Green Industry Campus
List of figures
14
Green Industry Campus
4-5 Various options of circulation on site, with final selected option ......................................45
4-6 Proposed section of major circulation axis.......................................................................45
4-7 Rotated alignment of site plan henceforth in report .........................................................46
4-8 Proposed site plan showing water permeability...............................................................46
4-9 Plan of plant building showing north light from roof ........................................................47
4-10 Typical inclined roof .......................................................................................................47
4-11 Proposed north light roof` ..............................................................................................47
4-12 Elevation showing west side façade of plant building ....................................................48
4-13 Part elevation showing logical proportion of openings for plant.....................................48
4-14 Part plan showing sun protection mounds for openings in plant ...................................48
4-15 Part plan showing indirect openings in administration block .........................................48
4-16 Site plan showing island of colours and avenue trees at main entry to campus ...........49
4-17 Site plan showing grass mounds and avenue trees around plant areas .......................49
4-18 Site plan showing woodland, walk trail, butterfly garden near administration block .....50
4-19 Site plan showing fruit orchard near guest house ..........................................................50
4-20 Typical wall section for plant building.............................................................................51
4-21 Pre-Engineered building systems for plant area ............................................................52
4-22 Images showing sandwich panel for plant area walls ....................................................53
4-23 Grass mounds around plant area ..................................................................................53
4-24 Typical compound wall ...................................................................................................54
4-25 Detailed site plan showing location of buildings ............................................................55
4-26 Plan showing roads ........................................................................................................57
4-27 Section of road ...............................................................................................................57
4-28 Site plan phase 1 with landscape ..................................................................................62
4-29 Island of colours .............................................................................................................63
4-30 Factory lawns and water body near entrance ................................................................63
4-31 Butterfly garden behind administration block .................................................................64
4-32 W alking trail near administration block ..........................................................................64
4-33 Local productive landscape at location of future plant 3, till commencement of plant ...65
4-34 Local income generating landscape near guest house .................................................65
4-35 Local productive landscape at location of future plant 2, till commencement of plant ...66
4-36 Local fruit orchards near plant 1 ....................................................................................66
4-37 Roof top solar panel installation possibility ....................................................................69
4-38 Site plan showing location of STP .................................................................................72
4-39 Site plan showing rain water recharge well locations ....................................................75
4-40 Site plan showing proposed water bodies and ridge lines .............................................76
15
Green Industry Campus
List of Tables
16
Green Industry Campus
1.1 Location
The site under reference is located in Vadodara district of Gujarat state of India. The site
shares close proximity to Vadodara and Bharuch city. Vadodara, formerly known as
Baroda, is the third largest and most populated city in the Indian State of Gujarat, after
Ahmedabad and Surat. Bharuch is located in the southern part of Gujarat, near the Gulf
of Khambhat in Arabian sea. The district has 8 talukas, of which the major ones are
Bharuch (district headquarter), Ankleshwar, Valia, Jhagadia and Jambusar.
1-4 Site in Karjan Dabhoi taluka 1-3 VUDA Limit from Site
Site is 1.26 km away from NH8; Site is 8km from VUDA (Vadodara Urban Development
Authority) limit;
17
Green Industry Campus
The images below demonstrate Nana Fofaliya village, their connections with Vadodara and
Bharuch city.
Vadodara is one of the main cities of Gujarat which is a
major junction for all the three modes of public transport i.e.,
road, rail and air. Site is located 27 kms from Vadodara
railway station. Bharuch town bus stand is 57 kms from site,
which is also one of the junctions connecting site to north
east Gujarat. Bharuch being the second major city close to
the site also has road and rail network accessible to site.
Images below show the strong connection of site with National and State Highways, and
DMIC corridor, NH8 is about 1.26 km away from the site.
1-6 Access road site to NH8
18