You are on page 1of 4

Capex Schedule (Rs bn)

Column2

16.6 17.5
15.7 16 16.1
13.1

FY2 0 FY2 1 FY2 2 FY2 3 FY2 4 FY2 5

Regulated Asset Base (Rs bn)

105
95.7
81.1 86.8
72.1
63.9

FY20 FY21 FY22 FY23 FY24 FY25

Column2
Chart Title
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
FY20 FY21 FY22 FY23 FY24 FY25

Nominal ABR Real ABR

ATL's -Grid-to-Switch Integrated Platform


0
0

14,739
13,562

8,600
5,450

FY17 FY18 FY19 FY20

Transmission Line (Ckt kms) Column2


Chart Title
% Growth in Generation Capacity (MW) Column1

64%

51%

26% 26%
24% 24%
22%
17% 15%
12%

FY 92-97 FY 97-02 FY 02-07 FY07-12 FY12-17

Transmission Line ('000 ckm)^1


3
7 9 16 21 27 33
11
39 69 106 148

80
126
177
229
291 362

118
145
172 204 241 285

FY09 FY14 FY19 FY24(P) FY29(P) FY34(P)

230/220 kv 400 kv 765 kv HVDC 500/800 kv


Transmission Capacity ('000 ckm)^1
10 14 24 40 59 33
5
83
205 332 485 662
115

177
296
411
549 709

175
257
341 425 525 642

FY09 FY14 FY19 FY24(P) FY29(P) FY34(P)

230/220 kv 400 kv 765 kv HVDC 500/800 kv