Name of Work :- Augmentation of Water Supply Scheme to Mandi Town from Uhl River in Distt. Mandi (HP)
1 Heavy Materials & GI pipe Unit : Per Tonne. 2 RCC,AC, Hume, Steel, Unit : Per 100 m.
below 100 mm C.I.Pipes 100 mm dia:-
LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.
By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 99.75 99.75 1 Km. 1 255.51 255.51
2 Km. 0 115.10 0.00 2 Km. 0 294.82 0.00
3 Km. 0 130.28 0.00 3 Km. 0 333.72 0.00
4 Km. 0 145.04 0.00 4 Km. 0 371.52 0.00
5 Km. 0 159.09 0.00 5 Km. 0 407.51 0.00
5- 10 Km. 0 13.00 0.00 5- 10 Km. 0 33.30 0.00
10-20 Km. 0 10.84 0.00 10-20 Km. 0 27.77 0.00
Beyond 20 Km. 0 9.09 0.00 Beyond 20 Km. 0 23.29 0.00
TOTAL : 99.75 TOTAL : 255.51
2 By Head load 2 By Head load
1st. 1 Km. 0 449.40 0.00 1st. 1 Km. 0 1214.66 0.00
1st. 100 Mtr 1 71.40 71.40 1st. 100 Mtr 1 192.98 192.98
Bey:1 Km.Per 1/2Km. 0 224.70 0.00 Bey:1 Km.Per 1/2Km. 0 607.33 0.00
Bey:100 Mtr Per 50 Mtr 0.1 21.00 2.10 Bey:100 Mtr Per 50 Mtr 0.1 56.76 5.68
Total : 73.50 Total : 198.66
G.Total: 1+2= 173.25 Per Tonne. G.Total: 1+2= 454.17 Per 100 m.
3 RCC,AC, Hume, Steel, Unit : Per 100 m. 4 RCC,AC, Hume, Steel, Unit : Per 100 m.
C.I.Pipes 125 mm dia:- C.I.Pipes 150 mm dia:-
LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.
By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 340.68 340.68 1 Km. 1 408.82 408.82
2 Km. 0 393.10 0.00 2 Km. 0 471.72 0.00
3 Km. 0 444.96 0.00 3 Km. 0 533.95 0.00
4 Km. 0 495.36 0.00 4 Km. 0 594.43 0.00
5 Km. 0 543.35 0.00 5 Km. 0 652.02 0.00
5- 10 Km. 0 44.40 0.00 5- 10 Km. 0 53.28 0.00
10-20 Km. 0 37.03 0.00 10-20 Km. 0 44.43 0.00
Beyond 20 Km. 0 31.06 0.00 Beyond 20 Km. 0 37.27 0.00
TOTAL : 340.68 TOTAL : 408.82
2 By Head load 2 By Head load
1st. 1 Km. 0 1486.22 0.00 1st. 1 Km. 0 1711.35 0.00
1st. 100 Mtr 1 236.12 236.12 1st. 100 Mtr 1 271.89 271.89
Bey:1 Km.Per 1/2Km. 0 743.11 0.00 Bey:1 Km.Per 1/2Km. 0 855.68 0.00
Bey:100 Mtr Per 50 Mtr 0.1 69.45 6.94 Bey:100 Mtr Per 50 Mtr 0.1 79.97 8.00
Total : 243.06 Total : 279.89
G.Total: 1+2= 583.74 Per 100 m. G.Total: 1+2= 688.71 Per 100 m.
Executive Engineer,
IPH Division, Mandi.
5 RCC,AC, Hume, Steel, Unit : Per 100 m. 6 RCC,AC, Hume, Steel, Unit : Per 100 m.
C.I.Pipes 200 mm dia:- C.I.Pipes 250 mm dia:-
LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.
By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 681.37 681.37 1 Km. 1 929.14 929.14
2 Km. 0 786.19 0.00 2 Km. 0 1072.08 0.00
3 Km. 0 889.92 0.00 3 Km. 0 1213.52 0.00
4 Km. 0 990.71 0.00 4 Km. 0 1350.97 0.00
5 Km. 0 1086.70 0.00 5 Km. 0 1481.87 0.00
5- 10 Km. 0 88.80 0.00 5- 10 Km. 0 121.09 0.00
10-20 Km. 0 74.05 0.00 10-20 Km. 0 100.98 0.00
Beyond 20 Km. 0 62.11 0.00 Beyond 20 Km. 0 84.70 0.00
TOTAL : 681.37 TOTAL : 929.14
2 By Head load 2 By Head load
1st. 1 Km. 0 2568.00 0.00 1st. 1 Km. 0 4513.68 0.00
1st. 100 Mtr 1 271.89 271.89 1st. 100 Mtr 1 717.12 717.12
Bey:1 Km.Per 1/2Km. 0 1284.00 0.00 Bey:1 Km.Per 1/2Km. 0 2256.84 0.00
Bey:100 Mtr Per 50 Mtr 0.1 120.00 12.00 Bey:100 Mtr Per 50 Mtr 0.1 210.92 21.09
Total : 283.89 Total : 738.21
G.Total: 1+2= 965.26 Per 100 m. G.Total: 1+2= 1667.35 Per 100 m.
7 RCC,AC, Hume, Steel, Unit : Per 100 m. 8 RCC,AC, Hume, Steel, Unit : Per 100 m.
C.I.Pipes 300 mm dia:- C.I.Pipes 350 mm dia:-
LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.
By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 1202.41 1202.41 1 Km. 1 1703.42 1703.42
2 Km. 0 1387.40 0.00 2 Km. 0 1965.48 0.00
3 Km. 0 1570.44 0.00 3 Km. 0 2224.80 0.00
4 Km. 0 1748.31 0.00 4 Km. 0 2476.78 0.00
5 Km. 0 1917.71 0.00 5 Km. 0 2716.76 0.00
5- 10 Km. 0 156.70 0.00 5- 10 Km. 0 221.99 0.00
10-20 Km. 0 130.68 0.00 10-20 Km. 0 185.13 0.00
Beyond 20 Km. 0 109.61 0.00 Beyond 20 Km. 0 155.28 0.00
TOTAL : 1202.41 TOTAL : 1703.42
2 By Head load 2 By Head load
1st. 1 Km. 0 5648.11 0.00 1st. 1 Km. 0 8075.09 0.00
1st. 100 Mtr 1 897.37 897.37 1st. 100 Mtr 1 1282.97 1282.97
Bey:1 Km.Per 1/2Km. 0 2824.06 0.00 Bey:1 Km.Per 1/2Km. 0 4037.55 0.00
Bey:100 Mtr Per 50 Mtr 0.1 263.93 26.39 Bey:100 Mtr Per 50 Mtr 0.1 377.34 37.73
Total : 923.76 Total : 1320.70
G.Total: 1+2= 2126.17 Per 100 m. G.Total: 1+2= 3024.12 Per 100 m.
Executive Engineer,
IPH Division, Mandi.
9 RCC,AC, Hume, Steel, Unit : Per 100 m. 10 RCC,AC, Hume, Steel, Unit : Per 100 m.
C.I.Pipes 400 mm dia:- C.I.Pipes 450/500 mm dia:-
Executive Engineer,
IPH Division, Mandi.
CARRIAGE OF MATERIAL BY MECHANICAL TRANSPORT
Sr. Average speed Km/hour(s) No.of Trips No.of Litre of Litre of Litres of Cost of Cost of 6 Hire Total cost Cost per Increase Average
No. No. Km. diesel Diesel @ M.Oil M.Oil @ Beldar @ Charges Col.No6+ trip in Cost cost per
Lead done consum-ed per Ltr. consum- per litre per day of Truck 8+9+10 per Km additional
in 2NL+6 ed @ per over Km.after
K.M. day previous five Km.
(L) Km.
2 Earth work. 6 cu.m 4.80 1 cu.m 155.86 179.84 203.57 226.63 248.58 20.31 16.94 14.21
3 Manure or sludge 6 cu.m 5.52 1 cu.m 135.53 156.38 177.02 197.07 216.16 17.66 14.73 12.36
4 Excavated rock. 6 cu.m 3.00 1 cu.m 249.38 287.75 325.71 362.60 397.73 32.50 27.10 22.73
5 Sand,stone agg. below 40mm 5 cu.m 5.00 1 cu.m 149.63 172.65 195.43 217.56 238.64 19.50 16.26 13.64
Stone agg. 40 mm & above,
6 5 cu.m 4.62 1 cu.m 161.94 186.85 211.50 235.45 258.27 21.10 17.60 14.76
build. Stones.
Soling stone, stone block &
7 5 cu.m 4.25 1 cu.m 176.03 203.12 229.91 255.95 280.75 22.94 19.13 16.05
stone for filling crates
8 Bricks. 2000Nos. 2000 1000 Nos. 374.07 431.62 488.57 543.90 596.60 48.75 40.66 34.10
9 Bricks tiles. 3200Nos. 3200 1000 Nos. 233.79 269.76 305.35 339.94 372.88 30.47 25.41 21.31
10 Slates. 14450Nos. 14450 1000 Nos. 51.77 59.74 67.62 75.28 82.57 6.75 5.63 4.72
11 Terrazzo Tiles. 2500Nos. 2500 1000 Nos. 299.26 345.30 390.85 435.12 477.28 39.00 32.52 27.28
Cement G.I. CI. AC. CC pipes
12 below 100mm dia & other 7.50 Tonne 7.50 1 Tonne 99.75 115.10 130.28 145.04 159.09 13.00 10.84 9.09
heavy materials.
13 Steam Coal 5.5 Tonne 5.50 1 Tonne 136.03 156.95 177.66 197.78 216.95 17.73 14.78 12.40
14 Steel i/c C.G.I & A.C.sheet. 7.50 Tonne 7.50 1 Tonne 99.75 115.10 130.28 145.04 159.09 13.00 10.84 9.09
15 Timber 5 cu.m 5.00 1 cu.m 149.63 172.65 195.43 217.56 238.64 19.50 16.26 13.64
16 Tar Bitumen etc. 4.50 Tonne 4.50 1 Tonne 166.25 191.83 217.14 241.73 265.16 21.67 18.07 15.16
R.C.C.,A.C. Hume, steel
17 329.40m 329.40 100m 227.12 262.06 296.64 330.24 362.23 29.60 24.68 20.70
C.I.Pipes:- 80 mm dia
18 100 mm dia 292.80m 292.80 100m 255.51 294.82 333.72 371.52 407.51 33.30 27.77 23.29
19 125 mm dia 219.6m 219.60 100m 340.68 393.10 444.96 495.36 543.35 44.40 37.03 31.06
20 150 mm dia 183m 183.00 100m 408.82 471.72 533.95 594.43 652.02 53.28 44.43 37.27
21 200 mm dia 109.80m 109.80 100m 681.37 786.19 889.92 990.71 1086.70 88.80 74.05 62.11
22 250 mm dia 80.52m 80.52 100m 929.14 1072.08 1213.52 1350.97 1481.87 121.09 100.98 84.70
23 300 mm dia 62.22m 62.22 100m 1202.41 1387.40 1570.44 1748.31 1917.71 156.70 130.68 109.61
24 350 mm dia 43.92m 43.92 100m 1703.42 1965.48 2224.80 2476.78 2716.76 221.99 185.13 155.28
25 400 mm dia 32.94m 32.94 100m 2271.22 2620.64 2966.39 3302.37 3622.34 295.99 246.84 207.04
26 450 /500mmdia 25.62m 25.62 100m 2920.14 3369.40 3813.93 4245.90 4657.30 380.56 317.37 266.20
27 600,700,750&800mm dia 18.30m 18.30 100m 4088.20 4717.16 5339.51 5944.26 6520.22 532.79 444.32 372.68
28 900,1000,1100&1200mm dia 11.00m 11.00 100m 6801.27 7847.64 8883.00 9889.09 10847.27 886.36 739.18 620.00
Executive Engineer,
IPH Division, Mandi.
CARRIAGE OF MATERIAL BY MANUAL LABOUR INCLUDING LOADING/UNLOADINGAND STACKING OF MATERIALS
S.No MATERIALS CAPACITY NET UNITS COST OF COST OF CARRIGE INCLUDING LOADING AND STACCKING
QTY.TO BE
PAID
8 HOURS FOR FOR EVERY FOR 100 FOR 1 BEYOND Remarks
AFTER FIRST 50 ADD. LEAD
OF 50
MTR (Col KM. 1
DEDUCTIO MTR 7+8) (18*Co8+ KM./EVE
MTRS OR
N OF
VOIDS.
PART 9) RY 1/2
THERE OF KM.(50%
BEYOND 50
MTRS UP
of Co.10)
TO 0.50 KM
1 2 3 4 5 6 7 8 9 10 11 12
Light material A=(7.67Bel@ 210) 1610.70 B=(1610.70/2)+(1610.70*1.40)/2 1932.84
1 Lime, moorum and building rubish. 35 cu.m 35.00 1 cu.m 55.22 23.01 78.23 492.41 246.21
2 .Earth work. 35 cu.m 28.00 1 cu.m 69.03 28.76 97.79 615.47 307.74
3 Manure or sludge 35cu.m 32.20 1 cu.m 60.03 25.01 85.04 535.22 267.61
4 Excavated rock. 35 cu.m 17.50 1 cu.m 110.45 46.02 156.47 984.83 492.42
5 Sand,stone agg.below 40mm size. 28 cu.m 28.00 1 cu.m 69.03 28.76 97.79 615.47 307.74
6 Stone agg.40mm & above,build. Stones. 28 cu.m 25.90 1 cu.m 74.63 31.09 105.72 665.34 332.67
7 Soling stone, stone block & stone for filling crates 28 cu.m 28.00 1 cu.m 69.03 28.76 97.79 615.47 307.74
Bricks. 15000 Nos 15000 1000 Nos. 128.86 53.69 182.55 1148.97 574.49
8
Bricks tiles. 24000 Nos. 24000 1000 Nos. 80.54 33.56 114.10 718.18 359.09
9
Slates. 80000 Nos. 80000 1000 Nos. 24.16 10.07 34.23 215.49 107.75
10
Terrazzo Tiles. 15000 Nos 15000 1000 Nos. 128.86 53.69 182.55 1148.97 574.49
11
Heavy material
A=9.2 Beldar @210 1932.00 B=(1932.00/2)+(1932.00*1.40)/2 2318.40
Stone blocks G.I,C.C. pipes below 100mm
1 46 Tonne 46.00 1 Tonne 50.40 21.00 71.40 449.40 224.70
dia & other heavy materials.
2 cement 57 Tonne 57.00 1 Tonne 40.67 16.95 57.62 362.72 181.36
3 Steel including C.G.I & asbestos sheet. 27 Tonne 27.00 1 Tonne 85.87 35.78 121.65 765.69 382.85
4 Timber 42 cu.m 42.00 1 cu.m 55.20 23.00 78.20 492.20 246.10
5 Tar Bitumen etc. 46 Tonne 46.00 1 Tonne 50.40 21.00 71.40 449.40 224.70
1 2 3 4 5 6 7 8 9 10 11
Concrete, R.C.C. Hume, steel C.I.Pipes:- 100mm
6 dia 1702m 1702 100m 136.22 56.76 192.98 1214.66 607.33
Executive Engineer,
IPH Division, Mandi.
Pipe da
Mech. Lead
50,65,80 100 125 150
1 99.75
2 115.10
3 130.28
4 145.04
5 159.09
6 172.09
7 198.09
8 237.09
9 289.09
10 354.09
11 364.93
12 386.61
13 419.13
14 462.49
15 516.69
16 581.73
17 657.61
18 744.33
19 841.89
20 950.29
21 959.38
22 977.56
23 1004.83
24 1041.19
25 1086.64
26 1141.18
27 1204.81
28 1277.53
29 1359.34
30 1450.24
31 1550.23
32 1659.31
33 1777.48
34 1904.74
35 2041.09
36 2186.53
37 2341.06
38 2504.68
39 2677.39
40 2859.19
41 3050.08
42 3250.06
43 3459.13
44 3677.29
45 3904.54
46 4140.88
47 4386.31
48 4640.83
49 4904.44
50 5177.14