Y to B+R+E OK
B to R+Y+E OK
LEAKAGE
TEST POINT APP VOLTAGE DURATION REMARKS
CURRENT (mA)
R& Y+B+E 40.0 kV 1 min 24.0 WITHSTOOD
Y& R+B+E 40.0 kV 1 min 24.0 WITHSTOOD
B& Y+R+E 40.0 kV 1 min 24.0 WITHSTOOD
4. REMARKS:--
Description of Test
Serial Number Calibration Due Date
Equipment
AC HV TEST KIT 1110 11.10.2018
INSULATION TESTER 101574096 05.03.2019