Professional Documents
Culture Documents
in/ExistingRoads/ListExistingRoadsPMGSY3#
Technical Details
CC Length * BT Length *
In case of Scheme 1 pavement length must be greater than 0.5 km. & in case of Scheme 3
Pavement Length * 11.150
it must be greater than 0 km. & should be equal to sum of CC Length and BT Length.
Whether any higher specification beyond PMGSY3 Guidelines have been proposed(including utility shifting)? * Yes No
0
Dry Lean Concrete* 0 Concrete Pavement*
Calculate Pavement Total Cost
State Share (Rs. in Lakhs) 0.00 Mord Share (Rs. in Lakhs) 0.00
1 of 1 08-12-2019, 3:36 PM