You are on page 1of 2

Emplyoee list of Likhu-2 Headworks 23/12/2076

Emoloyee Code Staff Name


S.N Received
1 SCE/201 Shobha Basnet
2 SCE/242 Ganesh Basnet
3 SCE/517 Bhoop Kumar Roy
4 SCE/518 Chandra Bahadur Magar
5 SCE/734 Indra Bahadur Lama
6 SCE/1073 Banti Dhiman
7 SCE/1119 Jagadish Khadka
8 SCE/1131 Santosh Chhetri
9 SCE/1156 Gulab Singh
10 SCE/1170 Bipin Kumar Keshari
11 SCE/1337 Harichandar Sharma
12 SCE/1338 Ghanashyam Pasavan
13 SCE/1356 Padam Bahadur Pulami
14 SCE/1440 Bhusan Paswan
15 SCE/1495 Sunny Kumar
16 SCE/1223 Santosh Kumar
17 SCE/1225 Rajan Kumar prasad
18 SCE/1215 Padam Bahadur Magar
19 Ghanshyam
20 SCE/158 Bishnu Basnet
21 SCE/231 Yamat Bahadur Basnet
22 SCE/594 Dilli Bahadur Thapa
23 SCE/637 Khadka Bahadur Basnet
24 SCE/996 Sher Bahadur Saud
25 SCE/1075 Nim Raj Sapkota
26 SCE/1185 Sudip Kumar Shah
27 SCE/1266 Harish Saud
28 SCE/1292 Lekha Bahadur Bhandari
29 SCE/1335 Krishna B.K.
Date: 23/12/2076
Number of Manpower available in Likhu-2 Headworks of each Sub-Contractors

S.N Name of Firm Location Number of M/P


Upstream (Left
1 R.N.P.R Deuwa Construction bank) & D.B-3 14
Hillside Wall
2 Khaptad Construction Undersluice 9
3 Royal Hydro Construction Undersluice & D.B-4 40
4 Umakunda (P.K) Intake 30
Service Gate &
5 Veral Construction 19
Emergency Gate
6 Umatirtha (Devraj) Desilting Basin-1 9
7 Gajurmukhi Construction Desilting Basin-2 7
D.B-3 Riverside wall
8 Imara Construction 17
& Transition Slope

Gate portion at
intersection of
9 Nawabuddha Construction 23
Desilting basin &
Collection Pool

10 Kusheswar Construction Bellmouth 11


11 Angat construction (Gopal) H.R.C 7

Dewatering 4, Curing
12 Ghanshyam Construction 7
2, Foreman 1

You might also like