Preparation of Miscommunication with 1. Coordinate the activity to the Project Enduser and Project Owner
1 Documents or Permit to Prepare necessary document Operational the Project Enduser and Delay to schedule and
before commencing.
such as associated permits work activity.
Work (PTW) Project Owner 2. Follow Schedule and arrange the required
A
document to avoid any cause of delaay.
3. Refer to gant chart as the
reference for preparing PTW.
PPE
EL
S
EC
PPE
1. (Practice Good Housekeeping) Remove unnecessary materials that
EL may cause trip, slip.
S
Site Survey of the area EC
2 for the relocation of the Site evaluation for the work
area. Evaluate the possible Occupational Health physical injury to workers Sprain and strain
Turbine Generator & Safety due to tripping hazard 1. Make sure the work area is left clean and tidy.
Control Panel hazard and Risks. 2. check all the potential cause of trip and
A slip and remove it in the work area.
3.materials to be stored in a safe and
secure manner
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
1. remove any items that may obstruct the work activity. Keep the
EL working area, platform clear of debris or liquid spills.
S
EC
Occupational Health Physical injury to workers
& Safety due to slipping hazard Sprain and strain
1.Cordon the area an d keep sign to warn others of the potentil hazard.
A 2.ensure close monitoring and supervision
3.materials to be stored in a safe and secure manner
EL
S
1. Refer to gant chart or project schedule as the reference prior work
EC commencing.
1. Ensure proper coordination and communication with other
Parallel or simultaneous contractor to avoid parrallel/simoltanueous activities. 2.
Occupational Health activity of other May result in exposing
workers and or potential Supervisors and Safety Officers to ensure precise and close supervision
& Safety trades/contractor in the to all activities.
work area. to harm and danger. A 3. Supervisor shall conduct talks about nature of works and associated
potentil hazards and their essential precautionary measure.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
EL
S
Mobilization of Mobilization of manpower to Occupational Health 1. Ensure all workers abide to the traffic rules and regulations in the
4 Hit by moving macheniry Fatality
manpower work area by means of walking & Safety plant.
A 2. Ensure workers use the pedestrian walkway provided during
travelling.
3. Be extra careful when crossing the road
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
1. Bring only what you need and don’t bring unnecessary tools.
Mobilization of manpower to Occupational Health 2. Identify other possible causes of slip, trip, area such as pressence of
Slip and Trip fractures
work area by means of walking & Safety protudring rebars wet floor, and others.
A 3. Every flatform shall be kept free from any obstruction, materials, and
rubish.
4. When they become slippery due to nature of work, steps shall be
taken by way of sanding, cleaning or by any other means to roughen the
surface.
EL 1. Make sure all access and egress, access ladders, steps and ramps are
safe and secure.
S
EC
1. All personnel to have read and understood the RA that is specific for
May result in exposing their area of work.
5 Preparation of work area Assess work area; access and Occupational Health poor access and egress workers and or potential 2. RA is to be modified where and when necessary to reflect the
weather condition & Safety
to harm and danger. A changing work area.
3. Supervisor shall conduct talks about nature of
works and associated potential hazards and their essential
precautionary measure.
PPE 1. Personnel to wear mandatory PPE such as but not limited to:
Hardhat, safety Goggles, Safety Shoes, earplug.
EL
S
EC
May result in exposing 1. only authorized personnel are allowed to enter in the work area.
Occupational Health unauthorized entry of workers and or potential
& Safety personnel to harm and danger. A 2.Cordon the area and keep sign to warn others of the
potential hazard.
3.ensure close monitoring and supervision
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Identification and
Job Title Identification and Marking of Turbine Generator Control
peoplePanel Relocation
get electricuted Effective Date Diffent color for tagging will be
6 Marking of cables to be cables to be dismantle using Operational Incorrect labeling used for cable that has power and
dismantled wire tracer and voltage detector during dismantle no power.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
EL
S
1. Refer to list of cables and Circuit breaker to be isolate (LOTOTO).
EC
2. Perform voltage/current checking for all terminated cables and wires
and detached it from each terminal block.
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
EL
S
1. use mechanical equipment to move heavy or large loads, when
EC
possible.
removal of panel and its 1. perform war-up exercises and stretches that will keep your muscles
componets and mounting plate. Occupational
& Safety
Health musculoskeletal injuries strain and sprain strong and flexible before strenuous, repetitive work. 2. get help
(Manual Hnadling) when moving large items or use mechanical equipment when possible.
A 3. bend
your knees and get down close to the load. 4.
establish secure footing before attemting to lift.
5. ensure close monitoring and supervision
PPE
EL
S
EC
PPE Provide PPE's Such as but nt limited to: Safety Hardhat, Safety Goggles,
Safety shoes, Safety Gloves
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
EL
S
EC
1. Electric drill shall be in good running condition
2. Electric drill must be provided with guide stopper,
properly positioned and grip.
3. Only
competent and authorized personnel to perform the activity.
Assemble new mounting
drilling holes on mounting plate Occupational Health 4. Provide adequate monitoring and supervision at the
9 plate and install its for installing panel componets & Safety Twisting of electric drill hand injury
components workplace.
A
5. use right tools for the right job.
6. educate and train personnel for proper
use and handling of power tools.
7. Only use appropriate
power tools that are in good condition and use them in a correct
manner. 8.
Power tools should be inspected and has inspection tag and color
coded.
PPE
EL
S
EC
1. Only competent and authorized personnel to perform the activity.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
EL
S
EC
Occupational Health flying debris created 2. Provide adequate monitoring and supervision at
eye injury the workplace.
& Safety during drilling works
A 3. use right tools for the right job.
4. Hazard awareness training by means
of toolbox talk. 5. Supervision by
foreman/leadman. 6.
Supervision by safety officer
PPE 1. Wear safety goggles, face shield if necessary
EL
1. use mechanical equipment to move heavy or large loads, when
EC possible.
1. perform war-up exercises and stretches that will keep your muscles
Panel and Mounting installation of panel and new Occupational Health manual handling and strong and flexible before strenuous, repetitive work. 2. get help
10 plate installation mounting plate to there new & Safety lifting (ergonomics) back injury when moving large items or use mechanical equipment when possible.
location 3. bend
A your knees and get down close to the load. 4.
establish secure footing before attemting to lift.
5. ensure close monitoring and supervision
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
EL
S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
EL
S
EC
Used of consumables 1. Educate workers on the conservation of resources.
Housekeeping before, during (used dust mask, gloves, generation of solid waste
12 Housekeeping 5's Environmental 2. practice waste segregation and good
and after the activities. caution and danger tape) A housekeeping. 3. observe
and maintain proper handling, storage and disposal of all solid and
hazardous waste.
PPE
EL
S
EC
1. Educate workers on the conservation of resources.
2. practice waste
segregation and good housekeeping.
Environmental accumulated waste generation of solid waste 3. observe and maintain proper handling, storage and disposal
A of all solid and hazardous waste.
4. Cable off-cuts to be placed in a drum or a
suitable container for dispossal.
5. Daily nspection of
foreman/leadman/safety officer
PPE
1. Ensure all material off-cuts and rubbish is removed as they are
EL generated and disposed of in appropriate receptacles.
S
EC
____________________ _______________________
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No.
Department/s Contractors Revision No 1
Job Title Turbine Generator Control Panel Relocation Effective Date
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019