Professional Documents
Culture Documents
JSEA-ICS-006
Department/s Contractor Revision No 4
Job Title Lifting Works Effective Date November 8-14, 2019
Risk Procedure / Job Steps Activities/Equipment/Produ Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
Item cts or Services Source / Vulnerability
EL
S
Prepare necessary documents such as as-built drawing of
EC specific location.
Site Evaluation for the work 1. All prsonnel to have completed the site specific induction.
Site Survey of area area. Evaluate the possible Occupational
1 location for Lifting Site hazard and lay out bodily injury/disability 2. precise
hazard and risks at the work Health & Safety coordination 3.
works area. Ensure that workers are educate on spotting potential hazards.
A
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Preparation and Prepare tools, equipment
Mobilization of tools, and materials to be used for JSEA-ICS-006
Company
3 equipment and lifting activities (Crane, Instrumentation & Control Specialist ,Inc. Document ID No.
materials for lifting
Department/s boomtruck, hoist, lifting Contractor Revision No 4
activities. sling, shackles).
Job Title Lifting Works Effective Date November 8-14, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialist ,Inc. Document ID No. JSEA-ICS-006
Department/s Contractor Revision No 4
Job Title Lifting Works Effective Date November 8-14, 2019
Risk Procedure / Job Steps Activities/Equipment/Produ Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
Item cts or Services Source / Vulnerability
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialist ,Inc. Document ID No. JSEA-ICS-006
Department/s Contractor Revision No 4
Job Title Lifting Works Effective Date November 8-14, 2019
Risk Procedure / Job Steps Activities/Equipment/Produ Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
Item cts or Services Source / Vulnerability
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialist ,Inc. Document ID No. JSEA-ICS-006
Department/s Contractor Revision No 4
Job Title Lifting Works Effective Date November 8-14, 2019
Risk Procedure / Job Steps Activities/Equipment/Produ Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
Item cts or Services Source / Vulnerability
EL
S
1. Tagline must be used to control the load and avoid hitting any
plant facility, equipment and personnel.
2. Always follow load chart for lifting any load.
3. do not lift load when wind
speed exceeds 25 knots. (use anomometer if necessary)
EC
Evaluate the load and Suspended load drop 1. Cordon off the lifting zone to prevent entry of unauthorized
Lifting Works performing the lift (crane or Occupational and hit onto Property Damage,
personnel. 2. Operator, rigger
boom truck). Health & Safety personnel/ structure. Fatality
and signalman should work to the standard hand signals.
3. Check the maximum load of the
crane and calculate the weight of lifting and hoisting to avoid
overload. 4. Check the swing radius of
the crane and ensure that unobstructed by any facility.
5. Precise supervision
A
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialist ,Inc. Document ID No. JSEA-ICS-006
Department/s Contractor Revision No 4
Job Title Lifting Works Effective Date November 8-14, 2019
Risk Procedure / Job Steps Activities/Equipment/Produ Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
Item cts or Services Source / Vulnerability
Housekeeping before, Housekeeping before, During Occupational Slips, trips and falls at Physical Injuries to 1. Make sure the work area is left clean and tidy
7 2. Check for any items that may cause
During and after (5's) and after (5's) Health & Safety the same level workers
A slips, trips and falls and remove or secure them as required.
Personnel to wear mandatory PPE's on site such as but not
limited to hardhat, safety glass, safety shoes, earplug/earmuff.
PPE
Prepared by / Date: Checked by / Date: Approved by / Date:
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialist ,Inc. Document ID No. JSEA-ICS-006
Department/s Contractor Revision No 4
Job Title Lifting Works Effective Date November 8-14, 2019
Risk Procedure / Job Steps Activities/Equipment/Produ Risk Category Aspect / Hazard / Risk Impact / Risk / Threat HOC Control Measures Action Plan Target Date
Item cts or Services Source / Vulnerability
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019