UE Construction Sdn Bhd UEC/MS/BR 570/LB/019
METHOD STATEMENT
FOR
LAUNCHING OF PRESTRESSED I-18
BEAMS AT BR 570 (SG BATANG PADANG)
IMPORTANT:
CONTENTS
1.0 INTRODUCTION
2.0 MATERIALS
3.1 MANPOWER
3.2 EQUIPMENT
4.0 METHOD
6.0 APPENDICES
1.0 INTRODUCTION
METHOD STATEMENT Page No. : Page 3 of 8
Revision : 0
Issued : August 2002
UE Construction Sdn Bhd UEC/MS/BR 570/LB/019
2.0 MATERIALS
The prestressed “I” Beams will be cast prior to the launching and
the required design strength achieved prior to the launching.
The position for the “I” beams on the crosshead and abutment
shall be marked on the “I” beams before launching.
3.1 MANPOWER
1 Engineer
1 Supervisor
1 Operator
2 Bar benders
General Workers
1 Safety Officer
3.2 EQUIPMENT
4.0 METHOD
METHOD STATEMENT Page No. : Page 4 of 8
Revision : 0
Issued : August 2002
UE Construction Sdn Bhd UEC/MS/BR 570/LB/019
Audit survey shall be carried out for the top level of cross
head and abutment where “I” beams rest.
5.2 Regulations
All site activities shall comply strictly with KTM regulations and
requirements. Before commencement of works all relevant staff
will be briefed and trained to comply with KTMB regulations. All
staff will also be familiar with the Construction Crisis Team’s
Handbook.
6.0 APPENDICES
APPENDIX 1
METHOD STATEMENT Page No. : Page 8 of 8
Revision : 0
Issued : August 2002
UE Construction Sdn Bhd UEC/MS/BR 570/LB/019
APPENDIX 2