CARRIAGE OF MATERIALS

Name of Work :- Augmentation of Water Supply Scheme to Mandi Town from Uhl River in Distt. Mandi (HP)

Storage Tank at Gard Nallah By Mech. Transport 1.3 KM

By Head Load 0.11 KM

1 Heavy Materials & GI pipe Unit : Per Tonne. 2 RCC,AC, Hume, Steel, Unit : Per 100 m.
below 100 mm C.I.Pipes 100 mm dia:-
LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.
By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 99.75 99.75 1 Km. 1 255.51 255.51
2 Km. 0 115.10 0.00 2 Km. 0 294.82 0.00
3 Km. 0 130.28 0.00 3 Km. 0 333.72 0.00
4 Km. 0 145.04 0.00 4 Km. 0 371.52 0.00
5 Km. 0 159.09 0.00 5 Km. 0 407.51 0.00
5- 10 Km. 0 13.00 0.00 5- 10 Km. 0 33.30 0.00
10-20 Km. 0 10.84 0.00 10-20 Km. 0 27.77 0.00
Beyond 20 Km. 0 9.09 0.00 Beyond 20 Km. 0 23.29 0.00
TOTAL : 99.75 TOTAL : 255.51
2 By Head load 2 By Head load
1st. 1 Km. 0 449.40 0.00 1st. 1 Km. 0 1214.66 0.00
1st. 100 Mtr 1 71.40 71.40 1st. 100 Mtr 1 192.98 192.98
Bey:1 Km.Per 1/2Km. 0 224.70 0.00 Bey:1 Km.Per 1/2Km. 0 607.33 0.00
Bey:100 Mtr Per 50 Mtr 0.1 21.00 2.10 Bey:100 Mtr Per 50 Mtr 0.1 56.76 5.68
Total : 73.50 Total : 198.66
G.Total: 1+2= 173.25 Per Tonne. G.Total: 1+2= 454.17 Per 100 m.
3 RCC,AC, Hume, Steel, Unit : Per 100 m. 4 RCC,AC, Hume, Steel, Unit : Per 100 m.
C.I.Pipes 125 mm dia:- C.I.Pipes 150 mm dia:-
LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.
By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 340.68 340.68 1 Km. 1 408.82 408.82
2 Km. 0 393.10 0.00 2 Km. 0 471.72 0.00
3 Km. 0 444.96 0.00 3 Km. 0 533.95 0.00
4 Km. 0 495.36 0.00 4 Km. 0 594.43 0.00
5 Km. 0 543.35 0.00 5 Km. 0 652.02 0.00
5- 10 Km. 0 44.40 0.00 5- 10 Km. 0 53.28 0.00
10-20 Km. 0 37.03 0.00 10-20 Km. 0 44.43 0.00
Beyond 20 Km. 0 31.06 0.00 Beyond 20 Km. 0 37.27 0.00
TOTAL : 340.68 TOTAL : 408.82
2 By Head load 2 By Head load
1st. 1 Km. 0 1486.22 0.00 1st. 1 Km. 0 1711.35 0.00
1st. 100 Mtr 1 236.12 236.12 1st. 100 Mtr 1 271.89 271.89
Bey:1 Km.Per 1/2Km. 0 743.11 0.00 Bey:1 Km.Per 1/2Km. 0 855.68 0.00
Bey:100 Mtr Per 50 Mtr 0.1 69.45 6.94 Bey:100 Mtr Per 50 Mtr 0.1 79.97 8.00
Total : 243.06 Total : 279.89
G.Total: 1+2= 583.74 Per 100 m. G.Total: 1+2= 688.71 Per 100 m.

Executive Engineer,
IPH Division, Mandi.
5 RCC,AC, Hume, Steel, Unit : Per 100 m. 6 RCC,AC, Hume, Steel, Unit : Per 100 m.
C.I.Pipes 200 mm dia:- C.I.Pipes 250 mm dia:-
LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.
By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 681.37 681.37 1 Km. 1 929.14 929.14
2 Km. 0 786.19 0.00 2 Km. 0 1072.08 0.00
3 Km. 0 889.92 0.00 3 Km. 0 1213.52 0.00
4 Km. 0 990.71 0.00 4 Km. 0 1350.97 0.00
5 Km. 0 1086.70 0.00 5 Km. 0 1481.87 0.00
5- 10 Km. 0 88.80 0.00 5- 10 Km. 0 121.09 0.00
10-20 Km. 0 74.05 0.00 10-20 Km. 0 100.98 0.00
Beyond 20 Km. 0 62.11 0.00 Beyond 20 Km. 0 84.70 0.00
TOTAL : 681.37 TOTAL : 929.14
2 By Head load 2 By Head load
1st. 1 Km. 0 2568.00 0.00 1st. 1 Km. 0 4513.68 0.00
1st. 100 Mtr 1 271.89 271.89 1st. 100 Mtr 1 717.12 717.12
Bey:1 Km.Per 1/2Km. 0 1284.00 0.00 Bey:1 Km.Per 1/2Km. 0 2256.84 0.00
Bey:100 Mtr Per 50 Mtr 0.1 120.00 12.00 Bey:100 Mtr Per 50 Mtr 0.1 210.92 21.09
Total : 283.89 Total : 738.21
G.Total: 1+2= 965.26 Per 100 m. G.Total: 1+2= 1667.35 Per 100 m.
7 RCC,AC, Hume, Steel, Unit : Per 100 m. 8 RCC,AC, Hume, Steel, Unit : Per 100 m.
C.I.Pipes 300 mm dia:- C.I.Pipes 350 mm dia:-
LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.
By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 1202.41 1202.41 1 Km. 1 1703.42 1703.42
2 Km. 0 1387.40 0.00 2 Km. 0 1965.48 0.00
3 Km. 0 1570.44 0.00 3 Km. 0 2224.80 0.00
4 Km. 0 1748.31 0.00 4 Km. 0 2476.78 0.00
5 Km. 0 1917.71 0.00 5 Km. 0 2716.76 0.00
5- 10 Km. 0 156.70 0.00 5- 10 Km. 0 221.99 0.00
10-20 Km. 0 130.68 0.00 10-20 Km. 0 185.13 0.00
Beyond 20 Km. 0 109.61 0.00 Beyond 20 Km. 0 155.28 0.00
TOTAL : 1202.41 TOTAL : 1703.42
2 By Head load 2 By Head load
1st. 1 Km. 0 5648.11 0.00 1st. 1 Km. 0 8075.09 0.00
1st. 100 Mtr 1 897.37 897.37 1st. 100 Mtr 1 1282.97 1282.97
Bey:1 Km.Per 1/2Km. 0 2824.06 0.00 Bey:1 Km.Per 1/2Km. 0 4037.55 0.00
Bey:100 Mtr Per 50 Mtr 0.1 263.93 26.39 Bey:100 Mtr Per 50 Mtr 0.1 377.34 37.73
Total : 923.76 Total : 1320.70
G.Total: 1+2= 2126.17 Per 100 m. G.Total: 1+2= 3024.12 Per 100 m.

Executive Engineer,
IPH Division, Mandi.
9 RCC,AC, Hume, Steel, Unit : Per 100 m. 10 RCC,AC, Hume, Steel, Unit : Per 100 m.
C.I.Pipes 400 mm dia:- C.I.Pipes 450/500 mm dia:-

LEAD : By Mech. 1.3 Km. LEAD : By Mech. 1.3 Km.


By Head : 0.105 Km. By Head : 0.105 Km.
1 By Mech. Nos. Rate/ Km. 1 By Mech. Nos. Rate/ Km.
1 Km. 1 2271.22 2271.22 1 Km. 1 2920.14 2920.14
2 Km. 0 2620.64 0.00 2 Km. 0 3369.40 0.00
3 Km. 0 2966.39 0.00 3 Km. 0 3813.93 0.00
4 Km. 0 3302.37 0.00 4 Km. 0 4245.90 0.00
5 Km. 0 3622.34 0.00 5 Km. 0 4657.30 0.00
5- 10 Km. 0 295.99 0.00 5- 10 Km. 0 380.56 0.00
10-20 Km. 0 246.84 0.00 10-20 Km. 0 317.37 0.00
Beyond 20 Km. 0 207.04 0.00 Beyond 20 Km. 0 266.20 0.00
TOTAL : 2271.22 TOTAL : 2920.14
2 By Head load 2 By Head load
1st. 1 Km. 0 9396.53 0.00 1st. 1 Km. 0 12528.64 0.00
1st. 100 Mtr 1 1492.91 1492.91 1st. 100 Mtr 1 1990.54 1990.54
Bey:1 Km.Per 1/2Km. 0 4698.27 0.00 Bey:1 Km.Per 1/2Km. 0 6264.32 0.00
Bey:100 Mtr Per 50 Mtr 0.1 439.09 43.91 Bey:100 Mtr Per 50 Mtr 0.1 585.45 58.54
Total : 1536.82 Total : 2049.08
G.Total: 1+2= 3808.04 Per 100 m. G.Total: 1+2= 4969.22 Per 100 m.
3 Heavy Materials & GI pipe Unit : Per Tonne.
below 100 mm
LEAD : By Mech. 15 Km.
By Head : 0.5 Km.
1 By Mech. Nos. Rate/ Km.
1 Km. 0 99.75 0.00
2 Km. 0 115.10 0.00
3 Km. 0 130.28 0.00
4 Km. 0 145.04 0.00
5 Km. 1 159.09 159.09
5- 10 Km. 5 13.00 65.00
10-20 Km. 5 10.84 54.20
Beyond 20 Km. 0 9.09 0.00
TOTAL : 278.29
2 By Head load
1st. 1 Km. 0 449.40 0.00
1st. 100 Mtr 1 71.40 71.40
Bey:1 Km.Per 1/2Km. 0 224.70 0.00
Bey:100 Mtr Per 50 Mtr 8 21.00 168.00
Total : 239.40
G.Total: 1+2= 517.69 Per Tonne.

Executive Engineer,
IPH Division, Mandi.
CARRIAGE OF MATERIAL BY MECHANICAL TRANSPORT
Sr. Average speed Km/hour(s) No.of Trips No.of Litre of Litre of Litres of Cost of Cost of 6 Hire Total cost Cost per Increase Average
No. No. Km. diesel Diesel @ M.Oil M.Oil @ Beldar @ Charges Col.No6+ trip in Cost cost per
Lead done consum-ed per Ltr. consum- per litre per day of Truck 8+9+10 per Km additional
in 2NL+6 ed @ per over Km.after
K.M. day previous five Km.
(L) Km.

52.93 280.00 210.00 2600


1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 12.00 5.65 17.30 5.77 305.41 0.22 61.60 1260 2600 4227.01 748.14
2 12.75 5.12 26.48 8.83 467.37 0.33 92.40 1260 2600 4419.77 863.24 115.10
3 13.12 4.69 34.14 11.38 602.34 0.43 120.40 1260 2600 4582.74 977.13 113.89
4 13.50 4.34 40.72 13.57 718.26 0.51 142.80 1260 2600 4721.06 1087.80 110.67
5 13.88 4.06 46.60 15.53 822.00 0.58 162.40 1260 2600 4844.40 1193.20 105.40
6 14.25 3.82 51.84 17.28 914.63 0.65 182.00 1260 2600 4956.63 1297.55 104.35
7 14.63 3.62 56.68 18.89 999.85 0.71 198.80 1260 2600 5058.65 1397.42 99.87
8 15.10 3.46 61.36 20.45 1082.42 0.77 215.60 1260 2600 5158.02 1490.76 93.34
9 15.38 3.31 65.58 21.86 1157.05 0.82 229.60 1260 2600 5246.65 1585.09 94.33
10 15.75 3.17 69.40 23.13 1224.27 0.87 243.60 1260 2600 5327.87 1680.72 95.63 97.50
11 16.13 3.06 73.32 24.44 1293.61 0.92 257.60 1260 2600 5411.21 1768.37 87.65
12 16.50 2.96 77.04 25.68 1359.24 0.96 268.80 1260 2600 5488.04 1854.07 85.70
13 16.88 2.87 80.62 26.87 1422.23 1.01 282.80 1260 2600 5565.03 1939.03 84.96
14 17.25 2.78 83.84 27.95 1479.39 1.05 294.00 1260 2600 5633.39 2026.40 87.37
15 17.63 2.71 87.30 29.10 1540.26 1.09 305.20 1260 2600 5705.46 2105.34 78.94
16 18.00 2.64 90.48 30.16 1596.37 1.13 316.40 1260 2600 5772.77 2186.66 81.32
17 18.38 2.58 93.72 31.24 1653.53 1.18 330.40 1260 2600 5843.93 2265.09 78.43
18 18.75 2.52 96.72 32.24 1706.46 1.21 338.80 1260 2600 5905.26 2343.36 78.27
19 19.13 2.47 99.86 33.29 1762.04 1.25 350.00 1260 2600 5972.04 2417.83 74.47
20 19.50 2.42 102.80 34.27 1813.91 1.29 361.20 1260 2600 6035.11 2493.85 76.02 81.31
21 19.88 2.38 105.96 35.32 1869.49 1.32 369.60 1260 2600 6099.09 2562.64 68.79
22 20.25 2.34 108.96 36.32 1922.42 1.36 380.80 1260 2600 6163.22 2633.85 71.21
23 20.63 2.30 111.80 37.27 1972.70 1.40 392.00 1260 2600 6224.70 2706.39 72.54
24 21.00 2.26 114.48 38.16 2019.81 1.43 400.40 1260 2600 6280.21 2778.85 72.46
25 21.38 2.23 117.50 39.17 2073.27 1.48 414.40 1260 2600 6347.67 2846.49 67.64
26 21.75 2.20 120.40 40.13 2124.08 1.51 422.80 1260 2600 6406.88 2912.22 65.73
27 22.13 2.17 123.18 41.06 2173.31 1.54 431.20 1260 2600 6464.51 2979.04 66.82
28 22.50 2.14 125.84 41.95 2220.41 1.57 439.60 1260 2600 6520.01 3046.73 67.69
29 22.88 2.11 128.38 42.79 2264.87 1.60 448.00 1260 2600 6572.87 3115.10 68.37
30 23.25 2.09 131.40 43.80 2318.33 1.64 459.20 1260 2600 6637.53 3175.85 60.75 68.20
CARRIAGE OF MATERIAL BY MECHANICAL TRANSPORT INCLUDING LOADING/UNLOADINGAND STACKING OF MATERIALS
S.No MATERIALS CAPACITY NET UNITS COST PER UNIT MATERIAL/DISTANCE GIVEN BELOW
QTY.TO
BE PAID 1 Km. 2Km. 3Km. 4Km. 5Km. BEYOND BEYOND BEYOND 20Km
AFTER 5Km.UP 10Km.UP /Km.
DEDUCTI TO 10 TO 20
ON OF Km. Km.
VOIDS.
748.14 863.24 977.13 1087.80 1193.20 97.50 81.31 68.20
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Lime, moorum , building rubish. 6 cu.m 6.00 1 cu.m 124.69 143.87 162.86 181.30 198.87 16.25 13.55 11.37

2 Earth work. 6 cu.m 4.80 1 cu.m 155.86 179.84 203.57 226.63 248.58 20.31 16.94 14.21

3 Manure or sludge 6 cu.m 5.52 1 cu.m 135.53 156.38 177.02 197.07 216.16 17.66 14.73 12.36

4 Excavated rock. 6 cu.m 3.00 1 cu.m 249.38 287.75 325.71 362.60 397.73 32.50 27.10 22.73
5 Sand,stone agg. below 40mm 5 cu.m 5.00 1 cu.m 149.63 172.65 195.43 217.56 238.64 19.50 16.26 13.64
Stone agg. 40 mm & above,
6 5 cu.m 4.62 1 cu.m 161.94 186.85 211.50 235.45 258.27 21.10 17.60 14.76
build. Stones.
Soling stone, stone block &
7 5 cu.m 4.25 1 cu.m 176.03 203.12 229.91 255.95 280.75 22.94 19.13 16.05
stone for filling crates
8 Bricks. 2000Nos. 2000 1000 Nos. 374.07 431.62 488.57 543.90 596.60 48.75 40.66 34.10

9 Bricks tiles. 3200Nos. 3200 1000 Nos. 233.79 269.76 305.35 339.94 372.88 30.47 25.41 21.31
10 Slates. 14450Nos. 14450 1000 Nos. 51.77 59.74 67.62 75.28 82.57 6.75 5.63 4.72
11 Terrazzo Tiles. 2500Nos. 2500 1000 Nos. 299.26 345.30 390.85 435.12 477.28 39.00 32.52 27.28
Cement G.I. CI. AC. CC pipes
12 below 100mm dia & other 7.50 Tonne 7.50 1 Tonne 99.75 115.10 130.28 145.04 159.09 13.00 10.84 9.09
heavy materials.
13 Steam Coal 5.5 Tonne 5.50 1 Tonne 136.03 156.95 177.66 197.78 216.95 17.73 14.78 12.40
14 Steel i/c C.G.I & A.C.sheet. 7.50 Tonne 7.50 1 Tonne 99.75 115.10 130.28 145.04 159.09 13.00 10.84 9.09
15 Timber 5 cu.m 5.00 1 cu.m 149.63 172.65 195.43 217.56 238.64 19.50 16.26 13.64
16 Tar Bitumen etc. 4.50 Tonne 4.50 1 Tonne 166.25 191.83 217.14 241.73 265.16 21.67 18.07 15.16
R.C.C.,A.C. Hume, steel
17 329.40m 329.40 100m 227.12 262.06 296.64 330.24 362.23 29.60 24.68 20.70
C.I.Pipes:- 80 mm dia
18 100 mm dia 292.80m 292.80 100m 255.51 294.82 333.72 371.52 407.51 33.30 27.77 23.29
19 125 mm dia 219.6m 219.60 100m 340.68 393.10 444.96 495.36 543.35 44.40 37.03 31.06
20 150 mm dia 183m 183.00 100m 408.82 471.72 533.95 594.43 652.02 53.28 44.43 37.27

21 200 mm dia 109.80m 109.80 100m 681.37 786.19 889.92 990.71 1086.70 88.80 74.05 62.11

22 250 mm dia 80.52m 80.52 100m 929.14 1072.08 1213.52 1350.97 1481.87 121.09 100.98 84.70

23 300 mm dia 62.22m 62.22 100m 1202.41 1387.40 1570.44 1748.31 1917.71 156.70 130.68 109.61

24 350 mm dia 43.92m 43.92 100m 1703.42 1965.48 2224.80 2476.78 2716.76 221.99 185.13 155.28

25 400 mm dia 32.94m 32.94 100m 2271.22 2620.64 2966.39 3302.37 3622.34 295.99 246.84 207.04

26 450 /500mmdia 25.62m 25.62 100m 2920.14 3369.40 3813.93 4245.90 4657.30 380.56 317.37 266.20

27 600,700,750&800mm dia 18.30m 18.30 100m 4088.20 4717.16 5339.51 5944.26 6520.22 532.79 444.32 372.68

28 900,1000,1100&1200mm dia 11.00m 11.00 100m 6801.27 7847.64 8883.00 9889.09 10847.27 886.36 739.18 620.00

Executive Engineer,
IPH Division, Mandi.
CARRIAGE OF MATERIAL BY MANUAL LABOUR INCLUDING LOADING/UNLOADINGAND STACKING OF MATERIALS
S.No MATERIALS CAPACITY NET UNITS COST OF COST OF CARRIGE INCLUDING LOADING AND STACCKING
QTY.TO BE
PAID
8 HOURS FOR FOR EVERY FOR 100 FOR 1 BEYOND Remarks
AFTER FIRST 50 ADD. LEAD
OF 50
MTR (Col KM. 1
DEDUCTIO MTR 7+8) (18*Co8+ KM./EVE
MTRS OR
N OF
VOIDS.
PART 9) RY 1/2
THERE OF KM.(50%
BEYOND 50
MTRS UP
of Co.10)
TO 0.50 KM

1 2 3 4 5 6 7 8 9 10 11 12
Light material A=(7.67Bel@ 210) 1610.70 B=(1610.70/2)+(1610.70*1.40)/2 1932.84
1 Lime, moorum and building rubish. 35 cu.m 35.00 1 cu.m 55.22 23.01 78.23 492.41 246.21
2 .Earth work. 35 cu.m 28.00 1 cu.m 69.03 28.76 97.79 615.47 307.74
3 Manure or sludge 35cu.m 32.20 1 cu.m 60.03 25.01 85.04 535.22 267.61
4 Excavated rock. 35 cu.m 17.50 1 cu.m 110.45 46.02 156.47 984.83 492.42
5 Sand,stone agg.below 40mm size. 28 cu.m 28.00 1 cu.m 69.03 28.76 97.79 615.47 307.74
6 Stone agg.40mm & above,build. Stones. 28 cu.m 25.90 1 cu.m 74.63 31.09 105.72 665.34 332.67
7 Soling stone, stone block & stone for filling crates 28 cu.m 28.00 1 cu.m 69.03 28.76 97.79 615.47 307.74
Bricks. 15000 Nos 15000 1000 Nos. 128.86 53.69 182.55 1148.97 574.49
8

Bricks tiles. 24000 Nos. 24000 1000 Nos. 80.54 33.56 114.10 718.18 359.09
9

Slates. 80000 Nos. 80000 1000 Nos. 24.16 10.07 34.23 215.49 107.75
10

Terrazzo Tiles. 15000 Nos 15000 1000 Nos. 128.86 53.69 182.55 1148.97 574.49
11

Heavy material
A=9.2 Beldar @210 1932.00 B=(1932.00/2)+(1932.00*1.40)/2 2318.40
Stone blocks G.I,C.C. pipes below 100mm
1 46 Tonne 46.00 1 Tonne 50.40 21.00 71.40 449.40 224.70
dia & other heavy materials.
2 cement 57 Tonne 57.00 1 Tonne 40.67 16.95 57.62 362.72 181.36
3 Steel including C.G.I & asbestos sheet. 27 Tonne 27.00 1 Tonne 85.87 35.78 121.65 765.69 382.85
4 Timber 42 cu.m 42.00 1 cu.m 55.20 23.00 78.20 492.20 246.10
5 Tar Bitumen etc. 46 Tonne 46.00 1 Tonne 50.40 21.00 71.40 449.40 224.70
1 2 3 4 5 6 7 8 9 10 11
Concrete, R.C.C. Hume, steel C.I.Pipes:- 100mm
6 dia 1702m 1702 100m 136.22 56.76 192.98 1214.66 607.33

Concrete, R.C.C. Hume, steel C.I.Pipes:-


7 1391m 1391 100m 166.67 69.45 236.12 1486.22 743.11
125mm dia
Concrete, R.C.C. Hume, steel C.I.Pipes:-
8 1208m 1208 100m 191.92 79.97 271.89 1711.35 855.68
150mm dia
Concrete, R.C.C. Hume, steel C.I.Pipes:-
9 805m 805 100m 288.00 120.00 408.00 2568.00 1284.00
200mm dia
Concrete, R.C.C. Hume, steel C.I.Pipes:-
10 458m 458 100m 506.20 210.92 717.12 4513.68 2256.84
250mm dia
11 Concrete, R.C.C. Hume, steel C.I.Pipes:- 366m 366 100m 633.44 263.93 897.37 5648.11 2824.06
300mm dia
12 Concrete, R.C.C. Hume, steel C.I.Pipes:- 256m 256 100m 905.63 377.34 1282.97 8075.09 4037.55
350mm dia
Concrete, R.C.C. Hume, steel C.I.Pipes:-
13 220m 220 100m 1053.82 439.09 1492.91 9396.53 4698.27
400mm dia
Concrete, R.C.C. Hume, steel C.I.Pipes:-
14 165m 165 100m 1405.09 585.45 1990.54 12528.64 6264.32
450mm,500mm dia
Concrete, R.C.C. Hume, steel C.I.Pipes:-
15 150m 150 100m 1545.60 644.00 2189.60 13781.60 6890.80
600,700,750&800mm dia
Concrete, R.C.C. Hume, steel C.I.Pipes:-
16 900,1000,1100&1200mm dia 125m 125 100m 1854.72 772.80 2627.52 16537.92 8268.96
Asbestes cement pipes: - 50mm dia
17 10064m 10064 100m 23.04 9.60 32.64 205.44 102.72
=5032 pipes of 2m length 10064m
As bestes cement pipes: - 80mm dia 1620
18 pipes of 2m length=3660 3660m 3660 100m 63.34 26.39 89.73 564.75 282.38

As bestes cement pipes:- 100mm dia


19 1281 pipes of 2m length=2562m 2562m 2562 100m 90.49 37.70 128.19 806.79 403.40

As bestes cement pipes:- 125mm dia


20 1100 pipes of 2m length= 2200m 2200m 2200 100m 105.38 43.91 149.29 939.67 469.84

As bestes cement pipes:- 150mm dia 915


21 1830m 1830 100m 126.69 52.79 179.48 1129.70 564.85
pipes of 2m length =1830m
As bestes cement pipes:- 200mm dia 800
22 pipes of 2m length= 1600m 1600m 1600 100m 144.90 60.38 205.28 1292.12 646.06

As bestes cement pipes:- 250mm dia 700


23 pipes of 2m length= 1400m 1400m 1400 100m 165.60 69.00 234.60 1476.60 738.30

As bestes cement pipes:- 300mm dia 600


24 pipes of 2m length= 1200m 1200m 1200 100m 193.20 80.50 273.70 1722.70 861.35

Executive Engineer,
IPH Division, Mandi.
Pipe da
Mech. Lead
50,65,80 100 125 150
1 99.75
2 115.10
3 130.28
4 145.04
5 159.09
6 172.09
7 198.09
8 237.09
9 289.09
10 354.09
11 364.93
12 386.61
13 419.13
14 462.49
15 516.69
16 581.73
17 657.61
18 744.33
19 841.89
20 950.29
21 959.38
22 977.56
23 1004.83
24 1041.19
25 1086.64
26 1141.18
27 1204.81
28 1277.53
29 1359.34
30 1450.24
31 1550.23
32 1659.31
33 1777.48
34 1904.74
35 2041.09
36 2186.53
37 2341.06
38 2504.68
39 2677.39
40 2859.19
41 3050.08
42 3250.06
43 3459.13
44 3677.29
45 3904.54
46 4140.88
47 4386.31
48 4640.83
49 4904.44
50 5177.14