GODAGAMA INTER CHANGE

FLOOR FINISHES PAINTING


FLOOR READY BRICK/ BLOCK PLASTERING / PLASTERING / ELECTRICAL ELECTRICAL PLUMBING /
Buildings Ramp (SGT/Filling) FOUNDATION COLUMN TIE BEAM SLAB ROOF FRAME ROOF COVERING WORK INTERNAL EXTERNAL
( TILING or ( INTERNAL AND
WIRING FIXTURES FIXTURES
OTHERS) EXTERNAL))

B2 (Single Floor) Ramp A 100% 100% 20% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

B3 (Two Floor) Ramp A 100% 100% 20% 0% 0% 10% 0% 0% 0% 0% 0% 0% 0%

B2 (Single Floor) Ramp E 100% 100% 100% 100% 100% 60% 75% 50% 0% 0% 0% 0% 0% 0%

B3 (Two Floor) Ramp E 100% 100% 50% 15% 0% 15% 0% 0% 0% 0% 0% 0% 0%

APAREKKA INTERCHANGE ###


FLOOR FINISHES PAINTING
FLOOR READY BRICK/ BLOCK PLASTERING / PLASTERING / ELECTRICAL ELECTRICAL PLUMBING /
Buildings Ramp (SGT/Filling) FOUNDATION COLUMN TIE BEAM SLAB ROOF FRAME ROOF COVERING WORK INTERNAL EXTERNAL
( TILING or ( INTERNAL AND
WIRING FIXTURES FIXTURES
OTHERS) EXTERNAL))

B3 (Two Floor)-
office Complex 100% 100% 100% 100% 100% 80% 0% 95% 90% 90% 25% 0% 25% 0% 50%
B2 (Single Floor)-
Generator /Driver 100% 100% 100% 100% 100% 90% 0% 95% 80% 80% 25% 0% 10% 0% 60%
B1 (Two Floor)-
Police Building 100% 100% 100% 100% 100% 45% 0% 70% 0% 0% 25% 0% 0% 0% 60%

BELIATTA INTERCHANGE ###

FLOOR READY COLUMN ( All BRICK/ BLOCK PLASTERING / PLASTERING / FLOOR FINISHES PAINTING ELECTRICAL ELECTRICAL PLUMBING /
Buildings Ramp (SGT/Filling) FOUNDATION Floor) TIE BEAM SLAB ROOF FRAME ROOF COVERING WORK INTERNAL EXTERNAL ( TILING or ( INTERNAL AND WIRING FIXTURES FIXTURES
OTHERS) EXTERNAL))

B5 (Three Floor) 100% 100% 100% 100% 100% 65% 80% 60% 55% 20% 0% 30% 0% 25%

B2 (Single Floor) 100% 100% 100% 100% 0% 95% 100% 100% 100% 40% 20% 10% 0% 0%

###