ROAD METAL RATES REGISTER
Name of Division : C.D. Build, P.W.D., Kanpur Nagar.

Name of Road : vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp ejEer dk dk;ZA

Distt. : KANPUR (Nagar) Unit : Per Cubic Metre

Number Distance Cont.’s


Name Stackin Total of Wastage Total of Sales Total of Rates
Sl. of Rate at from quarry Cost of Toll Profit
of g Column on Col.8 Col.No. Tax @ Col.No. Rounded to Remarks
No. Kilomete Quarry to site (in Cartage Tax 4%
Quarry Charges 4+6+7 @ 1% 8 to 11 12 & 13 10paise
r Kms) @ 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Collection of 45 - 63 mm Stone Ballast Kabrai to Jarib Chauki 1 +120
. =
1 Km. 1 Kabrai 699.00 1 + 184 1460.91 0.00 2159.91 0.00 - 0.00 2159.91 0.00 2159.91 2159.90 Jarib Chauki to Bilhaur
Collection of 22.4 - 53 mm Stone Ballast (Machine Broken) Bilhaur to site
2 Km. 1 Kabrai 801.00 1 + 184 1460.91 0.00 2261.91 0.00 - 0.00 2261.91 0.00 2261.91 2261.90
Stone Dust Total Distance =
3 Km. 1 Kabrai 495.00 1 + 184 1460.91 0.00 1955.91 0.00 - 0.00 1955.91 0.00 1955.91 1955.90 Cartage upto Site
Collection of 13.2 stone grit Upto 100.00 KM =
4 Km. 1 Kabrai 1037.00 1 + 184 1460.91 0.00 2497.91 0.00 - 0.00 2497.91 0.00 2497.91 2497.90 101.00 to 185.00 85.00 × 7.00 =
Collection of 11.2& 10 mm Stone Grit For 1 km kachcha =
5 Km. 1 Kabrai 993.00 1 + 184 1460.91 0.00 2453.91 0.00 - 0.00 2453.91 0.00 2453.91 2453.90 =
Collection of 19 & 20 mm Less 1607.00 / 1.10
6 Km. 1 Kabrai 1307.00 1 + 184 1460.91 0.00 2767.91 0.00 - 0.00 2767.91 0.00 2767.91 2767.90 Rate withour CP
Collection of 6.7 mm Stone Grit
7 Km. 1 Kabrai 548.00 1 + 184 1460.91 0.00 2008.91 0.00 - 0.00 2008.91 0.00 2008.91 2008.90 Distance from Hamirpur 1.00 +
Collection of 40 mm Stone Grit Total Distance =
8 Km. 1 Kabrai 784.00 1 + 184 1460.91 0.00 2244.91 0.00 - 0.00 2244.91 0.00 2244.91 2244.90 Cartage upto Site
Collection of Screning Material Type "B" Upto 100.00 KM =
9 Km. 1 Kabrai 537.00 1 + 184 1460.91 0.00 1997.91 0.00 - 0.00 1997.91 0.00 1997.91 1997.90 100.00 to 125.00 25.00 × 7.00 =
Coarse sand For 1 km kachcha =
10 Km. 1 Hamirpur 877.00 1 + 124 1079.09 - 1956.09 - - - 1956.09 0.00 1956.09 1956.10 =
Certified that : Less 1187.00 / 1.10
1. The shortest route has been adopted in the RMR. (Rates checked) Rate withour CP
2. The quarry rates are sanctioned by the Circle, L.N.V.
3. The minimum rates has been taken in comparison with other R.M.R. rates. Recommended for
4. Calculation of Rate is taken where approved querry rates comes to lowest at working place.
5- ,xzhxsV njksa dh x.kuk ml vuqeksfnr Dosjh ls dh x;h gSa] tgk¡ ls dk;ZLFky ij ,xzhxsV dh njsa U;wure vkrh gSaA

JUNIOR ENGINEER ASSISTANT ENGINEER EXECUTIVE ENGINEER


RMR
CD. Build, PWD, Kanpur Nagar CD. Build, PWD, Kanpur Nagar CD. Build, PWD, Kanpur Nagar

RMR
TAL RATES REGISTER

ekxZ fdeh0 1¼150½ ij iSp ejEer dk dk;ZA

Remarks

16
121.00
53.00
11.00

185.00

997.00
595.00
15.00
1607.00
1460.91
1460.91

124.00
125.00

997.00
175.00
15.00
1187.00
1079.09
1079.09

RMR
vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp ejEer dk dk;ZA
Ref. to
Sr
MORD Description Unit Quantity Rate Rs Cost Rs
No
spec.
4.1 By Mix in Place Method
401 Construction of granular sub-base by providing well graded
material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator
at OMC, and compacting with vibratory roller to achieve the
desired density, complete as per clause 401

Unit = cum
Taking output = 300 cum
a) Labour
Mate day 0.48 260.00 124.80
Mazdoor skilled day 2.00 250.00 500.00
Mazdoor unskilled day 10.00 240.00 2400.00
Total 3024.80
b) Machinery
Motor Grader 110 HP @ 50 cum per hour hour 6.00 1545.00 9270.00
Three wheel 80-100 Kn static roller @10 cum per hour hour 30.00 297.00 8910.00
Tractor with Rotavtor 25 cum per hour hour 12.00 245.00 2940.00
Water tanker 6 KL capacity hour 5.00 234.00 1170.00
add 75% for escalation 16717.50
Total 39007.50
c) Material
Well graded Granular sub-base Material as per table 400-1
For grading 1st Material
53 mm to 9.50 mm @ 50 % (Avg. 22.4-53mm+10mm)/2 cum 192.00 2357.90 452716.80
9.50 mm to 2.36 mm @ 20 % (Avg. 10mm+6.7mm)/2 cum 77.00 2231.40 171817.80
2.36 mm below @ 30 % (Stone dust) cum 115.00 1955.90 224928.50
Cost of water KL 30.00 50.00 1500.00
Total 850963.10
(i) Rate per cum for grading-I Material
d) Add over head charges & contractor profit 892995.40 111624.43
@ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d 1004619.83
Rate per cum = (a+b+c+d)/300 3348.73
say Rs. 3348.70

J.E. A.E. E.E.


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar
vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp ejEer dk dk;ZA
Ref. to
Sr
MORD Description Unit Quantity Rate Rs Cost Rs
No
spec.
4.7 WBM Grading 2
405 Providing, laying, spreading and compacting (7.5 cm compacted
thickness) stone aggregates of 45-63mm sizes to water bound
macadam (WBM-2) specification including spreading of in
uniform thickness hand packing, rolling with smooth wheeled
roller 8-10 kN in stages to proper grade and camber, applying and
brooming, stone screening (Type-B)/ binding materials to fill-up
the interstices of coarse aggregate, watering and compacting to
the required density Grading-2 as per Technical Specification
clause 405.

Unit = cum
Taking output = 360 cum
a) Labour
Mate day 10.08 260.00 2620.80
Mazdoor skilled day 2.00 250.00 500.00
Mazdoor unskilled day 250.00 240.00 60000.00
Total 63120.80
b) Machinery
Three wheel 80-100 Kn static roller @ 8 cum per hour hour 45.00 297.00 13365.00
Water tanker 6 KL capacity hour 24.00 234.00 5616.00
add 75% for escalation 14235.75
Total 33216.75
c) Material
(Refer Table 400.7,8,9 and 10)
aggregate
Grading 2 - 63 mm to 45 mm @ 0.91 cum. per 10 sqm. for cum 435.60 2159.90 940852.44
compacted thickness of 75 mm
Stone Screenings
Type B sceening material for grading 2 @ 0.20 cum. per 10 cum 96.01 1955.90 187785.96
sqm.
Cost of water KL 144.00 50.00 7200.00
Total 1135838.40
Rate per cum for grading-I Material
d) Add over head charges & contractor profit 1232175.95 154021.99
@ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d 1386197.94
Rate per cum = (a+b+c+d)/360 3850.55
say Rs. 3850.50

J.E. Assistant Engineer Executive Engineer


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar
vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp ejEer dk dk;ZA
Ref. to
Sr
MORD Description Unit Quantity Rate Rs Cost Rs
No
spec.
4.7 WBM Grading 3
405 Providing, laying, spreading and compacting (7.5 cm compacted
thickness) stone aggregates of 22.4-53 mm sizes to water bound
macadam (WBM-3) specification including spreading of in
uniform thickness hand packing, rolling with smooth wheeled
roller 8-10 kN in stages to proper grade and camber, applying and
brooming, stone screening (Type-B)/ binding materials to fill-up
the interstices of coarse aggregate, watering and compacting to
the required density Grading-3 as per Technical Specification
clause 405.

Unit = cum
Taking output = 360 cum
a) Labour
Mate day 10.08 260.00 2620.80
Mazdoor skilled day 2.00 250.00 500.00
Mazdoor unskilled day 250.00 240.00 60000.00
Total 63120.80
b) Machinery
Three wheel 80-100 Kn static roller @ 8 cum per hour hour 45.00 297.00 13365.00
Water tanker 6 KL capacity hour 24.00 234.00 5616.00
add 75% for escalation 14235.75
Total 33216.75
c) Material
(Refer Table 400.7,8,9 and 10)
aggregate
Grading 3 - 53 mm to 22.5 mm @ 0.91 cum. per 10 sqm. cum 435.60 2261.90 985283.64
for compacted thickness of 75 mm
Stone Screenings
Type B screaning material for grading 3 @ 0.20 cum. per 10 cum 86.40 1955.90 168989.76
sqm.
Cost of water KL 144.00 50.00 7200.00
Total 1161473.40
Rate per cum for grading-I Material
d) Add over head charges & contractor profit 1257810.95 157226.37
@ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d 1415037.32
Rate per cum = (a+b+c+d)/360 3930.66
say Rs. 3930.60

J.E. Assistant Engineer Executive Engineer


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar
Analysis of Rate for Bitumen / Emulsion
As per date 01.05.2017
Taking Unit - 1 M.T.
Sl. Bitumen 80/100 Bitumen 60/70 Emulsion Emulsion
Rate CRMB-55
No. (VG - 10) (VG - 30) (S Setting) (M Setting)
1 2 4 3 5 6 4

1 Basic Rate 24753.00 26353.00 25523.00 0.00 29693.00

2 Excise Duty@14% 3465.42 3689.42 3573.22 0.00 4157.02

3 28218.42 30042.42 29096.22 0.00 33850.02

4 Entry tax @2% 495.06 527.06 0.00 0.00 593.86

5 VAT(12.5%+2%) on Bitumen 4091.67 4356.15 - - 4908.25

6 VAT(5.25%) on Emulsion - - 1527.55 0.00 -

Cartage from Mathura Both side


7 1162.32 0.00 - - 0.00
'668Km.@Rs.1.74/Km./Tonne
Cartage from Panipat Single side
8 - - 1000.50 0.00 -
'575Km.@Rs.1.74/Km./Tonne

33967.47 34925.63 31624.27 0.00 39352.13

Say Rs. 33950.00 34900.00 31600.00 0.00 39350.00

JUNIOR ENGINEER ASSISTANT ENGINEER EXECUTIVE ENGINEER


C.D.Build, P.W.D., C.D.Build, P.W.D.,
KANPUR NAGAR KANPUR NAGAR
Tack Coat

Ref. to
Sl. No. MORD Description Unit Quantity Rate Rs Cost Rs
spec.
5.2 503 Tack Coat
Providing and applying tack coat with Bitumen
(VG-10) using bitumen distributor at the rate of
0.35 kg. per sqm on the prepared granular
surfaces treated with primer and cleaned with
hydraulic broom as per technical specification
clause 503

Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day 0.040 260.00 10.40
Mazdoor day 1.000 240.00 240.00
250.40
b) Machinery
Hydrolic broom @ 1250 dqm. per hour hour 1.400 0.00 0.00
Air compressor 250 cfm hour 1.400 206.00 288.40
Bitumen pressure distributor @ 1750 sqm hour 1.000 692.00 692.00
per hour
add 75% for escalation 735.30
1715.70
c) Material
Bitumen (VG-10) @ 0.35 kg per sqm tonne 0.610 33950.00 20709.50
d) Add over head charges & contractor 1966.10 245.76
profit @ 12.5% on (a+b+c)
(excluding cost of emulsion)
Cost for 1750 sqm = a+b+c+d 22921.36
Rate per sqm = (a+b+c+d)/1750 13.10
say Rs. 13.10

J.E. A.E. E.E.


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar
Primer Coat With S.S. Bitumen Emulsion

Ref. to
Sr No MORD Description Unit Quantity Rate Rs Cost Rs
spec.
5.1 502 Prime Coat (Low Porosity)
Providing and applying primer coat with bitumen
emulsion (SS-1) on prepared surface of granular
Base including clearing of road surface and
spraying primer at the rate of 0.70 kg/sqm using
mechanical means. clause 502
Unit = sqm
Taking output = 1750sqm
a) Labour
Mate day 0.040 260.00 10.40
Mazdoor day 1.000 240.00 240.00
250.40
b) Machinery
Hydrolic broom @ 1250 dqm. per hour hour 1.400 230.00 322.00
Air compressor 210 cfm hour 1.400 206.00 288.40
Emulsion pressure distributor @ 1750 sqm hour 1.000 516.00 516.00
per hour
Water tanker 6 KL capacity @ 1 trip per hour 0.500 234.00 117.00
hour
add 75% for escalation 932.55
2175.95
c) Material
Bitumen emulsion (SS-1) @ 0.70 kg per tonne 1.225 31600.00 38710.00
sqm
Cost of water KL 3.000 50.00 150.00
38860.00
d) Add over head charges & contractor 2576.35 322.04
profit @ 12.5% on (a+b+c)
(excluding cost of emulsion)
Cost for 1750 sqm = a+b+c+d 41608.39
Rate per sqm = (a+b+c+d)/1750 23.78
say Rs. 23.80

J.E. A.E. E.E.


ANALYSIS OF RATE
PREMIX CARPET
vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp ejEer dk dk;ZA
Sl. Reference to Rate
No. MORD Description Unit Qty. (Rs.) Amount
Specifications
5.9 508 Open Graded Premix Surfacing
Providing, laying and rolling of open-graded premix carpet of 20
mm thickness compesed of 13.2 mm to 5.6 mm aggregates
either using viscosity grade bitumen or emulsion to required
line, grade and level to serve as wearing course on a previously
prepared base, including mixing by HMP laying with paver
finisher and rolling with a three wheel 80-100 kN static roller
capacity, finished to required level and grades with paver
finisher to be following by Seal Coat of Type-C as per Technical
Specification Clause 508. of MORD

Case - II By Mechanical Means


Bitumen (S-90)/(VG-10)
Unit = Sqm.
Taking output = 4000 sqm (80 cum)
(a) Labour
(i) Mate Day 0.52 260.00 135.20
(ii) Mazdoor (Unskilled) Day 10.00 240.00 2400.00
(iii) Mazdoor (Skilled) Day 3.00 250.00 750.00
Total (a) 3285.20
(b) Machinery
(i) HMP 30/40 t per hour hour 6.00 7150.00 42900.00
(ii) Electric generator set 125 KVA hour 6.00 450.00 2700.00
(iii) Front end loader 1 cum bucket capacity hour 6.00 520.00 3120.00
(iv) Tipper 5.5 10 t capacity hour 3.64 200.00 728.00
(v) Paver finisher hour 6.00 629.00 3774.00
(vi) Three wheel 80-100 kN static roller hour 16.00 297.00 4752.00
57974.00
Add : @75% extra for escalation in rates.as per E in C 43480.50
Circular no6521 M.T./60M.T./2012-13 dated : 27.7.2012
Total (b) 101454.50
(c) Material
(i) Bitumen (S-90) @ 14.60 kg per 10 sqm t 5.84 33950.00 198268.00
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
(ii) per 10 sqm
Crushed stone chipping, 13.2 mm @ 0.18 cum per 10 sqm cum 72.00 2497.90 179848.80
Crushed stone chipping, 11.2 mm @ 0.09 cum per 10 sqm cum 36.00 2453.90 88340.40
Total( c ) 466457.20
(d) Add over head charges & contractor profit @ 12.5% on (a+b+c)
(excluding cost of Bitumen)
372928.90 46616.11
Total (a+b+c+d) 617813.01
Rate For Per SqM=(a+b+c+d)/4000 154.45
Say Rs. 154.40

J.E. A.E. E.E.


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar

PC plant
ANALYSIS OF SEAL COAT
vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp ejEer dk dk;ZA
Sl. Reference to Rate
No. MORD Description Unit Qty. (Rs.) Amount
Specifications
5.12 510 Seal Coat (Type-C)
III Providing and laying Seal Coat sealing the voids in a
bituminous surface laid to the specified levels, grade and cross
fall with hydrolic self propelled chips spreader using Type C
by HMP laying with paver finisher as per Technical
Specification Clause 510 of MORD
Case - III : Type C
Bitumen (S-90)/(VG-10)
Unit = Sq. Mt.
Taking output = 7500 sqm (67.5 cum)
(a) Labour
Mate Day 0.20 260.00 52.00
Mazdoor (Semi skilled) Day 5.00 240.00 1200.00
Total (a) 1252.00
(b) Machinery
Hydraulic self propelled chips spreader hour 6.00 1700.00 10200.00
Tipper 5.5 cum capacity hour 6.00 200.00 1200.00
Front end loader 1 cum bucket capacity hour 6.00 520.00 3120.00
Bitumen pressure distributor hour 6.00 692.00 4152.00
Three wheel 80-100 kN static roller hour 15.00 297.00 4455.00
23127.00
Add : @75% extra for escalation in rates.as per E in C 17345.25
Circular no6521 M.T./60M.T./2012-13 dated : 27.7.2012

Total (b) 40472.25


(c) Material
Bitumen (VG-10) @ 6.50 kg. per 10 sqm. tonne 4.880 33950.00 165676.00

Crushed stone chipping of 6.7 mm size 100 per cent


passing 9.5 mm sieve and retained on 2.36 mm sieve cum 67.50 2008.90 135600.75
applied @ 0.09 cum per 10 sqm Type-C
Total ( C ) 301276.75
d) Add over head charges & contractor 177325.00 22165.63
profit @ 12.5% on (a+b+c) (excluding cost of Bitumen)
Total (a+b+c+d) 365166.63
Rate per sq mt. (a+b+c+d)/7500 48.69
Say Rs. 48.60
Per Sqm.

J.E. A.E. E.E.


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar

SealCoat Plant
ANALYSIS OF SEAL COAT

Sl. Reference to Rate


No. MORD Description Unit Qty. (Rs.) Amount
Specifications
5.12 510 Seal Coat (Type-C)
(I)
Providing and laying Seal Coat sealing the voids in a
bituminous surface laid to the specified levels, grade and cross
fall using Type C as per Technical Specification Clause 510

Bitumen (S-90)/(VG-10)
Unit = Sq. Mt.
Taking output = 1100 sq mt
(a) Labour
Mate Day 1.15 260.00 299.00
Bitumen sprayer Day 1.00 240.00 240.00
Mazdoor (Unskilled) Day 22.00 240.00 5280.00
Mazdoor (Semi skilled) Day 5.00 240.00 1200.00
Total (a) 7019.00
(b) Machinery
Bitumen boiler oil fired capacity 1000 litre fitted with Hour 2.20 128.00 281.60
spray set
Three wheel 8-10 kN static roller Hour 2.20 297.00 653.40
add 75% for escalation 701.25
Total (b) 1636.25
(c) Material
Bitumen (VG-10) @ 6.50 kg. per 10 sqm. tonne 0.715 33950.00 24274.25
Crushed Stone Chipping of 6.7 mm size 100 %
passing 9.5 mm sieve and retained on 2.36 mm
sieve applied @ 0.09 cum per 10 sqm Type-C cum 9.90 2008.90 19888.11
Total ( C ) 44162.36
d) Add over head charges & contractor 28543.36 3567.92
profit @ 12.5% on (a+b+c) (excluding cost of Bitumen)
Total (a+b+c+d) 56385.53
Rate per sq mt. (a+b+c+d)/1100 51.26
Say Rs. 51.20

J.E. A.E. E.E.


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar

SealCoat
ANALYSIS OF RATE

Sl. Reference to Rate


No. MORTH Description Unit Qty. (Rs.) Amount
Specifications
11.2 New Edging with M-150 bricks,laid day lengthwide edging with M-
150 class bricks, laid day lengthwise, including excavation,
refilling consolidation, with a hand packing and spreading
nearly surplus earth within a lead of 50 meter.

Unit = Meter
Taking output = 10 meter
a) Labour
Mate day 0.002 260.00 0.52
Mazdoor (Unskilled) day 0.05 240.00 12.00
Mason Ist class day 0.05 380.00 19.00
31.52
b) Material
Brick M-150 No. 43.000 6.18 265.74
265.74

c) Add contractor profit @ 12.5% on (a+b) 12.5% 297.26 37.16


37.16
Cost for 10 meter = (a+b+c) 334.42
Cost for 1 meter = (a+b+c)/10 33.4417500
Rate per Kilometer (both side) meter 2000.00 66883.50
say 65000.00
Per Km.

J.E. Assistant Engineer Executive Engineer


C.D Build., P.W.D., Kanpur Nagar C.D Build., P.W.D., Kanpur Nagar

Sehgal/503927082.xls Brick Edging 14


Referenc
e of
Sr. Rate Amount
MORD Discriptions Unit Quantity
No. (Rs.) (Rs.)
Specifica
tions
6.4 1500 Cement Concrete Pavement
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any
other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383,
maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than
0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side
formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates
including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted
using needle, screed and plate vibrators and finished in continuous operation including provision of
contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars,
near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete
slabs for 14-days,

using curing compound


(where specified) and
Unit = cum
water
Takingfinishing
output =to75
lines
cum (172.50 t)
and grade as per
(100 x 3.75 x 0.200)
drawing and Technical
a) Labour
Specification Clause
Mate
1501 day 7.00 225.00 1,575.00
Mason (1st class) day 5.00 320.00 1,600.00
Mason (2nd class) day 5.00 290.00 1,450.00
Mazdoor (Unskilled) day 129.00 212.00 27,348.00
Mazdoor (Skilled) day 6.00 220.00 1,320.00
Surveyer day 2.00 212.00 424.00
Mazdoor (Semi-Skilled) day 6.00 212.00 1,272.00
Bhisti day 14.00 250.00 3,500.00
Blacksmith for cutting of dowel bars including day 1.00 310.00 310.00
38,799.00
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) hour 36.00 150.00 5,400.00
Needle vibrator hour 9.00 75.00 675.00
Screed vibrator hour 9.00 75.00 675.00
Plate vibrator hour 9.00 75.00 675.00
Concrete joint cutting machine for initial & final cuts hour 4.00 300.00 1,200.00
Water tanker 6 kl capacity hour 5.00 234.00 1,170.00
Air Compressor (1 hour initial + 1 hour final) hour 2.00 206.00 412.00
10,207.00
Add : @70% extra for escalation in rates.as per E in C 7144.90
Circular no6521 M.T./60M.T./2012-13 dated : 27.7.2012
(2001-02)
Total C 17351.90
c) Material
(i) Crushed stone coarse aggregates, grading will be cum 67.50 2,767.90 186,833.25
as per Clause 1501.2.4.1 (Table 1500.1) of
specifications @ 0.90 cum/cum of concrete
(ii) Sand as per IS:383 and conforming to Clause cum 33.75 1,956.10 66,018.38
1500.2.4.2 @ 0.45 cum/cum of concrete
(iii) Cement @ 310 kg/cum of concrete t 26.25 5,800.00 152,250.00
(iv) Polythene sheet 125 micron sqm 412.50 10.00 4,125.00
(v) Mild steel dowel bar 25 mm dia of grade S 240.
500 mm long 20 Nos. at culvert/bridge slab and at
construction joint including 5 per cent wastage.
(4 x 20 x 0.500) + 5 per kg 117.60 35.80 4,210.08
cent wastage
Bitumen primer= 42 m ml per joint for 23 joints
@ 200 t 0.005 28,900.00 144.50
@ 2.80 kg per m =
Bituminous sealant 800 ml per joint for 23 joints litre 19.00 28.90 549.10
117.6 kg. 12 mm dia including 5 per cent wastage
Jute rope m 90.00 0.00 0.00
Referenc
e of
Sr. Rate Amount
MORD Discriptions Unit Quantity
No. (Rs.) (Rs.)
Specifica
tions
Debonding strips 3.75 m (length) x 10 mm (width) m 90.00 35.00 3,150.00
x 5 mm (thick) cut-out of rubber filler board or
similar material including 5 per cent wastage
Polythene sheathing, covering 2/3rd dowel bars No. 483.00 5.00 2,415.00
(20x23) and tight fit including 5 per cent wastage
Plasticizer 0.5 per cent by weight of cement litre 122.00 100.00 12,200.00
Curing compound (if used) @ 0.33 litre per sqm litre 131.25 0.00 0.00
Water for curing kl 18.00 50.00 900.00
Joint filler board 20 mm thick as per IS:1838 sqm 3.00 100.00 300.00
(4 x 3.75 x 0.200 = 3 sqm)
433,095.31
d) Formwork @ 3% of (a+b+c) 14,677.39
e) Overheads & C.P. @ 12.5% on (a+b+c+d) 62,990.45
Cost for 75 cum = a+b+c+d+e 566,914.04
Rate per cum = (a+b+c+d+e)/75 7,558.00

J.E. A.E. E.E.


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar
Analaysis of Rates ( 600 MM dia NP3. Hume Pipe Culvert )
For 7.5 Rmt.

Sl. No. Item of work No. L B D Qty Unt Rate


1 Excavation in foundation
(A) Below Parapet 1x2 3.60 1.55 1.68 18.75
(B)Below Pipe 1x1 4.70 1.53 0.50 3.60
22.34 Cum. 85.00
2 1:4:5 C.C. with 40 mm stone ballast
(A) Below Parapet 1x2 3.60 1.55 0.15 1.67
2 x 1/2 x 0.40 x 0.40 x 6.04= 0.97
2.64 4600.00

3 B/W 1:3 C.M. 1x2 3.30 (1.25+0.40)/2 2.03 11.05


1x2 3.30 0.40 0.60 0.79
11.85
Deduction for pipe 1 x 2 x 22/7x(0.80x0.80)/4 x(0.40+0.73)/2= 1 x 2 0.57 0.57 0.65
12.50 Cum. 5200.00
4 Supply & Laying of NP3 Hume Pipe 1x3 2.50 -- -- 7.50 RM 2600.00

5 Flush Pointing 1:3


Road site face 1x2 3.30 0.60 - 3.96
Outer site face 1x2 3.30 1.40 - 9.24
Parapet site 2x2 0.40 0.60 - 0.96
14.16
Deduction for pipe both ends 1x2 0.57 - - -1.14
13.02 Sqm. 140.00

6 15 mm Cement palaster in 1:4 2x2 - 0.40 0.40 0.64 Sqm. 140.00

7 P.C.C. in 1:2:4 with stone sggregate 20 mm 1x2 0.35 0.40 0.025 0.01 Cum. 5800.00

Say Rs.

J.E A.E E.E


Total

1899.27

12162.40

64974.78
19500.00

1822.80

89.60

40.60

100489.45
100000.00
ANALYSIS OF RATE

Ref.
to
Sr
MOR Description Unit Quantity Rate Rs Cost Rs
No
D
spec.
3.14 303.1 Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material
obtained from borrow pits with all lifts and leads, transporting to site,
spreading, grading to required slope and compacted to meet requirement
of Table 300.2 with lead upto 1000 m as per Technical Specification
Clause 303.1.

Unit = cum
Taking output = 100 cum
a) Labour
Mate day 0.04 260.00 10.40
Mazdoor (Unskilled) day 1.00 240.00 240.00
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100 cum per hour 1.00 840.00 840.00
hour
Tipper 5.5 cum capacity, 4 trips per hour hour 4.50 0.00 0.00
Add rate for loading as per item 1.1 (ii) cum 100.00 0.00 0.00
Add rate for unloading as per item 1.1 (iv) cum 100.00 0.00 0.00
Dozer D-50 for spreading @ 200 cum per hour hour 0.50 1,423.00 711.50
Motor grader for grading @ 200 cum per hour hour 0.50 1,545.00 772.50
Water tanker with 6 kl capacity hour 2.00 0.00 0.00
Three wheel 80-100 kN Static Roller @ 70 cum per hour hour 1.43 0.00 0.00
Add escalation 75% 1,743.00
c) Material
Water kl 12.00 0.00 0.00
Compensation for earth taken from private land cum 100.00 0.00 0.00
d) Overheads & contracor profit @ 12.5% on (a+b+c) 539.68
Cost for 100 cum = a+b+c+d 4,857.08
Rate per cum = (a+b+c+d+e)/100 48.57
Add Rs. 30.00 for Rayalty 30.00
78.57
Say Rs. 78.00

J.E. Assistant Engineer Executive Engineer


C.D. Build., P.W.D. Kanpur Nagar C.D. Build., P.W.D. Kanpur Nagar

Sehgal/503927082.xls Patri Earth work 19


Detail of Measurment
Name of Work

vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp ejEer dk dk;ZA

Sl
Item of work No. L B D Quantity Unit
No.
1 2 3 4 5 6 7 8

Providing, laying, spreading and compacting stone aggregates of 22.4-53


mm sizes to water bound macadam (WBM-3) specification including
spreading of in uniform thickness hand packing, rolling with smooth
1 wheeled roller 8-10 kN in stages to proper grade and camber, applying and 1 3.2% 150.00 3.00 0.050 0.72 Cum
brooming, stone screening (Type-B)/ binding materials to fill-up the
interstices of coarse aggregate, watering and compacting to the required
density Grading-3 as per Technical Specification clause 405.

Providing and applying primer coat with bitumen emulsion (SS-1) on


prepared surface of granular Base including clearing of road surface and
2 spraying primer at the rate of 0.70 kg/sqm using mechanical means. clause
1 3.2% 150.00 3.00 - 14.40 Sqm.
502

Providing and applying tack coat with Bitumen (VG-10) using bitumen
distributor at the rate of 0.35 kg. per sqm on the prepared granular surfaces
3 treated with primer and cleaned with hydraulic broom as per technical
1 3.2% 150.00 3.00 - 14.40 Sqm.
specification clause 503

Providing, laying and rolling of open-graded premix carpet of 20 mm


thickness compesed of 13.2 mm to 5.6 mm aggregates either using viscosity
grade bitumen or emulsion to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing by HMP
4 laying with paver finisher and rolling with a three wheel 80-100 kN static
1 3.2% 150.00 3.00 - 14.40 Sqm.
roller capacity, finished to required level and grades with paver finisher to
be following by Seal Coat of Type-C as per Technical Specification Clause
508. of MORD

Providing and laying Seal Coat sealing the voids in a bituminous surface
laid to the specified levels, grade and cross fall with hydrolic self propelled
5 chips spreader using Type C by HMP laying with paver finisher as per
1 3.2% 150.00 3.00 - 14.40 Sqm.
Technical Specification Clause 510 of MORD

Junior Engineer Assistant Engineer


C.D. Build, P.W.D, Kanpur Nagar

file:///conversion/tmp/scratch/503927082.xls
Bill Of Quantity
Name of Work
vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp ejEer dk
dk;ZA
Sl
Item of work Qty. Unit Rates Amount
No.
1 2 3 4 5 6

Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm


sizes to water bound macadam (WBM-3) specification including spreading of in
uniform thickness hand packing, rolling with smooth wheeled roller 8-10 kN in
1 stages to proper grade and camber, applying and brooming, stone screening 0.72 Cum 3930.60 2830.03
(Type-B)/ binding materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density Grading-3 as per Technical Specification
clause 405.

Providing and applying primer coat with bitumen emulsion (SS-1) on prepared
2 surface of granular Base including clearing of road surface and spraying primer at 14.40 Sqm. 23.80 342.72
the rate of 0.70 kg/sqm using mechanical means. clause 502

Providing and applying tack coat with Bitumen (VG-10) using bitumen
distributor at the rate of 0.35 kg. per sqm on the prepared granular surfaces treated
3 with primer and cleaned with hydraulic broom as per technical specification
14.40 Sqm. 13.10 188.64
clause 503

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness


compesed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen
or emulsion to required line, grade and level to serve as wearing course on a
4 previously prepared base, including mixing by HMP laying with paver finisher 14.40 Sqm. 154.40 2223.36
and rolling with a three wheel 80-100 kN static roller capacity, finished to
required level and grades with paver finisher to be following by Seal Coat of
Type-C as per Technical Specification Clause 508. of MORD

Providing and laying Seal Coat sealing the voids in a bituminous surface laid to
the specified levels, grade and cross fall with hydrolic self propelled chips
5 spreader using Type C by HMP laying with paver finisher as per Technical
14.40 Sqm. 48.60 699.84
Specification Clause 510 of MORD

6284.59

J.E. Assistant Engineer Executive Engineer


C.D. Build, P.W.D, Kanpur Nagar C.D. Build, P.W.D, Kanpur Nagar

file:///conversion/tmp/scratch/503927082.xls
SUMMARY OF COST
Name of Work

vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0


1¼150½ ij iSp ejEer dk dk;ZA

Sl.
Item of Work Amount
No.

1 As per BOQ 6284.59


Add : Labour Welfare @1% 62.85
TOTAL 6347.44
Say 0.06 Lacs

Junior Engineer Asstt.Engineer Executive Engineer


CD. Build.,P.W.D. CD. Build.,P.W.D. CD. Build.,P.W.D.
Kanpur Nagar Kanpur Nagar Kanpur Nagar

file:///conversion/tmp/scratch/503927082.xls
ekxZ fuekZ.k dk;ksZ ls lacaf/kr psd fyLV ¼izi= 1&d½
;kstuk dk uke &
[k.M@tuin dk uke fuekZ.k [k.M Hkou] yks0fu0fo0] dkuiqj uxj
vjkSy vkafdu ls fxyoV vehukckn ls cgjkeiqj ekxZ fdeh0 1¼150½ ij iSp
dk;Z dk uke%&
ejEer dk dk;ZA
izLrkfor yEckbZ
izLrkfor dk;Z & uofuekZ. iqufuZekZ.k pkSM+hdlqn`<+hdj.k
¼fdeh0½
& 1.20 1.20
ek0 eq[;ea=h th dh ?kks"k.kk ¼fnu &
ek0 ea=h thdk
?kks"k.kk dhfooj.k
?kks"k.kk ¼fnuakd &
¼?kks"k.kk dks mn~?k`r fd;k &
tk;½
ek0 eq[;ea=h th dk lanHkZ & gkW @ Ukgha
lanHkZ dh fLFkfr esa lanHkZ
&
la[;k ,oa i= ij mfYyf[kr funsZ'k
izLrkod dk uke &
fo/kkulHkk {ks= dk uke & fcYgkSj
lalnh; {ks= dk uke & fefJ[k
dk;Z dk vkSfpR; ,oa egRo
¼i`"BHkwfe
1- ekxZ dh lfgrJs.kh
izkFkfedrk;sa½ & xzkeh.k ekxZ
2- ykss0fu0fo0 dh l`f"V &
osclkbZV ij ekxZ dh
pkSM dzLV
+kbZ ¼feeh0½ lrg dk uohuhdj.k dk
pSust yEckbZ
fdeh0 ¼la0½
¼eh0 xSU;q fcV~;q ;ksx izdkj ekg@Ok"kZ
½ yj feul

5- vkxf.kr izkfo/kku %&


1) ekxZ ij ;krk;kr x.ku psust fdeh- CVPD- PCU- vof/k& fnukad ls rd

2) v½ VDF c½ fMtkbu vkcknh l½ fMtkbu VSªSªfQd msa


n½ ysu fMLVªhC;w'ku QSDVj

3)- ekxZ dh feV~Vh dh 6.00%


6- lh0ch0vkj0@ orZeku
vkdM+s dk L=ksr ,oa foLr`r ekxZ dh pkSM++kbZ
fooj.k izLrkfor 3.75
ekxZ dh yEckbZ Flexible Pavement ds fdukjs Rigid Pavement ds fdukjs
Left Right Left Right
- -

7- izLrkfor eksVkbZ gsrqq fd;s x;s f vkbZ0vkj0lh0 & ---------- s


In open area Design Crust - mm
Compsition of Crust -
SDBC/BC - mm
DBM - mm
WMM - mm
mm
GSB - mm
In built up area Design Crust - mm

PQC - - mm
DLC - - mm
GSB - - mm

8- ekxZ dh ysfir lrg dh orZeku ,oa i yEckbZ ¼fdeh0½%&


orZeku
orZeku
pkSM+kbZ ¼eh0½%&
izLrkfor
pkSM+kbZ ¼eh0½%& 3.75
9- ekxZ dh dzLV dh orZeku ,oa iz orZeku xSzU;qyj @
eksVkb fcV~;qfeul %&
Z
¼feeh0
½

izLrkfo Existing Crust ls match djus gsrq izfo/kku


r WMM - - mm
pkSM+hdj.k %& GSB - mm
eksVkb
Z pkSM+hdj.k ds mijkUr vfrfjDr izkfo/kku &
¼feeh0 lqn`<+hdj.k%& SDBC / BC - mm
½ BM / DBM - mm
WMM - mm
GSB - mm
Total mm
In Built up area PQC - mm
Total DLC - mm
mm

10- nj fo'ys"k.k djus okys vf/kdkjh dvoj vfHk0 lgk0vfHk0 vf/k0vfHk0 v/kh0vf ¼uke½

11- Hkwfe vf/kxzg.k dh vko';drk % yEckbZ eh0 {ks=Qy gsDVsvj

12- ou Hkwfe ls lacaf/kr fooj.k % yEckbZ lajf{kr ou {ks= lkekU; Hkwfe


- - - -

13- izLrkfor dk;Z dh ykxr dk laf{kIr fooj.k%&


fVIi.kh
¼ykxr@f
dzekad en ek=k bdkbZ nj ykxr deh0½
djksM+
1 2 3 4 5 6 7
(A) ekxZ fuekZ.k dh eq[;
Clearing and Grubbing road land (Data
1 Book sr. no. - 2.3)

a) Excavation in soil using hydraulic


excavator CK-90 & tippers with disposal
2 upto 1000m. (Without royalty)
(Data Book sr. no. - 3.6)

b) Excavation in soil using hydraulic


excavator CK-90 with disposal of earth
in immediate vicinity without tippers
(Without royalty)
(Data Book sr. no. - 3.6)
C/o Embankment with material
deposited from road way cutting (With
royalty & dergee of compaction not less
3 than 95%)
(Data Book sr. no. - 3.17 )
C/o Embankment with material obtained
from right of way
(With royalty & dergee of compaction
4 not less than 95%)
(Data Book sr. no. - 3.16)

C/o Embankment with material obtained


from borrow pits
(With royalty & dergee of compaction
5 not less than 95%) #REF! #REF! #REF! #REF!
(Data Book sr. no. - 3.16)
Lead 1 km.

C/o Subgrade and eathen shoulders


(With royalty & dergee of compaction
not less than 97%)
6 (Data Book sr. no. - 3.18)
Lead 1Km.
Scarifying existing bituminous surface
to a depth of 50mm by mechanical
7 means
(Data Book sr. no. - 3.15)
Dismantling of Flexible Pavements by
8 mechanical means
(Data Book sr. no. - 2.5)
a) Bituminous courses
b) Granular courses
9 GSB - ……..mm
a) N.F.V.
b) CC. Road
c) GSB 1L #REF! #REF! #REF! #REF!
d) WBM-2 #REF! #REF! #REF! #REF!
e) WBM-3 0.72 Cum 3930.60 2830.03
10 W.M.M. - ……….mm

11 Prime Coat @ 0.70Kg/m2 #REF! #REF! #REF! #REF!


Tack Coat over primed surface
12 @ 0.35Kg/m2 14.40 Sqm. 13.10 188.64

Tack Coat over bituminous surface @


13 0.30Kg/m2

PC 14.40 Sqm. 154.40 2223.36

Seal Coat 14.40 Sqm. 48.60 699.84

14 D.B.M. - ------mm
Recycling of Bituminous Pavement with
Central Recycling Plant
15 (Data Book sr. no. 5.16)

a) Quantity residual not being used in


this -----
b) Where to use
16 S.D.B.C. 25mm
17 B.C Lean
Dry - ---------- mm (---------mm)
Concrete
(In Built up areas of
Name of Aabadi Length (km.)
18 -------------------------------------------------
-------------------------------------------Total
Length -------------
Pavement km.
Quality Concrete (M45)
19 (Length Same as item no. 18)
Total (A) #REF!
(B) vU; ensa
5.0)
1 (PCC-M20-115x165x250mm)
a) new --- divider
b) Cement kerb divider
Brick edging #REF! #REF! #REF! #REF!
Channel 300x50mm)
2 (Sr. No 8.2)
Inter locking tiles 80mm thick in built
3 up areas as mentioned at serial
no.18

U Type RCC Drain with 25% cover


(In Built up areas as mentioned at
4 serial no.18)
Total Length ------------- km.
(450x300mm)
(450x450mm)
(450x600mm)
(600x600mm)
(600x450mm)
(600x900mm)

Others specify
5 Disposal drain of C/s ---------
Widening of Hume Pipe Culverts
6
(1000mm)
(600mm)
(--------------------)
(-----------------)
(350mm)
(-----------------------)
Widening of RCC Slab culvert
7 (-------------------------)
Reconstruction of damaged Culverts
8
a) HP 600 mm Double row
b) RCC
9 Bridge (Bridge+ Protection work)
Total (B) #REF!
(C) jksM QuhZpj ,oa ;krk;kr lqj{kk gsrq izkfo/kku
Road Marking by Thermoplastic
1 paints -

- Centre Line
No. of lines x No. of Kms x 1000 x
width of line painting
(Length-------Km.)
(Width 100mm)

- Edge Lines
(Length-------Km.)
(width - 100mm)

- Zebra Crossing

2 Delineator

3 Cat's Eye

4 Signage
(A) Overhead (12-15m. Span
structure)
- Required - …... No.

- Existing - ……No.
- Proposed (Location & Ch.
-------------)
(B) Cantilever

- Required - …... No.

- Existing - ……No.

- Proposed (Location & Ch.


-------------)

5 Retro reflective sheeting over board


Overhead
No.--x-- L---x---W.
Cantilever
No.--x-- L---x---W.
Sign Boards
6
(A) Mandatory (Speed limit)

- Required - …... No.

- Existing - ……No.

(B) Cautionay

- Required - …... No.

- Existing - ……No.

© Informatory (Village name)

- Required - …... No.

- Existing - ……No.
(A) Kilo metre Stones
7
- Required - …... No.

- Existing - ……No.

- Proposed (Location--------------)
(B) Hecto metre Stones

- Required - …... No.

- Existing - ……No.

- Proposed (Location---------) #REF! #REF! #REF! #REF!


Total (C) #REF!
Total D (A+B+C)
(E) vU; lsUVst pktsZt
1 Contingency @ 2% #REF!
2 Labor Cess @ 1% 63
3 Establishment Charges @ 6.875% #REF!
4 Price Depreciation @ 1.5% #REF!
Total (E) #REF!
(F) ekxZ dk;ksZa ds vfrfjDr vU; ensa
Land Acquisition (Mention Category
1 of land)
2 Forest Land
3 Utility Shifting (UPPCL)
4 Others
Total (F) 0.00
Grand Total (D+E+F) #REF!
SAY #REF! Lacs

mijksDrkuqlkj vkx.ku dk xgu ijh{k.k dj fy;k x;k gSA


uksV %& mijksDr izi= 1^d* ds lkFk fuEu fooj.k@vfHkys[k vkx.ku esa layXu fd;s tk;A
1- izi= 1^d* dh rhu izfr;kW ewy gLrk{kj fnuakd rFkk uke@inuke lfgrA
ekxZ dh ifjdYiuk vkbZ0vkj0lh0&37%2012 ds lacaf/kr ckj pkVZ lfgr ,oa Coloured Typical cross
2- section ftlesa ekxZ dh orZeku o izzLrkfor dzLV ds fofHkUu vo;oksa dh eksVkbZ o pkSM+kbZ
i`Fkd&i`Fkd jaxksa esa Li"V :Ik ls n'kkZ;h x;h gks] rhu izfr;ksa esssaA
3- lh0ch0vkj0 ijh{k.k vk[;k ¼rhu izfr;ksa esasa vxy ls½A
4- yks0fu0fo0 }kjk lapkfyr l`f"V dh osclkbV ij ekxZ ds fofHkUu fdeh0 ds viyksMsM fooj.kA
5-
uohuhdj.k dh pdzkof/k esa u vkus okys fdeh0 gsrq fu/kkZfjr izk:Ik ij eq[; vfHk;Urk dh fujh{k.k vk[;k
¼rhu izfr;ksa esa½A
6- miyC/k o izLrkfor rVcU/k dk dzkl lsD'ku ¼dzkl lsD'ku esa leLr fooj.k feeh0 esa n'kkZ;s tk;½A
7- eq[; vfHk0@v/kh0vfHk0@vf/k0vfHk0 }kjk fd;s x;s vfUre fujh{k.k dh izfrA
8- ekxZ ds izR;sd fdeh0 ds ,4 vkdkj ds isij ij 2 QksVks izfr i`"B izfr fdeh0 dh nj ls eqfnzr ,oa psust ds
9- fooj.k lfgr vf/k'kklh
iw.kZr%/oLr iqfy;ksavfHk;Urk }kjk gLrk{kfjr
ds iqufuZekZ.k jaxhu
gsrq iqfy;k dsQksVksxzkQ
,4 lkbt ds isij ¼rhu izfr;ksa
ij eqfnzr easa½A
¼fizUVsM½
10- QksVksxzkQ
;krk;kr ¼rhuij izfr;ksa
x.kuk izi= esa½
x.kuk djus okys i;Zos{kd dk fuEu izek.k&i=
11- ^^;krk;krfof'kf"V
Comparative x.kuk esjs i;Zos{k.k esa dh x;h**
pksVZA

ckysUnz ts0ds0 flag ,l0ih0 'kekZ


vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk eq[;vfHk;Urk
fuekZ.k [k.M Hkou] yks0fu0fo0] dkuiqj uxj dkuiqj o`Rr] yks0fu0fo0] dkuiqjA dkuiqj {ks=] yks0fu0fo0] dkuiqjA
clkoV dks iDds ekxZ ls tksM+us gsrq dk;Z;kstuk dk fooj.k eujsxk vuqnku la0
vkcknh Hkkx dqy ;ksx
2001 dh tux.kukds vk/kkj ls ewY; ds vUrxZr
jktLo esa lh0lh0 eujsxk va'k yscj lsl vf/k"Bku
fo/kku ij vkcknh feVVh ls [kMatk ls visf{kr / gzkl dk;Z dh
xzke ysfir lrg jksM vkj0lh0lh0 iqfy;k dks NksM+dj ¼dkye 20 O;; 6-875
tuin@r lHkk jktLo ysiu ysiu kujkf'k fuf/k dqy ykxr
dz esa dh ¼dSfjtos&3 dh ykxr dk izfr'kr ,oa
glhy dk {ks=@ xzke dk lEidZ ekxZ dk uke ¼feV~ dkye ¼eujsxk
la0 yf{kr vuq0tkf izLrkfor eh0½ 2 dfUVUts
uke fodkl [k.M uke vuq0tkf ykxr yEckb ykxr Vh ,oa 20 dk va'k dks
clkoV r@tutkf pkSM+ ykxr : ykxr :0 Liku izfr'kr½ :0 Ulh 2
dk uke dqy r@tutkf yEckb :0 yEck yEck ykxr :0 Z ¼12$1 iqfy;k½ 1-5 NksM+dj½
dk uke r dk kbZ 0 yk[k yk[k ¼vkj0,e yk[k esa izfr'kr
vkcknh r dh ¼eh0½ Z yk[k bZ bZ yk[k esa ¼11$1 4$16$ ¼yk[k izfr'kr ¼20$22$2
izfr'kr esa esa 0½ esa½ 3+24½
vkcknh esa 3$15½ 18
8@7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

vjkSy vkafdu ls fxyoV


dkuiqj
fcYgkSj@ vehukckn ls cgjkeiqj ekxZ
1 uxj@fc 3.75 0.00 0.00 #REF! ### - - - - #REF! ### ### #VALUE! #VALUE! #VALUE!
fcYgkSj fdeh0 1¼150½ ij iSp ejEer
YgkSj
dk dk;ZA

;ksx 01 dk;Z - 0.00 0.00 #REF! #VALUE! 0.00 0.00 0.00 0.00 #REF! #VALUE! 0.00 #VALUE! #VALUE! #VALUE! #VALUE!

izekf.kr fd;k tkrk gS fd


1- izLrkfor ekxZ ls tqM+us okyk jktLo xzke@clkoV iwoZ esa fdlh vU; iDds ekxZ ls ugha tqM+k gS rFkk xzke@clkoV dks Single Connectivity gh iznku dh xbZ gSA
2- izLrkfor ekxksZ ds ljsa[k.k dk losZ{k.k dj HkkSfrd lR;kiu dj fy;k x;k g Shortest Alignment j[krs gq, izkfo/kku U;wure vko';drkuqlkj gh fd;s x;s gSSA
3- mDr izLrkfor lEidZ ekxZ yks0fu0fo0 dh vU; fdlh Hkh ;kstuk ¼ih0,e0th0,l0okbZ vkfn½ vFkok fdlh vU; foHkkx dh ;kstuk esa u rks Lohd`r gS ,oa u gh Lohd`fr gsrq yks0fu0fo0 rFkk fdlh vU; foHkkx }kjk izLrkf
4- mDr izk:i esa dk;Z dh ykxr izeq[k vfHk;Urk }kjk fuxZr v/kkof/kd ifji=ksa esa fufgr fn'kkfunsZ'kksa ds vuqlkj xfBr vkx.kuksa dk lkjka'k gSA
5- ekxZ fuekZ.k gsrq Hkwfe miyC/k gSA
6- vkx.ku esa njsa v/kh{k.k vfHk;Urk] dkuiqj o`Rr] yks0fu0fo0] dkuiqj }kjk vuqeksfnr gSA

vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk eq[; vfHk;Urk


fuekZ.k [k.M Hkou] yks0fu0fo0 dkuiqj o`Rr] yks0fu0fo0 dkuiqj {ks=] yks0fu0fo0
dkuiqj uxj dkuiqj dkuiqj
ifj;kstuk
dh dqy
ykxr
¼21$25
½

26

#VALUE!

#VALUE!

kx }kjk izLrkf
Bill Of Quantity
Name of work : y[kuÅ bVkok ekxZ ¼,l0,p0&40½ fdeh0 99 ls cksgukj ok;k ;qx 'kfDr/kke
vkJe rd lEidZ ekxZ dk uo fuekZ.k dk dk;ZA
1. Date of Calling Tender : 14.12.16 5. Cost of Tender : 2530.00
2. Date of receiving Tender : 30.12.16 6. Validity period : 03 month
3. Date of Opening Tender : 31.12.16 7. Time of Completion : 02 Month
4. Earnest Money : 5.50 Lacs
Sl Rates
No Item of work Qty. Unit Amount
. In Fig. In Words
1 2 3 4 5 6
Construction of granular sub-base by providing well graded material,
spreading in uniform layers with motor grader on prepared surface,
1 mixing by mix in place method with rotavator at OMC, and compacting 409.00 Cum 2720.00 Err:511
with vibratory roller to achieve the desired density, complete as per clause
401

Providing, laying, spreading and compacting (7.5 cm compacted


thickness) stone aggregates of 45-63mm sizes to water bound macadam
(WBM-2) specification including spreading of in uniform thickness hand
packing, rolling with smooth wheeled roller 8-10 kN in stages to proper
2 grade and camber, applying and brooming, stone screening (Type-B)/
649.00 Cum 3180.00 Err:511
binding materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density Grading-2 as per Technical
Specification clause 405.

Providing, laying, spreading and compacting (7.5 cm compacted


thickness) stone aggregates of 22.4-53mm sizes to water bound macadam
(WBM-3) specification including spreading of in uniform thickness hand
packing, rolling with smooth wheeled roller 8/10 ton in stages to proper
3 grade and camber, applying and brooming, stone screening (Type-B)/
541.00 Cum 3250.00 Err:511
binding materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density Grading-3 as per PWD
Specification clause 20.4

Edging with M-150 bricks,laid day lengthwide edging with M-150 class
bricks, laid day lengthwise, including excavation, refilling consolidation,
4 with a hand packing and spreading nearly surplus earth within a lead of
1.93 Km. 65000.00 Err:511
50 meter.

Providing and applying primer coat with bitumen emulsion on prepared


5 surface of granular Base including clearing of road surface and spraying 7218.00 Sqm. 22.50 Err:511
primer at the rate of 0.70 kg/sqm using mechanical means.

Providing and applying tack coat with Bitumen (VG-10) using emulsion
distributor at the rate of 0.35 kg. using bitumen pressure distributor at the
6 rate of 0.35 kg. per sqm on the prepared bituminous / granular surfaces 7218.00 Sqm. 12.50 Err:511
cleaned with mechanical broom.

Providing, laying and rolling of open-graded premix carpet of 20 mm


thickness compesed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to required line, grade and level to
7 serve as wearing course on a previously prepared base, including mixing 7218.00 Sqm. 136.00 Err:511
in a suitable plant, laying and rolling with a three wheel 80-100 kN static
roller capacity, finished to required levgel and grades to be following by
Seal Coat of Type-C as per Technical Specification Clause 508.

Providing and laying Seal Coat sealing the voids in a bituminous surface
laid to the specified levels, grade and cross fall with hydrolic self
8 propelled chips spreader using Type C by HMP laying with paver finisher 7218.00 Sqm. 43.00 Err:511
as per Technical Specification Clause 510 of MORD

Construction of subgrade and earthen shoulders with approved material


obtained from borrow pits with all lifts and leads, transporting to site,
9 spreading, grading to required slope and compacted to meet requirement 3300.00 Cum. 78.00 Err:511
of Table 300.2 with lead upto 1000 m as per Technical Specification
Clause 303.1.

I quote my rate ……………………… percent below/above the above mentioned/Departmental rates

503927082.xls30 Tender BOQ


Contractor's Name………………………..………….
& Address…………...………………………..………
Contractor's Signature

Officer Officer Officer Officer


Calling Tender Opening Tender Recommending Tender Accepting Tender