Professional Documents
Culture Documents
Pressure = 1.5
Time taken to complete the total number of revolutions (3 readings) = 20.30s, 20.10s, 20.09s
ℎ1 = Final distance between the top of the needle to the top surface of the bridge.
Graph of h2 versus r
106
100
98
h2, mm
96
94
92
90
88
0 20 40 60 80 100
Radius, mm
Pressure = 1.0
Time taken to complete the total number of revolutions (3 readings) = 26.63s, 26.62s, 26.65s
ℎ1 = Final distance between the top of the needle to the top surface of the bridge.
Graph h2 versus r
104
102
101
100
h2, mm
99
98
97
96
95
0 10 20 30 40 50 60 70 80 90 100
Radius, mm
Sample Calculation
20
= 2𝜋 ×
20.16
= 6.233 𝑟𝑎𝑑/𝑠
ℎ2 =ℎ1 −ℎ0
=113−24
=89𝑚𝑚
𝑇ℎ𝑒𝑜𝑟𝑒𝑡𝑖𝑐𝑎𝑙 ℎ 𝑟 2 𝜔2
= 2𝑔
302 ×6.2332
=2(9.81)(1000)
=1.782𝑚𝑚
𝑇ℎ𝑒𝑜𝑟𝑒𝑡𝑖𝑐𝑎𝑙 𝐻 𝑟 2 𝜔2
=
𝑔
302 × 6.2332
=
(9.81)(1000)
= 3.564𝑚𝑚
Part II: Free Vortex
ℎ = ℎ1 − 𝑑𝑎𝑡𝑢𝑚 ℎ𝑒𝑖𝑔ℎ𝑡
Sample Calculation
ℎ = ℎ1 − 𝑑𝑎𝑡𝑢𝑚 ℎ𝑒𝑖𝑔ℎ𝑡
= 166 − 1799
= −13𝑚𝑚
Graph of h versus r
0
0 20 40 60 80 100 120
-10
-20
h, mm
-30
-40
-50
-60
Radius, mm