Professional Documents
Culture Documents
Design strength (iv) Theoretical Pour Volume (Viii) Panel Built up / Meter
Discharge Time Concrete Volume Pour Level from GW top Tremie pipe - 1 Tremie pipe - 2
Length of Length of
Delivery Slump Temp. in Length from Tremie pipe Tremie in Length from Tremie pipe Tremie in Test
Ticket No. Batch time Start Finish (mm) 0
C Load (m3) Total(m3) Theoretical Actual GW top removed (m) concrete (m) GW top removed (m) concrete (m) Cube Ref. Remark
(A) (B) (C) (D) (E) (F) (G) (H) (I) = (ii)-(H / viii) (J) (K) (L) (M) = (K-J) (N) (O) (P) = (N-J) (Q) (R )
Remarks