A L2 plan /actual Progress Monitoring - Supply & Services
Sl. Description T-CODE Process Description
No. A. Erection (services) 1 Package Wise Erection ZPSL2_SERVICE Reports can be obtained based Progress Report on input field. Input fields are as 1. Enter name of Project defn. 2. Enter WBS name of service of Pkg. in scheduling side 3. Enter start and end date of month for report sought and execute. 2 Consolidated Erection ZPSREPORT Reports can be obtained based Progress Monitoring - on input field. Input fields are region wise/ vendor any of region wise/ vendor wise/ project wise wise/ project wise /element /element wise erection wise progress report. Print 1. Data can be fetch directly option for TL and for small value substation is also 2. If region wise /more no. of available. Data - choose background job
3 L2 erection schedule ZPSL2R1
Reports can be obtained based approved by CMG/site on input field. Input fields are PESM as Project wise 1. Enter Project defn. Pkg. wise 2. Enter WBS name of Pkg. in scheduling side 3. Select version and execute. 4 Actual erection progress ZPSR_ACTUAL_REPORT Reports can be obtained based data on input field. Input fields are Project wise as Pkg. wise 1. Enter Project defn. 2. Enter WBS name of Pkg. in scheduling side
Module: Project Systems Topic: Project Progress Report Page 1 of 3
Online Resource: http://teams.powergrid.in/erp/ For Feedback/Suggestion/Commnet please mail at: rupantar_support@powergrid.co.in POWER GRID CORPORATION OF INDIA LIMITED ERP DEPARTMENT
3. Select date range (by
default all possible date of progress) and execute. 5 CEA Report ZPS_CEA Reports can be obtained based (exclusively for CMG on input field. Input fields are Deptt.) as 1. Enter name of Region 2. select Transmission line /substation /other & Execute 6 MPT Report ZPS_MPT Reports can be obtained based (exclusively for CMG on input field. Input fields are Deptt.) as 1. Enter name of Region 2. Select date (by default current date) & Execute. 5 Consolidated Project ZPMS Reports can be obtained based Status - all project data on input field. Input fields are status as 1. Enter name of Region 2. Enter Project 3. Enter date (project start date) from where you report sought and execute. B. Supply 1 Package Wise Supply ZPSSUPPLY Reports can be obtained based Progress Report on input field. Input fields are as 1. Enter Project 2. Select WBS Level(if search required on basis of WBS level) 3. Select WBS (if WBS level query required) 4. Select (from F4/put PO no. & month and year of report required and execute 2 L2 supply schedule ZMM_INSP03 Reports can be obtained based approved by CMG/site on input field. Input fields are PESM as PO Wise 1. SAP PO Nos. Material Wise 2. Material Nos. Inspection Date 3. Inspection Date Module: Project Systems Topic: Project Progress Report Page 2 of 3 Online Resource: http://teams.powergrid.in/erp/ For Feedback/Suggestion/Commnet please mail at: rupantar_support@powergrid.co.in POWER GRID CORPORATION OF INDIA LIMITED ERP DEPARTMENT
wise 4. Despatch date
Despatch date 5. Delivery Date Delivery Date Input can be Single Value or wise Multiple Value or a Range. Output only for those PO whose Delivery schedule uploaded by CMG/ PESM. 3 Region wise status/ ZPS_SITE_PACK Reports can be obtained based progress report – Site on input field. Input fields are Package Progress as 1. Enter Project defn. 2. Enter name of region 3. Enter start and end date of month for report sought and execute. 4 Diversion Report ZMM_DIVREP Reports can be obtained based on input field. Input fields are as 1. Enter Project 2. Enter WBS if required 3. Enter material no, if specific material is required 4. Select date as per requirement & Execute
Module: Project Systems Topic: Project Progress Report Page 3 of 3
Online Resource: http://teams.powergrid.in/erp/ For Feedback/Suggestion/Commnet please mail at: rupantar_support@powergrid.co.in