Green Industry Campus

Abbreviations

DMIC Delhi Mumbai Industrial Corridor


DFC Dedicated Freight Corridor
EH Express Highway
FGI Federation of Gujarat Industries
GEB Gujarat Electric Board
GIDB Gujarat Infrastructure Development Board
GIDC Gujarat Industrial Development Corporation
GSRTC The Gujarat State Road Transport Corporation
IGBC Indian Green Building Council
IMD Indian Meteorological Department
HTL High Tension Line
IndexTB Industrial Extension Bureau
LPM Liters Per Minute
LSI Large Scale Industry
MSI Medium Scale Industry
NH National Highway
NOC No Objection Certificate
SH State Highway
SEZ Special Economic Zone
SSI Small Scale Industry
TCDS Twin City Development Strategy
TDS Total Dissolved Solids
USGBC United States Green Building Council
VMC Vadodara Municipal Corporation
VUDA Vadodara Urban Development Authority

13
Green Industry Campus

List of figures

1-1 Gujarat in India .................................................................................................................17


1-2 Vadodara district in Gujarat .............................................................................................17
1-3 VUDA Limit from Site .......................................................................................................17
1-4 Site in Karjan Dabhoi taluka.............................................................................................17
1-5 Site from major transport systems ...................................................................................18
1-6 Access road site to NH8...................................................................................................18
1-7 Developments adjacent to site and NH8..........................................................................18
1-8 DMIC in Gujarat state.......................................................................................................18
1-9 DMIC influenced area in Vadodara district ......................................................................18
1-10 Vadodara rail map ..........................................................................................................19
1-11 Airport of Vadodara city..................................................................................................19
1-12 Surrounding villages within 20 km radius.......................................................................20
1-13 Villages abutting NH8.....................................................................................................21
1-14 Horizon Industrial Park ...................................................................................................22
1-15 Bamangam Village .........................................................................................................22
1-16 Site and surrounding 0-3 km radius ...............................................................................22
1-17 Adya Oil Mills, Karjan .....................................................................................................22
1-18 Nana Fofaliya village ......................................................................................................22
1-19 Site and surrounding 3-5 km radius ...............................................................................23
1-20 Por GIDC Industrial area................................................................................................23
1-21 Kandari ...........................................................................................................................23
1-22 Kayavarohan town .........................................................................................................23
1-23 Graph indicating maximum ............................................................................................25
1-24 Sun path diagram, Bharuch ...........................................................................................26
1-25 W indrose diagram, Vadodara ........................................................................................27
1-26 Monthwise windflow chart for Vadodara ........................................................................27
1-27 Ravine on north of site ...................................................................................................27
1-28 Regional topography sloping towards Gulf of Khambhat...............................................27
1-29 Site access from NH 8 ...................................................................................................28
1-30 Site access road levels ..................................................................................................28
1-31 Site shape and extent ....................................................................................................29
1-32 Site contours ..................................................................................................................30
2-1 Final site layout ................................................................................................................32
2-2 Hierarchy of spaces on site ..............................................................................................33
2-3 Functional divisions of site ...............................................................................................34
2-4 spatial allocation of site ...................................................................................................35
4-1 Climate responsive orientation of buildings to reduce radiation ingress ..........................40
4-2 Climate responsive orientation of buildings to increase natural daylight .........................40
4-3 Proposed site plan showing building margins ..................................................................41
4-4 Site plan showing proposed sun, noise and visual buffers ..............................................43

14
Green Industry Campus

4-5 Various options of circulation on site, with final selected option ......................................45
4-6 Proposed section of major circulation axis.......................................................................45
4-7 Rotated alignment of site plan henceforth in report .........................................................46
4-8 Proposed site plan showing water permeability...............................................................46
4-9 Plan of plant building showing north light from roof ........................................................47
4-10 Typical inclined roof .......................................................................................................47
4-11 Proposed north light roof` ..............................................................................................47
4-12 Elevation showing west side façade of plant building ....................................................48
4-13 Part elevation showing logical proportion of openings for plant.....................................48
4-14 Part plan showing sun protection mounds for openings in plant ...................................48
4-15 Part plan showing indirect openings in administration block .........................................48
4-16 Site plan showing island of colours and avenue trees at main entry to campus ...........49
4-17 Site plan showing grass mounds and avenue trees around plant areas .......................49
4-18 Site plan showing woodland, walk trail, butterfly garden near administration block .....50
4-19 Site plan showing fruit orchard near guest house ..........................................................50
4-20 Typical wall section for plant building.............................................................................51
4-21 Pre-Engineered building systems for plant area ............................................................52
4-22 Images showing sandwich panel for plant area walls ....................................................53
4-23 Grass mounds around plant area ..................................................................................53
4-24 Typical compound wall ...................................................................................................54
4-25 Detailed site plan showing location of buildings ............................................................55
4-26 Plan showing roads ........................................................................................................57
4-27 Section of road ...............................................................................................................57
4-28 Site plan phase 1 with landscape ..................................................................................62
4-29 Island of colours .............................................................................................................63
4-30 Factory lawns and water body near entrance ................................................................63
4-31 Butterfly garden behind administration block .................................................................64
4-32 W alking trail near administration block ..........................................................................64
4-33 Local productive landscape at location of future plant 3, till commencement of plant ...65
4-34 Local income generating landscape near guest house .................................................65
4-35 Local productive landscape at location of future plant 2, till commencement of plant ...66
4-36 Local fruit orchards near plant 1 ....................................................................................66
4-37 Roof top solar panel installation possibility ....................................................................69
4-38 Site plan showing location of STP .................................................................................72
4-39 Site plan showing rain water recharge well locations ....................................................75
4-40 Site plan showing proposed water bodies and ridge lines .............................................76

15
Green Industry Campus

List of Tables

Table 1-1 Population of villages around site within 20 km radius ..........................................20


Table 1-2 Population of villages abutting NH8 .......................................................................21
Table 1-3 Mean minimum and maximum temperatures for site.............................................25
Table 1-4 Relative humidity values for site ............................................................................26
Table 2-1 Proposed buildings on site .....................................................................................34
Table 4-1 Area statistics for proposed buildings in Master Plan ............................................42
Table 4-2 Block cost for buildings in site ................................................................................56
Table 4-3 Block cost for infrastructure road ...........................................................................57
Table 4-4 Raised levels for buildings and site........................................................................58
Table 4-5 Block cost for site leveling and periphery ..............................................................58
Table 4-6 Tentative selection of air-conditioning for administration block .............................59
Table 4-7 Tentative selection of air-conditioning for guest house..........................................59
Table 4-8 Tentative selection of air-conditioning for canteen block .......................................59
Table 4-9 Block cost for air-conditioning of buildings.............................................................60
Table 4-10 Block cost for landscaping of site.........................................................................67
Table 4-11 Block cost for electrical services at site ...............................................................68
Table 4-12 Payback period for solar panel installation ..........................................................70
Table 4-13 Drinking water requirements for proposed uses at site .......................................71
Table 4-14 Block cost for domestic water procurement at site ..............................................71
Table 4-15 Block cost for firefighting at site ...........................................................................71
Table 4-16 Sewage treatment plant (STP) sizing calculation ................................................72
Table 4-17 Block cost for waste water treatment at site ........................................................72
Table 4-18 Average hourly rainfall calculation .......................................................................73
Table 4-19 Recharge bore well quantification based on average hourly rainfall ...................74
Table 4-20 Block cost for storm water collection and rain water recharging .........................76

16
Green Industry Campus

Chapter 1 Preliminary site study

1.1 Location

The site under reference is located in Vadodara district of Gujarat state of India. The site
shares close proximity to Vadodara and Bharuch city. Vadodara, formerly known as
Baroda, is the third largest and most populated city in the Indian State of Gujarat, after
Ahmedabad and Surat. Bharuch is located in the southern part of Gujarat, near the Gulf
of Khambhat in Arabian sea. The district has 8 talukas, of which the major ones are
Bharuch (district headquarter), Ankleshwar, Valia, Jhagadia and Jambusar.

1-1 Gujarat in India

Excellent advantage to site in


terms of proximity to Vadodara
and Bharuch city; 1-2

1-2 Vadodara district in Gujarat

1-4 Site in Karjan Dabhoi taluka 1-3 VUDA Limit from Site

Site is 1.26 km away from NH8; Site is 8km from VUDA (Vadodara Urban Development
Authority) limit;

17
Green Industry Campus

1.2 Site connectivity

The images below demonstrate Nana Fofaliya village, their connections with Vadodara and
Bharuch city.
Vadodara is one of the main cities of Gujarat which is a
major junction for all the three modes of public transport i.e.,
road, rail and air. Site is located 27 kms from Vadodara
railway station. Bharuch town bus stand is 57 kms from site,
which is also one of the junctions connecting site to north
east Gujarat. Bharuch being the second major city close to
the site also has road and rail network accessible to site.

City Distance in kms


Vadodara 27
Bharuch 57
1-5 Site from major transport systems

1.2.1 Road connectivity

Images below show the strong connection of site with National and State Highways, and
DMIC corridor, NH8 is about 1.26 km away from the site.
1-6 Access road site to NH8

1-7 Developments adjacent to site and NH8


1-8 DMIC in Gujarat state
1-9 DMIC influenced area in Vadodara district

The benefits of DMIC shall directly result in