You are on page 1of 5

CURRICULUM VITAE

Application for the post of: QAQC Engineer (Mechanical)

OBJECTIVE:
Aspiring to be associated with a reputed organization and working in a
challenging environment where my qualification, potential and diverse
experienced can be utilized to the fullest extent. I am willing to work with
great sincerity towards my commitment, dedication and hard work for the
benefits of the company in line with its mission, client’s requirements and
for personal growth where quality, professionalism and priorities are well
defined. Knowledge driven professional with aptitude to execute related
Mr. PRATAP construction activities through strategically engineered methodology,
technically based decisions and solutions.

BISWAS
Mr. PRATAP BISWAS BRIEF PROFILE:
Email:- ● BE Mechanical Engineer, with AWS, BGAS-Grade2, API-570 and ASNT NDT-
Email :
pratap.biswas@rediffmail.com level 2(RT, UT, PT, MT) certified.
pratap.biswas@rediffmail.com
Phone : 91-7866006242 (India) ● Approximately 15+years’ experience ( including 10+ years GULF experience)
Phone : 91-7866006242(India) in Oil& Gas Project as a QC Engineer and QC Inspector in Onshore / Offshore
Skype : pratapbiswas22
Skype : pratapbiswas22 Piping / Pipe line, Fabrication and Erection, Structure and pipe support
Whatsapp: +91-9083058215
What’s App: +91-9083058215 Fabrication and Erection, ,including Painting and Coating ,Welding, Testing,
and NDT activity. Completed various large National & international LNG & CNG
Present Address and other Hydro Carbon project, sour service ,cryogenic gas service , sea water
service, nitrogen gas service , water services. With various material like SS, CS,
House no 948, Sector 12,
Present Address
LTCS, DSS, etc.
Near Kaliwada, Bonkode
village, Koperkhairne, Thane, ● Experience in Welding Engineering, Multidisciplinary EPC Inspection, QMS
Navi Mumbai-400709 Auditing Supervision and Documentation.
House no 948, Sector 12, Near
Kaliwada, Bonkode village, ● Experience in shutdown activity
Permanent Address
Koperkhairne, Thane, Navi
SKILL & STRENGTH:
Mumbai-400709
Mr. Pratap Biswas ● Good knowledge of Construction, Inspection, Testing, Pre-
Vill-Ganti commissioning Related to Pipelines/Piping, Mechanical Structures,
P.o- Thakurnagar Painting etc. for Oil, Gas, Petrochemicals Industries.
Permanent
Distt:-North 24 Parganas,
Pin no:-743287
● Good knowledge of NDT activities.
● Good knowledge in pressure test and preparation of test Packages.
(W.B)INDIA . ● Good knowledge in preparation of QCP, ITP, WPS & PQR.
Address
Ph. No:09800461030 ● Good knowledge about various code and standard like ASME, ASTM,
Shell DEP, API, AWS, KNPC standard
Mr. Pratap Biswas ● Capable of handling group of Inspectors and Workmen.
Ganti, Thakurnagar ● Good knowledge about inspection and documentation
Distt:-North 24 Parganas, ●Time Management
Pin no:-743287
(W.B)INDIA . ACADEMIC QUALIFICATION:
Ph. No:09800461030 ● H.S.C (10+2) in the year of 1998 from the H.S.C council of west Bengal.
● BE Mechanical Engineering in the year of 2004 from Jalpaiguri
Government Engineering College.

1
PROFESSIONAL QUALIFICATION:

Personal Detail  (AWS-CWI) Certificate No: 14051601, (Date of Exp-01/05/2020)


(Renewal under process)
 (BGAS-2) Certificate number: 101297 (Date of Exp-13/08/2020)
Father : Gurudhan Biswas
(Renewal under process)
Spouse : Sudipta Biswas  (API-570) Certificate number: 62553, (Date of Exp-30/11/2021)
Nationality : Indian.  (ASNT Level 2) (RT, UT, PT, MT) Mumbai, India,
Date of birth : 1/1/ 1980. (Date of Exp-3/11/2023)
Gender : Male MEMBERSHIP:
Language Known:  Member of Kuwait Society of Engineer (KSE) Certificate no.35138
English, Hindi, Bengali
ASSETS:

Passport Detail  Effective Leadership Qualities.


 Highly motivated to work in a team
Passport no : L 3818551  Ability to learn fast, keen listener, dedication, Hard work
Date of issue :11/11/2013 EMPLOYMENT HISTORY:
Date of expiry :10/11/2023
●As a QA/QC Engineer -Alghanim International O&G (Kuwait)
Place of issue : KUWAIT
KIPIC-Kuwait.
●As a QC Engineer-GS Engineering and Construction(EPC -Korea)
KNPC- Kuwait.
Driving license ●As a QC Inspector -Hanwha Engineering & Construction (EPC -Korea)
KNPC-Kuwait.
NO: WB- 25213170004 ●As a QC Engineer -Bahwan Engineering Com pany LLC (Om an) PDO
●As a QC Engineer -Neo structo Construction LT D HPCL (India)
Date of issue : 07/06/2013
Date of expiry :31/12/2029 RESPONSIBILITY : (Fabrication / Welding / Erection / NDT / Testing)
Place of issue : INDIA
● Experience in handling independently the Quality Assurance & Quality
Control activities of EPC Projects in Oil & Gas sectors.
● Implementation of QMS in Oil & gas Construction Preparation of QC
Procedures, ITP, WPS, Test packs. Inspection and Testing
● Responsible for supervision of the project QC inspection team
● Understand and promote the Company QA/QC requirements and
compliance expectations.
● Evaluate and monitor the performance of project QC inspectors, and
identify training requirements to continually improve the performance of
Responsibility the Project Quality Team.
● Review the project scope of work, to determine the nature, extent and
frequency of quality verification activities
● Pre-Inspection Meetings to ensure that the quality requirements and
expectations are fully understood and implemented prior to
commencement of work activities.
● Lead the NCR management process for identified non-conformances –
including NCR/CAR issue, disposition approval and close-out.
● Identify quality lessons learned, and propose suitable corrective actions
to improve work processes and prevent further undesirable conditions/
situations.

2
● Responsible for project punch-list coordination and close-out prior to
mechanical acceptance.
● Monitor quality control activities at various stages of project execution
● Preparation of inspection test plans (ITP), wielding procedure
specification (WPS) for various areas of project execution including
establishing of procedure qualification records (PQR)
● Plan and monitor document preparation for actual quality assurance and
quality control activities carried out during various stages of project
execution.
● Preparation of QAQC monthly report.
● Pipe book preparation and maintain as per KP points.
● preparation of pipeline stringing report.
● Control calibrated measuring and test equipment used on the project.
● Ensure stage-wise inspections are carried out as required and related
reports are generated.
● Ensure all executed jobs meets the required quality levels as specified by
the customer / relevant standards
● Organize, implement, conduct and manage the QA/QC Programs as per
the Company's Quality Policy.
● Coordinate all inspections, monitor the required tests and record
inspections and tests made pas the Contract Plan and Contract
Summary of work Specifications.
Summary of ● Witness of pressure test and pneumatic test.
● Prepare pre and post punch of piping, hydro test, commissioning works
work and different QC activities.
● Interposition of radiography and x-ray film
● To check, inspect and test incoming welding and construction materials
to ensure they meet project specification requirements.
● To monitor Welder performance and conduct visual inspections of welds
Summary of in accordance with Company procedures and codes requirements.
● Welding inspection before during & after
work ● To conduct fit up and dimension inspections(Material line class, Color
Code, Internal Cleaning of the pipe, Orientation of the welding horizontal
seam, bevel angle, root gap Etc.)
● To coordinate with clients to undertake Procedure Qualification Tests
(PQT) and inspections of prepared test specimens and witness destructive
tests.
● Welding Visual Inspection including dimension check of fabricated
items and
● Reviewed Heat treatment Charts against construction code
● Inspection of Hardness.

SUMMARY OF WORKING:
Project 1 :- The NRP has been divided into five major EPC packages.
Package 4, for which Saipem has received award notification in joint
venture with Essar Projects Limited, consists of Engineering,
Procurement, Construction, Pre-Commissioning and Assistance during
Commissioning/Start-up/Performance Testing for the tank, related road
works, buildings, pipe racks, pipelines, water systems and control systems

3
for the Al-Zour refinery. Package 4 will be completed by the beginning of
2019.
Project 2:- Approximately 10 kilometer long HBE coated 14”LSD and
18”LSFO buried pipeline which is connected between Al- Zour Power
Station and KIPIC refinery, a part of project Saipem package 3.
Organization: Alghanim International Kuwait
Project : KNPC AL-Zour Refinery Project (EPC-0059)
Tenure : 15/9/2015 to 24/10/2019
Position : QA/QC Engineer
Job Location : KUWAIT
Summary of work SUMMARY OF WORKING:
Project:- Construction of North LPG Tank Farm Project at Mina Al
Ahmdei Refinery, The scope of work includes engineering, procurement,
construction and commissioning of the north LPG tank farm project at
Mina Al Ahmadei refinery, which is included SMP-2 (Structure
Mechanical and Piping)
Organization: GS Engineering and Construction (EPC- Korea)
Kuwait
Project : NLTF (LNG)
Tenure : 17/7/2013 to 25/07/2015
Position : QC Engineer
Job Location : KNPC, KUWAIT

SUMMARY OF WORKING:
Project:- Up-gradation of the existing fire detection, suppression and
alarm systems at KNPC’s Mina Al-Ahmadi Refinery aiming for reduction
in time delay between detection and deployment and accurate detection.
In addition, in efforts for an environmentally friendly solution, this project
includes the phase-out of the Halon system currently being used at the
refinery.
Organization : Hanwha Engineering Construction (EPC-Korea)
Kuwait
Project : Halon Phase Out (Fire water Line)
Tenure : 17/3/2012 to 25/3/2013
Position : QC Inspector
Job Location : KNPC, KUWAIT

4
SUMMARY OF WORKING:
Project:- As gas is being produced from Saih Rawl, the reservoir
pressure and hence the FTHP of Saih Rawl wells will decline over the
remaining lifetime of the field. In order for CPP to continue to process
wet gas from Saih Rawl wells and maintain its gas export capacity, the
inlet pressure to its gas conditioning trains must be maintained
constant at 96 bar. To achieve this, a number of depletion compression
stages are planned to be installed upstream of the gas processing trains
in separate phases. When the Phase I compressor inlet pressure falls
below 35 bar Phase II compression train will be made operative The
Phase II compression trains comprising of another set of compressors,
which will receive the wet gas and boost the pressure from 13 bar to 35
Summary of work bar .The discharge of Phase II . compressor will go to the phase I
compressor suction, which will further boost the pressure to 96 bar
Organization: Bahwan Engineering Company LLC (PDO-Oman)
Project : Sahrawi Depletion Compression (SRDC)
Tenure : 3/9/2008 To 11/10/2011
Position : QC Engineer
Job Location : PDO, OMAN

SUMMARY OF WORKING :
Details of Project:- 4,50,000" dia SS/CS/Jacketed Piping including
IBR for CP10,CP11 & PTA-3 Projects at RIL, Hazira Complex
Details of Project:- (Shutdown) (45 days) "Piping of 57000""
dia in FCCU, FR-APS, OFFSITE, Crack LPG at HPCL, Mahul Refinery."
HPCL Mumbai
Organization: Neo Structo Construction LTD, (India)
Projec : PTE -3
Tenure : 4/9/2004 to 31/7/2008
Position : QC Engineer
Job Location : INDIA

DECLARATION:
I hereby declare that the above particulars are true to the best of my
knowledge and belief. If I am offered an opportunity to work, I will
discharge the duties entrusted to me to the best of my capacity and to
Declaration the entire satisfaction of my superiors.

Pratap Biswas Date:

You might also like