JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
EL
S
Refer to engineering drawing or the as- built documents of
EC
the
1. Allwork area to have completed the site specific
prsonnel
induction.
Site Survey of area Site Evaluation for the
for the conduit pipe work area. Evaluate the Occupational Site Hazards and Lay Bodily Injury, 2. precise coordination
1
installation possible hazard and risks Health & Safety out fracture, disability A
at the work area.
3. Ensure that
workers are educate on spotting potential hazards.
Personnel to wear mandatory PPE's on site such as but not
PPE limited to hardhat, safety glass, safety shoes,
earplug/earmuff.
EL
S
Preparation of EC
Prepare necessary Misccommunication
2 Documents or documents (pen and Operational with Project Enduser Delay of Permit to 1. Coordinate the activity to the Enduser and Project owner
Permit to Work papers) and Project Owner Work (PTW) before commencing work.
(PTW). A 2. ensure all necessary and supporting
documents
PPE
EL 1. Check Vehicle of its road worthiness.
S
2. comply with plant road speed
EC limits and driving regulations.
Occupational Hit againts personnel bodily injuries,
prepare tools, equipment Health & Safety or property property damage 3.
and materials to be used A banksman or spotter shall be provided during loading,
for installing conduit pipe unloading, moving operation.
Preparation and (conduit pipe, unit strut Personnel to wear mandatory PPE's on site such as but not
mobilization of PPE limited to hardhat, safety glass, safety shoes,
3 tools, equipment channel, unit strut clamp,
portable electric drill, earplug/earmuff.
and materials. 1. Keep access and egress routes clear and segregate the
combination wrench, work area from others and vehicles in access areas.
adjustable wrench, box EL 2. remove any items
wrench) that may obstruct the work activty; and
S
Occupational Slips, trips and falls at cuts, bruises, sprains
Health & Safety the same level and strains EC
1. Check for any items that may cause slips, trips and falls
A
and remove or secure them as required.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
EL
S
EC
1. Ensure all workers abide to the traffic rules and
regulations in the plant.
Mobilization of manpower
4 Mobilization of to the work area for the Occupational Hit by moving Bodily injury/Fatality A 2. Ensure workers use the
Manpower installation of conduit Pipe Health & Safety machinery pedestrian walkway provided during travelling.
and its support
3.Be
extra carefull
Personnel whenmandatory
to wear crossing the roadon site such as but not
PPE's
limited to hardhat, safety glass, safety shoes,
PPE earplug/earmuff.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
EL
S 1. Educate worker on proper hand placement
EC
EC Make sure all access and egress, access ladders, steps and
ramps are safe and secure.
1. All personnel to have read and understood the RA that is
Poor access and Bodily Injury specific for their area of work.
egress A
2. RA is to be modified where and
when necessary to reflect the changing work area.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
EL
S 1. only used equipment with guards and auxiliary handles in 1. fabricate conduit support at
place workshop to prevent and eliminate fire
hazard in the work area.
S
1. earthing installation on welding equipment should always be
checked.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
7 Fabricate Conduit Fabsicate Conmduit Occupational
Supports supports Health & Safety
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
EL
S
1. Complete edge protection to working flatform
2. safe access and
EC egress from the scaffold must be provided
3. Install independent
lifeline
1. Secure supporting PTW for working at heights
4. ensure
3 point of contact while descending and ascending on
scaffold ladder and working flatform.
5. Make sure all workers stayfully
Installation of conduit within the scaffold
1. personnel at all
to wear times.full body harness with double
suitable
supports prior for PPE lanyards and shock absorber.
Installation of installation of conduit pipe
8 conduit supports EL
and hanger (beam clamp, strut clamp,
strut channel) drilling or S
welded
1. All Raising and lowering of materials to be carried out in
controlled manner (i.e. hand to hand, by light-line, nylone
EC rope and fitting bags.)
2. Provide safety nets if necessary
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Installation of conduit
Installation of supports prior for
installation of conduit pipe
8 conduit supports
and hanger (beam clamp, strut clamp,
strut channel) drilling or
welded
Bodiliy injury,
Company Occupational INSTRUMENTATION AND disability,
CONTROLfatality,
SPECIALIST INC. Document ID No. JSEA-ICS-002
Health & Safety Fall of materials property or
Department/s CONTRACTOR Revision No REV.4
equipment damage
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
EL
S
1. earthing installation on welding equipment should always
be checked.
1. A responsible person
EC 2. provide suitable fire extinguisher should keep the welding
and fire blanket. site under observation for
Occupational atleast an hour after the
Electrical hazard Skin burn completion of work.
Health & Safety 3. provide appropriate ventilation 2. Continous gas monitoring
1. secure secondary permit for hot works activities. at work area
4. Assign
Installation of conduit A competent fire watcher
supports prior for 2. only competent personnel with NCII
Installation of certified can perform the welding works.
9 conduit supports installation of conduit pipe
and hanger (beam clamp, strut clamp, PPE
strut channel) drilling or
welded EL
S
1. Educate worker on proper hand placement
EC
EC
Installation of conduit 1. Educate worker of correct manual lifting method.
supports prior for Assign stanbyman or
Installation and installation of conduit pipe Occupational watchman below at the
10 laying of conduit Ergonomally hazards Bodily injury/ bac k working area to warn others
pipe (beam clamp, strut clamp, Health & Safety pain 2. Advice worker to seek help if the load for unauthorized entry in
strut channel) drilling or A is to heavy/large (Buddy Buddy System) the working area..
welded
3. avoid awkward
position to prevent body pain/back pain.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title Installation of conduit INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Assign
Oct. 18stanbyman
- 24, 2019 or
supports prior for
Installation and installation of conduit pipe Occupational Bodily injury/ bac k watchman below at the
10 laying of conduit (beam clamp, strut clamp, Health & Safety Ergonomally hazards pain working area to warn others
pipe strut channel) drilling or for unauthorized entry in
Risk Procedure / Job Activities/Equipment/Pro Aspect / Hazard / Impact / Risk / the working area..
welded Risk Category Risk Source / HOC Control Measures Action Plan Target Date
Item Steps ducts or Services Threat
Vulnerability
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
EL
S
1. All Raising and lowering of materials to be carried out in
controlled manner (i.e. hand to hand, by light-line, nylone
EC rope and fitting bags.)
2. Provide safety nets if necessary
Installation of conduit
supports prior for 2. Only the material being used for
Installation and installation of conduit pipe Occupational Hit by falling Bodily injury/ fatality/ cable tray installation is to be lift up.
laying of conduit (beam clamp, strut clamp, Health & Safety materials damage to property
pipe strut channel) drilling or 3. materials to
welded A be stored in a safe and secure manner, to prevent them
accidentally falling or being knocked off the working
platform when at height.
4. Ensure close monitoring and
supervision.
5. ensure
buddy system when lifting 3 meters and above to prevent
struck/striking injury.
1. personnel to wear suitable full body harness with double
PPE lanyards and shock absorber.
EL
1. Complete edge protection to working flatform
S
2. safe
EC access
1. andsupporting
Secure egress from thefor
PTW scaffold must
working be provided
at heights
4. ensure 3
point of contact while descending and ascending on scaffold
ladder and working flatform.
1. personnel to wear suitable full body harness with double 5.
PPE Make sure allshock
workers stayfully within the scaffold at all
lanyards and absorber.
times.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-002
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CONDUIT PIPE AND ITS SUPPORTS Effective Date Oct. 18 - 24, 2019
Housekeeping
12 before, During and Housekeeping before, Occupational Slips, trips and falls at Slips, trips and falls at S
During and after (5's) Health & Safety the same level the same level
after (5's) EC
1. Make sure the work area is left clean and tidy
A
2. Check for any items that may cause
slips, trips and falls and remove or secure them as required.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019