POWER GRID CORPORATION OF INDIA LIMITED

ERP DEPARTMENT

PROJECT PROGRESS REPORT

A L2 plan /actual Progress Monitoring - Supply & Services

Sl. Description T-CODE Process Description


No.
A. Erection (services)
1 Package Wise Erection ZPSL2_SERVICE Reports can be obtained based
Progress Report on input field. Input fields are
as
1. Enter name of Project defn.
2. Enter WBS name of service
of Pkg. in scheduling side
3. Enter start and end date of
month for report sought
and execute.
2 Consolidated Erection ZPSREPORT Reports can be obtained based
Progress Monitoring - on input field. Input fields are
region wise/ vendor any of region wise/ vendor
wise/ project wise wise/ project wise /element
/element wise erection wise
progress report. Print 1. Data can be fetch directly
option for TL and for small value
substation is also 2. If region wise /more no. of
available. Data - choose background
job

3 L2 erection schedule ZPSL2R1


Reports can be obtained based
approved by CMG/site on input field. Input fields are
PESM as
 Project wise 1. Enter Project defn.
 Pkg. wise 2. Enter WBS name of Pkg.
in scheduling side
3. Select version and execute.
4 Actual erection progress ZPSR_ACTUAL_REPORT Reports can be obtained based
data on input field. Input fields are
 Project wise as
 Pkg. wise 1. Enter Project defn.
2. Enter WBS name of Pkg.
in scheduling side

Module: Project Systems Topic: Project Progress Report Page 1 of 3


Online Resource: http://teams.powergrid.in/erp/
For Feedback/Suggestion/Commnet please mail at: rupantar_support@powergrid.co.in
POWER GRID CORPORATION OF INDIA LIMITED
ERP DEPARTMENT

3. Select date range (by


default all possible date of
progress) and execute.
5 CEA Report ZPS_CEA Reports can be obtained based
(exclusively for CMG on input field. Input fields are
Deptt.) as
1. Enter name of Region
2. select Transmission line
/substation /other &
Execute
6 MPT Report ZPS_MPT Reports can be obtained based
(exclusively for CMG on input field. Input fields are
Deptt.) as
1. Enter name of Region
2. Select date (by default
current date) & Execute.
5 Consolidated Project ZPMS Reports can be obtained based
Status - all project data on input field. Input fields are
status as
1. Enter name of Region
2. Enter Project
3. Enter date (project start
date) from where you
report sought and execute.
B. Supply
1 Package Wise Supply ZPSSUPPLY Reports can be obtained based
Progress Report on input field. Input fields are
as
1. Enter Project
2. Select WBS Level(if search
required on basis of WBS
level)
3. Select WBS (if WBS level
query required)
4. Select (from F4/put PO no.
& month and year of
report required and
execute
2 L2 supply schedule ZMM_INSP03 Reports can be obtained based
approved by CMG/site on input field. Input fields are
PESM as
 PO Wise 1. SAP PO Nos.
 Material Wise 2. Material Nos.
 Inspection Date 3. Inspection Date
Module: Project Systems Topic: Project Progress Report Page 2 of 3
Online Resource: http://teams.powergrid.in/erp/
For Feedback/Suggestion/Commnet please mail at: rupantar_support@powergrid.co.in
POWER GRID CORPORATION OF INDIA LIMITED
ERP DEPARTMENT

wise 4. Despatch date


 Despatch date 5. Delivery Date
 Delivery Date Input can be Single Value or
wise Multiple Value or a Range.
Output only for those PO
whose Delivery schedule
uploaded by CMG/ PESM.
3 Region wise status/ ZPS_SITE_PACK Reports can be obtained based
progress report – Site on input field. Input fields are
Package Progress as
1. Enter Project defn.
2. Enter name of region
3. Enter start and end date of
month for report sought
and execute.
4 Diversion Report ZMM_DIVREP Reports can be obtained based
on input field. Input fields are
as
1. Enter Project
2. Enter WBS if required
3. Enter material no, if
specific material is
required
4. Select date as per
requirement & Execute

Module: Project Systems Topic: Project Progress Report Page 3 of 3


Online Resource: http://teams.powergrid.in/erp/
For Feedback/Suggestion/Commnet please mail at: rupantar_support@powergrid.co.in