DAILY SITE RECORD Tuesday, September 15, 2020 DAILY SITE PHOTO
Activities Location Description of works Remarks
Structural work PILE CAP STATUS
SITE VIEW
Architectural
STATUS: PINK SHADES AT Lower Deck Level REMAINS @ 62.96% LIFT PIT REINFORCING BARS INSTALLATION IN PROGRESS
Weather G Worker 10
TC OPERATOR 1
LBD HACK TEAM 3
EXCAV. OPTR IC WORKS IC#4
1 5
RAIN
EXCAV SUPVSR 1
Manpower
12:00NN 16:30 TOTAL : 18 TOTAL : 28 TOTAL : 0 TOTAL : 5 51 KEY PLAN SHOWING DETENTION DRAIN @70% COMPLETE, DETENTION WALL WB4a WB4 WB5, AND GH11b GH11c REINFORCING BARS ALREADY
DRAIN COVER AND GRATING TO BE INSTALLED AT LATER STAGE CHECKED TO CAST AT 1 PM ON 16 SEPTEMBER 2020
AT Lower Deck Level REMAINS @ 55.56% 13 Pile caps more to complete at lower Deck Level , GREEN SHADES @Upper Deck Level PILE
CAP @ 96.67% Complete YELLOW CLOUDS AT ELECTRICAL SUBSTATION AREA PURPLE CLOUDS AT LIFT PIT FOUNDATION AREA casting RC SUMPS AND PIPE HAUNCHING
done remains @34.30% COMPLETE
DETENTION DRAIN @70% COMPLETE, DETENTION DRAIN COVER AND GRATING TO BE INSTALLED AT LATER STAGE
INTERNAL DRAINAGE
RC SUMPS AND PIPE HAUNCHING remains at 34.30 % COMPLETE KEY PLAN SHOWING AREAS OF RC SUMPS AND PIPE HAUNCHING remains at
34.30 % COMPLETE
GROUND BEAM REBARS INSTALLED, DROP PANEL BOTTOM BARS INSTALLED, INSTALLING BOTTOM REINFORCING BARS AT
GRIDLINE 12 TO 7 / G TO D GROUND BEAM AND DROP PANEL
REBARS INSTALLATION IN
PROGRESS AT AREAS OF UPPER
DECK SLAB GRIDLINE 12 TO 7 D TO
G
@ELECTRICAL
SUBSTATION BELOW
TRANSFORMER ROOM :
INSTALLING DEEP BEAMS
UPPER DECK GROUND BEAMS, DROP PANEL REINFORCING BARS INSTALLATION IN PROGRESS. GROUND BEAM REBARS INSTALLED, DROP PANEL BOTTOM BARS INSTALLED, UPPER DECK GROUND BEAMS, DROP PANEL REINFORCING BARS INSTALLATION
REMAINING AREA OF
CAPPING BEAM
ANOTHER 18% TO
COMPLETE
INSTALLED 10 DROP PANELS BOTTOM REINFORCING BARS AND 3 ROWS OF GROUND BEAMS, PARTIAL BOTTOM SLAB REMAINING AREA OF CAPPING BEAM ANOTHER 18% TO COMPLETE
REBARS ARRIVED LCT TO QUICKLY SETTLE RWDP ISSUES,WALL WB4a WB4 WB5, AND GH11b GH11c REINFORCING BARS
ALREADY CHECKED TO CAST AT 1 PM ON 16 SEPTEMBER 2020
22 WORKERS +8 LCT +2 LBD +2CL DOING SITEWORKS: BEAKDOWN OF MANPOWER @LIFT FOUNDATION : PILE CAP REBARS : 22 WORKERS +8 LCT +2 LBD +2CL DOING SITEWORKS: BEAKDOWN OF
6 REBAR WORKERS @ UPPER DECK SLAB AREA AT GRIDLINE 6TO 5 2 workers REBAR+ LIFT PIT FOUNDATION 4 + 4 workers INSTALLED 10 DROP PANELS WALL WB4a WB4 WB5,
BOTTOM REINFORCING BARS AND 3 MANPOWER @LIFT FOUNDATION : PILE CAP REBARS : 6 REBAR WORKERS @
AT PARAPET WALL FORMWORKS/ CAST 2 WORKERS ,PIPE HAUNCHING AND LEANCONCRETE 4 WORKERS. 2 WORKERS SAFETY AND GH11b GH11c
ROWS OF GROUND BEAMS, PARTIAL
& HOUSEKEEPING, SHIFTING HOISTING MARTERIALS TO UPPER DECK SLAB SLAB Area, 3 LBD HACKING OF MSCP PILES REINFORCING BARS UPPER DECK SLAB AREA AT GRIDLINE 6TO 5 2 workers REBAR+ LIFT PIT
BOTTOM SLAB REBARS ARRIVED LCT
ALREADY CHECKED TO
TO QUICKLY SETTLE RWDP ISSUES FOUNDATION 4 + 4 workers AT PARAPET WALL FORMWORKS/ CAST 2
CAST AT 1 PM ON 16
SEPTEMBER 2020 WORKERS ,PIPE HAUNCHING AND LEANCONCRETE 4 WORKERS. 2
TRANSFORMER ROOM :
INSTALLING DEEP BEAMS,
upstand beams