You are on page 1of 2

1.50 m To 2.00 m 9.00 m 1.50 m To 2.

00 m

Proposed Hard Shoulder 200 mm tk Proposed Bituminous concrete 40 mm Tk Proposed 50 mm Tk DBM


2.50% 2.50%
3% 3% Proposed Hard Shoulder 200 mm tk
Existing bituminous 150 mm (av)
Existing WMM/WBM Layer (250 mm av)
Existing Base Course 433.00 mm (av)
Existing Sub Base Course

FROM CHAINAGE 0.00 KMP TO 27.00 KMP

TYPICAL CROSS-SECTION OF PROPOSED STAGE STRENGTHENING OF THE EXISTING PAVEMENT


FROM 0.00 KMP TO 49.00 KMP OF NH- 2B UNDER N. H DIVISION NO:-III OF N.H.C.-II DURING THE
YEAR 2019-20 IN THE DISTRICT OF PURBA BARDHAMAN & BIRBHUM ,WEST BENGAL .
1.50 m To 2.00 m 7.00 m 1.50 m To 2.00 m

Proposed Hard Shoulder 200 mm tk Proposed Bituminous concrete 40 mm Tk Proposed 50 mm Tk DBM


2.50% 2.50%
3% 3% Proposed Hard Shoulder 200 mm tk
Existing bituminous 150 mm (av)
Existing WMM/WBM Layer 250 mm (av)
Existing Base Course 433.00 mm (av)
Existing Sub Base Course

FROM CHAINAGE 27.00 KMP TO 49.00 KMP

TYPICAL CROSS-SECTION OF PROPOSED STAGE STRENGTHENING OF THE EXISTING PAVEMENT


FROM 0.00 KMP TO 49.00 KMP OF NH- 2B UNDER N. H DIVISION NO:-III OF N.H.C.-II DURING THE
YEAR 2019-20 IN THE DISTRICT OF PURBA BARDHAMAN & BIRBHUM ,WEST BENGAL .