JSEA-ICS-003
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CABLE TRAY & CABLE SHAFT AND ITS SUPPORTS UNIT 1 REHAB Effective Date November 8-14, 2019
Aspect / Hazard /
Risk Procedure / Job Activities/Equipment/Pro Risk Category Impact / Risk / HOC Control Measures Action Plan Target Date
Risk Source /
Item Steps ducts or Services Threat
Vulnerability
EL
S
Refer to engineering drawing or the as- built documents of the
EC work area
1. All prsonnel to have completed the site specific induction.
Site Evaluation for the work
Site Survey of area for area. Evaluate the possible Occupational Site Hazards and Lay Bodily Injury, fracture,
1 the conduit pipe hazard and risks at the work Health & Safety out disability 2. precise coordination
installation A
area.
3. Ensure that workers are educate on spotting potential
hazards.
PPE Personnel to wear mandatory PPE's on site such as but not limited
to hardhat, safety glass, safety shoes, earplug/earmuff.
EL
S
Preparation of Prepare necessary Misccommunication Delay of Permit to EC
2 Documents or Permit documents (pen and papers) Operational with Project Enduser Work (PTW)
to Work (PTW). and Project Owner 1. Coordinate the activity to the Enduser and Project owner
A before commencing work.
2. ensure all necessary and supporting documents
EL
S 1. Check Vehicle of its road worthiness.
prepare tools, equipment
and materials to be used for
Preparation and installing conduit pipe 2. comply with plant road speed limits and driving
(conduit pipe, unit strut Occupational EC regulations.
mobilization of tools, Hit againts personnel or bodily injuries, property
3 equipment and channel, unit strut clamp, Health & Safety property damage
materials. portable electric drill, 3. banksman or spotter shall be provided
combination wrench, during loading, unloading, moving operation.
adjustable wrench, box A
wrench)
Personnel to wear mandatory PPE's on site such as but not limited
PPE to hardhat, safety glass, safety shoes, earplug/earmuff.
1. Keep access and egress routes clear and segregate the work
EL area from others and vehicles in access areas.
2.
remove any items that may obstruct the work activty.
Occupational Slips, trips and falls at cuts, bruises, sprains
Health & Safety the same level and strains S
EC
1. Check for any items that may cause slips, trips and falls and
A remove or secure them as required.
PPE Use Suitable foot wear
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-003
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CABLE TRAY & CABLE SHAFT AND ITS SUPPORTS UNIT 1 REHAB Effective Date November 8-14, 2019
Aspect / Hazard /
Risk Procedure / Job Activities/Equipment/Pro Risk Category Impact / Risk / HOC Control Measures Action Plan Target Date
Risk Source /
Item Steps ducts or Services Threat
Vulnerability
S
Occupational bodily injury/back EC
Health & Safety Ergonomically hazard injury/Hand injury
1. Educate worker of correct manual lifting method.
A
2. Advice worker to seek help if the load is to
heavy/large (Buddy Buddy System)
PPE Wear Safety Gloves
Manual Loading and Loading and unloading of 1. Keep access and egress routes clear and segregate the work
5 unloading of conduit materials and other conduit area from others and vehicles in access areas.
pipe materials accessories. 2.
remove any items that may obstruct the work activty; and
EL
3. Check for any items that may cause slips, trips and falls and
remove or secure them as required.
Occupational Tripping and Slipping Bodily Injury, fracture,
Health & Safety hazard disability 4. Maintain good housekeeping at work area.
S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-003
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CABLE TRAY & CABLE SHAFT AND ITS SUPPORTS UNIT 1 REHAB Effective Date November 8-14, 2019
Aspect / Hazard /
Risk Procedure / Job Activities/Equipment/Pro Risk Category Impact / Risk / HOC Control Measures Action Plan Target Date
Risk Source /
Item Steps ducts or Services Threat
Vulnerability
EL
S
EC 1. Educate worker on proper hand placement
A 1. Check for any items that may cause slips, trips and falls and
remove or secure them as required.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-003
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CABLE TRAY & CABLE SHAFT AND ITS SUPPORTS UNIT 1 REHAB Effective Date November 8-14, 2019
Aspect / Hazard /
Risk Procedure / Job Activities/Equipment/Pro Risk Category Impact / Risk / HOC Control Measures Action Plan Target Date
Risk Source /
Item Steps ducts or Services Threat
Vulnerability
EL
S
1. only used equipment with guards and auxiliary handles in place
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-003
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CABLE TRAY & CABLE SHAFT AND ITS SUPPORTS UNIT 1 REHAB Effective Date November 8-14, 2019
Aspect / Hazard /
Risk Procedure / Job Activities/Equipment/Pro Risk Category Impact / Risk / HOC Control Measures Action Plan Target Date
Risk Source /
Item Steps ducts or Services Threat
Vulnerability
EL
S
1. Complete edge protection to working flatform
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-003
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CABLE TRAY & CABLE SHAFT AND ITS SUPPORTS UNIT 1 REHAB Effective Date November 8-14, 2019
Aspect / Hazard /
Risk Procedure / Job Activities/Equipment/Pro Risk Category Impact / Risk / HOC Control Measures Action Plan Target Date
Risk Source /
Item Steps ducts or Services Threat
Vulnerability
EL
S
1. Educate worker on proper hand placement
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-003
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CABLE TRAY & CABLE SHAFT AND ITS SUPPORTS UNIT 1 REHAB Effective Date November 8-14, 2019
Aspect / Hazard /
Risk Procedure / Job Activities/Equipment/Pro Risk Category Impact / Risk / HOC Control Measures Action Plan Target Date
Risk Source /
Item Steps ducts or Services Threat
Vulnerability
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company INSTRUMENTATION AND CONTROL SPECIALIST INC. Document ID No. JSEA-ICS-003
Department/s CONTRACTOR Revision No REV.4
Job Title INSTALLATION OF CABLE TRAY & CABLE SHAFT AND ITS SUPPORTS UNIT 1 REHAB Effective Date November 8-14, 2019
Aspect / Hazard /
Risk Procedure / Job Activities/Equipment/Pro Risk Category Impact / Risk / HOC Control Measures Action Plan Target Date
Risk Source /
Item Steps ducts or Services Threat
Vulnerability
S
1. only used equipment with guards and auxiliary handles in place 1. ensure that when changing
drill bits, grinding or cutting
discs or adjusting the grinder
2. Used Ground Fault Circuit Interrupter. guard that the power is
EC disconnected (i.e., plug is
disconnected from the power
3. assign competent firewatcher and source). 2.
Modification/Rectifica Drilling cable tray and Occupational Live wire laying on the provide fire extinguisher Prior to grinding or drilling
11 tion of cable tray brackets, grinding/welding of Health & Safety cable tray fatality works, ensure that the piece to
cable tray 1.Put pvc pipe on the mv cable to prevent laceration on the
cable.2.competent person will do the activity.3.provide fire be worked is secured and the
A blanket and fire watcher while doing hotworks.4.close off-cut supported using clamps
supervisionof the p.e and safety in charge or having another person
assist by holding the piece
being worked so that grinder,
drill can be operated
usingboth hands.
PPE wear appropriate PPE's for hot works
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019