Summary Up to 8th of

Production and Loss Shrawan 2077

Yield 95.64%
Net Production (kgs)
Gross Loss 1.04% 0.33% 3%
4.04%
Rejected 0.33%
miss Roll 1.04% Missed Roll (kgs)
Production 8 Days
Days
269361 kgs/day Rejected (Kgs)

Other Loss (kgs)

96%

Production OK:
2060.836 MT
Missed Roll: 22.304 MT
Rejection: 7.098 MT
Burning Loss (1.5%): 32.323 MT
End Cuts (0.75%): 16.162 MT
Total Production: 2131.89 MT
Less Production: 2067.933 MT
Billet Consumed: 2154.884 MT
FO Consumed: 94816.0 Ltrs
Electricity Consumed: 252431.0
FO/tons: 46.0 ltrs/MT
Electricity (Kwh/MT): 122.5
Total Running hours: 94 hours 55 mins
Breakdown: 31 hours 9 minuts
Breakdown (%): 32.81%