Background:
- There are total 16 parts, 09 parts Pre-MPT samples are dispatched by Air from OTC on 31-July 2019.
- Remaining 07 parts Pre-MPT samples status is as below;

Try-out Status Pre- MPT Sample Making


Go ahead
for Pre-MPT ASC / IMC
S# Part no. 05 nos. IMC Activity summary
1st Assy 2nd Assy 3rd Assy sample ETD Judgment
Making Sample SDS Packing Target
Try-out Try-Out Try-Out by Air
making ETD

1 61203 - 01 Sample (61203-04) produced


26-07-19 30-07-19 31-08-19 - Part checked by TDEM / ASC / IMC
2-Aug 3-Aug 4-Aug 6-Aug 7-Aug Satisfactory
X X O - Go ahead given to OTC to make 05 pre-MPT samples
2 61204

- 01 Sample (57605) produced


29-07-19 02-08-19 Subject to
- 01 main part 57652 die under improvement (outsoure)
3 57605 - - Try-out 3-Aug 4-Aug 5-Aug 6-Aug 7-Aug Satisfactory
X result
- Nature on die improvement is not complex
- MIKOMI results not achieved ( further improvement req.)

4 61023 - Dies are under improvement (2 main parts - low tensile )


Subject to
01-08-19 6-08-19 - 61121-22 - Try out done, part accuracy not achieved
- Try-out 7-Aug 8-Aug 9-Aug 10-Aug 7-Aug Critical
- - - Nature of die improvement is complex
result - Assy.Try-out not done
5 61024

6 61037 - Dies are under improvement (4 Main parts - high tensile)


27-08-19 6-08-19 Subject to - 61321 _22, 61371_81 Tryout done, part accuracy not achieved
Highly
- Try-out 7-Aug 8-Aug 9-Aug 10-Aug 10-Aug - Nature of die improvment is complex
X - result
critical
- 1st Assy. Try-out - Required MIKOMI result not achieved
7 61038 - 2nd Assy. Try-out - Planned on 07-08-2019