PROJECT: Ma'aden Umm Wu'al Phosphate Project,Package.

TOPIC : Date:-

LIST OF ATTENDEES

SL
NAME POSITION SIGNATURE DATE REMARKS
#

GAC-HQC-QD-QC-FM-GE-0015,Rev.A01
TRAINING POINTS

1. GAC Construction team Should follow ITP

2. Before starting work need to confirm as per ITP prior inspection


finished or not

3. Confirm with QC Inspector

4. If it's not finished need to give written Inspection Request to GAC


Qc inspector.

5. After inspection finished Construction team can do the work without


any interaption by following specification also.

6. For Every work what all are the inspections have to do as per ITP
instructed to ConstructionTeam

GAC-HQC-QD-QC-FM-GE-0015,Rev.A01