCC band
15cm, th RCC band for wing walls Sec B-B for wing walls Sec C-C & D-D
for wing walls Sec A-A
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District Mai-e-Mai
Rawand RCC Bridge
National Program Office, Kabul Date
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Approved by Drawing No. ST-6 Project Code BDK-INF
Wing Walls
3 Bishwo Shrestha
3.70 0.40
7.00 1713.68

1.68
0.50
1.30
1.20
0.15
Filter Layer

5.00
Gravel Filling

5.67
5.20
1708
G.L

8.68
3.00 1.40 2.60
3.00 2.60

3.00
ABUTMENT PLAN 1.40

0.40
1.30

0.90
0.10 0.10
1705
0.25
7.00
ABUTMENT ELEVATION
Note: Dimensions are in metre.
No. Date Revision Surveyed by Amin Scale Project name:
As shown(A3) Province Badakhshan
Aga Khan Foundation, Afghanistan Rawand RCC Bridge
1 Structural Design by M. Zia Fazily District Mai-e-Mai
National Program Office, Kabul Date April-2020
Drawing Title:
2 Checked by Uma Shankar Village Rawand
Central Engineering Department Abutment Plan & Section
Approved by Drawing No. ST-7 Project Code BDK-INF
3 Bishwo Shrestha
BAR BENDING SCHEDULE OF ABUTMENT WALL (PER WALL)
S.N SHAPE, Cm LABEL DIA.
(mm)
NOS. LENGTH
(m)
30
1 6.49
AB1 32 25 7.29
50
30
2 4.78 AB2
32 26 5.58
50
30
3 4.78 AB3 25 25 5.58
3.70 0.40
1713.68 50
30
4 6.49 AB4 25 26 7.29
12Ø@15c/c
50
16Ø@20c/c(AB13)
8Ø@10c/c
1.68

(AB16) 5 485 30
AB5 22 131 5.45
30
16Ø@20c/c(AB11)
16Ø@20c/c
(AB12)
16Ø@20c/c(AB12)
8Legged Stirrups
6 30 5 30 AB6 28 17 5.6
0.50

12Ø@12c/c(AB10)
9 1.40 2.6
2.9 1
16Ø10Nos(AB9) 8Legged Stirrups 7 AB7
28 26 7.8
40 40
12Ø@12c/c
(AB10) 8
25Ø@20c/c(AB4) 40 6.92 40 AB8 28 17 8.15
20Ø@20c/c(AB5)
8Ø@10c/c
9 490 15 AB9 16 10 5.2
32Ø@20c/c(AB2) 15
3Nos 20Ø (AB17)
in Both Face(AB-15) 33
8.68

10 12 39 AB10 12 168 1.68


5.67

5.20

20Ø@20c/c(AB5) 6Nos12Ø Link@100c/c


(AB-14)
25Ø@20c/c(AB3)
+
25Ø@20c/c(AB4)
1708 11 490 10
AB11
16 20 5.10
G.L 10
20
BEARING CUP REINFORCCEMENT 250
32Ø@20c/c(AB1)
+
12 AB12
16 26 3.2
32Ø@20c/c(AB2) 50
20
3.00 2.60
13 250 AB13
16 26 3.2
3.00

20Ø@20c/c
28Ø@20c/c
(AB5) 28Ø@20c/c 50
(AB7) (AB7)
14
0.40

10
varies
AB14
12 48 1.30
10
0.90

28Ø@30c/c 20Ø@20c/c 28Ø@30c/c(AB6)


0.10 20
(AB8) (AB5) +
28Ø@30c/c(AB8) 15 6.4 AB15
20 6 7.1
1705
10th,PCC (1:3:6)
15thick Stone soling 50
0.25
7.00
16 AB16 8 14 0.75
75
ABUTMENT REINFORCCEMENT DETAILS
17 AB17
8 16 0.60
60
Note: Dimensions are in metre.
No. Date Revision Surveyed by Amin Scale Project name:
As shown(A3) Province Badakhshan
Aga Khan Foundation, Afghanistan Mai-e-Mai
Rawand RCC Bridge
1 Structural Design by M. Zia Fazily District
Date
2 Checked by Uma Shankar
National Program Office, Kabul April-2020
Village Rawand Drawing Title:
Central Engineering Department Drawing No. ST-8 Abutment Reinforcement Detail
3 Approved by Bishwo Shrestha Project Code BDK-INF
16Ø@20c/c
(AB11)
1.68

16Ø@20c/c
(AB12)
16Ø10Nos
(AB9)
32Ø@20c/c
25Ø@20c/c
(AB1)
(AB3)
20Ø@20c/c
(AB5)
20Ø@20c/c

8.68
(AB5)
8.68

8.68

5.88
25Ø@10c/c
5.88

(AB3+AB4)
32Ø@10 c/c
(AB1+AB2)
4.18

4.18
28Ø@20c/c
28Ø@20c/c (AB7)
(AB7)

0.90
20Ø@20c/c
(AB5)
20Ø@20c/c 28Ø@30c/c
0.90

(AB5) (AB8)
28Ø@15c/c 5.00
(AB8+AB6)
Back view
5.00
Front view
Note: Dimensions are in metre.
No. Date Revision Surveyed by Amin Scale Project name:
As shown(A3) Province Badakhshan
Aga Khan Foundation, Afghanistan Rawand RCC Bridge
1 Structural Design by M. Zia Fazily District Mai-e-Mai
National Program Office, Kabul Date April-2020
Drawing Title:
2 Checked by Uma Shankar Village Rawand
Central Engineering Department Drawing No. Abutment Reinforcement Detail
3 Approved by Bishwo Shrestha ST-9 Project Code BDK-INF
360 360 360 360 360
12Ø-4 LEGGED STIRRUPS AT 5 Nos. 12 Ø FACE BARS 4 Nos. 25 Ø TOP BARS - (G5) 12Ø-4 LEGGED STIRRUPS AT 12Ø-4 LEGGED STIRRUPS AT 4 Nos. 25 Ø TOP BARS - (G5) 5 Nos. 12 Ø FACE BARS 12Ø-4 LEGGED STIRRUPS AT
EACH ON BOTH FACES-(G7) EACH ON BOTH FACES-(G7)
15 c/c (G8) 20 c/c (G8) 20 c/c (G8) 15 c/c (G8)
P Q R R Q P
35 360 360 360 360 360 35
750
22

22

130
94
160

14
3 Nos.32Ø-(G4) 3 Nos.32Ø-(G4)
2 Nos.32Ø-(G3) 2 Nos.32Ø-(G3)
2 Nos.32Ø-(G2)
44

8 Nos.32Ø-(G1 ) 10 Nos. 32Ø Bottom bars. 12Nos. 32Ø Bottom bars. 13 Nos. 32Ø Bottom bars. 15 Nos. 32Ø Bottom 40m bars.
(G1 & G2) (G1,G2, & G3)
(G1,G2,G3 & G4) (G1,G2,G3 & G4)
900
1400
1800
LONGITUDINAL SECTION OF MAIN GIRDER
4 Nos. 25 Ø TOP BARS - (G5) 4 Nos. 25 Ø TOP BARS - (G5) 4 Nos. 25 Ø TOP BARS - (G5)
G5 G5 G5 G5 G5 G5 G5 G5 G5 G5 G5 G5
22

22

22
G6 G6 G6 G6 G6 G6
20

20

20
20 20 20
G6 G6 G6 G6 G6 G6
5 Nos. 12 Ø FACE BARS 5 Nos. 12 Ø FACE BARS 5 Nos. 12 Ø FACE BARS
EACH ON BOTH FACES-(G6) EACH ON BOTH FACES-(G6) EACH ON BOTH FACES-(G6)
G6 G6 G6 G6 G6 G6
160

160

160
12 Ø 4 LEGGED STIRRUPS AT 15 c/c (G7) 12 Ø 4 LEGGED STIRRUPS AT 15 c/c (G7) 12 Ø 4 LEGGED STIRRUPS AT 20 c
G6 G6 G6 G6 G6 G6
G6 G6 G6 G6 G6 G6
G3 G3 G3 G4 G3
G1 G2 G1 G2 G1 G1 G2 G1 G2 G1 G1 G2 G1 G2 G1
32Ø SPACER BAR @0.50m C/C 32Ø SPACER BAR @0.50m C/C 32Ø SPACER BAR @0.50m C/C
G1 G1 G1 G1 G1
ALTERNATLEY PLACED G1 G1 G1 G1 G1
ALTERNATLEY PLACED G1 G1 G1 G1 G1
ALTERNATLEY PLACED
BETWEEN MAIN BARS (G8) BETWEEN MAIN BARS (G8) BETWEEN MAIN BARS (G8)
40 10 Nos. 32 Ø BOTTOM BARS - (G1& G2) 12 Nos. 32 Ø BOTTOM BARS - (G1,G2 & G3) 15 Nos. 32 Ø BOTTOM BARS - (G1,G2
40 40
SECTION AT P-P SECTION AT Q-Q SECTION AT R-R
CROSS-SECTION OF MAIN GIRDER Note: Dimensions in cm
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Drawing No. ST-10 Longitudinal & Cross-Section of Main Girder
3 Approved by Bishwo Shrestha Project Code BDK-INF
3 2.5 7.7 1.3 14.9 2.5 5.2 2.5 3
G5 G5 G5 G5
22

G6 G6
20

20

20
20
G6 G6
BAR BENDING SCHEDULE OF MAIN GIRDER (PER GIRDER)
S.N. SHAPE LABEL DIA. NOS. LENGTH
(mm) (m)
100 1860 100
G6 1 G1 32 8 22.60
G6 200 x 1
2 1860
50 50 G2 32 2
160

200 x 1 21.60
(G7)
3 50 1400
50 G3 32 2
200 x 1 17
G6 G6 4 50 900 50 G4 32 3 10.0
150 x 1
5 30 1860 30 G5 25 4 20.07
1860
G6 12 10
6 30
70 x 1 30 19.90
10
G6 G6 10
G7
7 12 114 4.16

154
154
12 114 3.88
34 20
8 34 G8 32 76 0.34
G3 G4 G4 G4 G3

3 3.2 3.2 3.23.2 3.2


G1 G2 G1 G2 G1
G1 G1 G1 G1 G1
3 3.2 4.5 3.2 4.5 3.2 4.5 3.2 4.5 3.2 3
40
GENERAL SECTION AT S-S
Note: Dimensions in cm
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Drawing No. ST-11 Detail Main Girder
3 Approved by Bishwo Shrestha Project Code BDK-INF
500
60 380 60
8 8 45 380 45 8 8
Steel I Beam10 Steel I Beam10
132

132

4 Nos. 12 Ø face bars each on both face-(CG3)


2-25Ø compression bar(CG2)
7

Weary Core 7cm Thk


35

35

BAR BENDING SCHEDULE OF CROSS GIRDER


22

(Per Girder & Middle)


19

S.N. SHAPE LABEL DIA. NOS. LENGTH


(mm) (m)
120
160

75 75
1 314 CG1 28 3 4.64
2 50 314 50 CG2 25 2 4.14
3-28 Ø bars(CG1)
10Ø @ 15 c/c double legged strriups (CG4)
40
280
40 3 25 314 25 CG3 12 8 3.64
20
LONGITUDINAL SECTION OF CROSS GIRDER 10
4 CG4 10 24 2.50

95
5 20 20
60 CG5 12 16 1.6
2-25Ø compression bar(CG2) 2-25Ø compression bar(CG2)
CG2 CG2 CG2 CG2
22

BAR BENDING SCHEDULE OF CROSS GIRDER


(Per Girder & Corner)
15

15
CG3 CG3 CG3 CG3 S.N. SHAPE LABEL DIA. NOS. LENGTH
(mm) (m)
15 15
12 Ø bars @150 c/c-(CG6) 12 Ø bars @15 c/c-(CG5) 75 75
CG3 CG3 CG3 CG3
1 314 CG1 28 3 4.64
114

4 Nos. 12 Ø face bars each on both face-(CG3) 4 Nos. 12 Ø face bars each on both face-(CG3)
98

CG3 CG3
2 50 314 50 CG2 25 2 4.14
CG3 CG3
160

10Ø @ 15 c/c double legged strriups (CG4) 10Ø @ 15 c/c double legged strriups (CG4)
3 25 314 25 CG3 12 6 3.64
CG3 CG3 CG3 CG3
20
10
4 CG4 10 22 2.50
CG1 CG1 CG1 CG1 CG1 CG1

95
24
3-28 Ø bars(CG1) 3-28 Ø bars(CG1)
20
CROSS GIDER-I CROSS GIDER-II 5
73
40

CG6 12 16 1.13
20
23 30 330 30
38 360
CROSS-SECTION OF CROSS GIRDER
Note: Dimensions in cm
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Drawing No. ST-12 Detail of Cross Girder
3 Approved by Bishwo Shrestha Project Code BDK-INF
500
60 380 60
8 8 45 45 8 8
Steel I Beam10 Steel I Beam10

132
12 Ø 2 LEGGED STIRRUPS AT 20 c/c (S9) 12 Ø 2 LEGGED STIRRUPS AT 20 c/c (S9)
240
6-Nos.10 Ø Bars (S7) 6-Nos.10 Ø Bars (S7)
12 Ø Bars @20c/c (S6) 7Thk,RCC wearing coat 12 Ø Bars @20c/c (S6)
(Ø8@20c/c S10 & S11 Both Sides)
12 Ø Bars @20c/c (S1)
43 43
18

22
35

35
17
19

19
12 Ø Bars @20c/c (S8)
12 Ø Bars @10c/c (S5)
12 Ø Bars @20c/c (S8) 12 Ø Bars @20c/c (S3) 12 Ø Bars @20c/c (S2) 12 Ø Bars @20c/c (S4)
12 Ø Bars @20c/c (S4)
106 55 55 66
380
40 40
110 280 110
X-SECTION DETAIL OF DECK SLAB
Note: Dimensions in cm
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Drawing No. ST-13 Detail Deck Slab
3 Approved by Bishwo Shrestha Project Code BDK-INF
60
8 8 45
Steel I Beam10
BAR BENDING SCHEDULE OF DECK SLAB (PER SLAB)
DIA. NOS. LENGTH
S.N SHAPE LABEL
(mm) (m)
12 Ø 2 LEGGED STIRRUPS AT 20 c/c (S9) 480
1 8 8 S1 12 95 4.96
6-Nos.10 Ø Bars (S7) 110 110
2 8 8
20 20 S2 12 95 4.46
12 Ø Bars @20c/c (S6) 170
380
12 Ø Bars @20c/c (S1) 3 8 8 S3 12 95 3.96
43
18

22

8
20
4 S4 12 190 2.08
35

130
50
17

1870 S5 12 84 19.56
5 8 8
70 x1
19

55
6 8 S6 12 190 1.43
25
55
12 Ø Bars @20c/c (S8) 12 Ø Bars @20c/c (S3) 1870
8 S7 10 12 19.56
7 8
70 x1
12 Ø Bars @20c/c (S4)
106 55 8 8
1870
8 S8 12 20
19.56
70 x1
9 52
10 S9
12 198 1.54

15
10 1860 S10 8 20 19.10
5 40 x1 5
380 S11 3.9
11 5 5 8 99
40
Note: Dimensions in cm
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Drawing No. ST-14 Detail of Deck Slab
3 Approved by Bishwo Shrestha Project Code BDK-INF
Steel I Beam10 Typical (Orange Color) 8cm dia G.I Pipe Typical (Orange Color)
1800
7 7 7 7 7 7 7 7 7 7 7 7 7
147 147 147 147 147 147 147 147 147 147 147 147
132

Guard Rail Elevation


1800
35 360 360 360 360 360 35
7 7 7 7 7 7 7 7 7 7 7 7 7
147 147 147 147 147 147 147 147 147 147 147 147
40 30 30 30

30
60
40

30 330 30 330 30 330 30 330 30 330 30


Main Girders
240

240

Cross Girders
500
30 30 30 40

40
60
30
Guard Rail Plan
Note: Dimensions in cm
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Designed by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Drawing No. ST-15 Guard Rail
3 Approved by Bishwo Shrestha Project Code BDK-INF
35.0
60.0
90.0
25.0
100.0

42.5
See Detail "A" Bearing Stopper

110.0

40.0
10.0 25.0 10.0

50.0
See Detail "B"
Elastrometric Bearing
Bearing Plinth 50x25x5.5
C C

62.0

280.0
500.0
Elastometric Bearing
RCC Cap
45.0 Elastrometric Bearing
(500x120x6)mm 50x25x5.5
< (60X60X6)mm Detail "B"

50.0
Weld
Elastometric Bearing with Steel Plates
Ø12@50c/c (55mm thick) Bearing Stopper

110.0
Bearing Plinth (1:2, 25mm thick)
Section C-C
Detail "A"
Note: Dimensions in cm
No. Date Revision Project name:
Surveyed by Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
1 Structural Design by M. Zia Fazily District
Rawand RCC Bridge
National Program Office, Kabul Date April-2020
Mai-e-Mai
Drawing Title:
2 Checked by Uma Shankar
Central Engineering Department Village Rawand
Drawing No. ST-16 Bearing Detail
3 Approved by Bishwo Shrestha Project Code BDK-INF
B
Ø12@15c/c Ø10@20c/c Ø10@20c/c Ø12@15c/c
500 (AS2) (AS1) (AS1) (AS2)
250 250

20
Ø10@20c/c Ø10@20c/c
(AS1) (AS1)
249 249
A A Section A- A RCC Detail
2.5mm Joint Ø10@20c/c
Ø12@15c/c 6Ø12
(AS1)
370

(AS2) (AS3)
35

35
Ø8@15c/c
(AS4)
50 50 20 330 20
Section B-B RCC Detail
60

60

Ø8@15 c/c
Approach Slab Plan (AS5)
Ø8@15 c/c
(AS6
B

7
Stone masonry Stone masonry
impact block impact block
(60cm x50cm x (60cm x50cm x
380
100cm) 100cm) RCC Covering Coat RCC Detail
500
250 2.5mm Joint 250
Slope Slope

20
(20cm) RCC (1:1.5:3)
25cm Th, Coarse Aggregate Sub- Base Section A- A
(Selective Back filling Material)
Compacted Earth
Note: Dimensions in cm
No. Date Revision Surveyed by Amin Scale Project name:
As shown(A3) Province Badakhshan
Aga Khan Foundation, Afghanistan Rawand RCC Bridge
1 Structural Design by M. Zia Fazily District Mai-e-Mai
National Program Office, Kabul Date April-2020
Drawing Title:
2 Checked by Uma Shankar Village Rawand RCC Approach Slab
Central Engineering Department Drawing No. ST-17 Plan & Details
3 Approved by Bishwo Shrestha Project Code BDK-INF
50
X 6 Ø STIRRUPS @200 C/C ST8

60
(ST3,ST4,ST5,ST6,ST7&ST9)
10 30 20 Ø @200C/C(ST2)
6 Ø STIRRUPS @100 C/C Plan of Stone manosary
20 Ø @200 C/C (ST1) Impact Block
(ST3,ST4,ST5,ST6,ST7 & ST8)
40

40
20 Ø @200 C/C (ST2)
50
20

10cm thick PCC (1:2:4)


40 90 Stone Masonry

100
SECTION AT X-X (STOPPER)
DETAIL OF STOPPER
Section of Stone
manosary Impact Block
Note: Dimensions in cm
No. Date Revision Surveyed by Project name:
Amin
Aga Khan Foundation, Afghanistan Scale As shown(A3) Province Badakhshan
Rawand RCC Bridge
1 Structural Design by M. Zia Fazily District Mai-e-Mai
National Program Office, Kabul Date April-2020
Drawing Title:
Checked by Uma Shankar Village
2
Central Engineering Department Rawand
Detail and Section of Stopper
Approved by Drawing No. ST-18 Project Code
3 Bishwo Shrestha BDK-INF

You might also like