You are on page 1of 1

TASK SHEET 2.

1-3

Title: Ethernet Cable Configuration

Performance Objective: Given are the following materials, you should be


able to configure ethernet cable. Allotted time 30 minutes.

Supplies/Materials : RJ45, Unshielded Twisted Pair cable

Equipment : Crimping tool, Wire Stripper, Network Cable Tester

Prerequisites:
Steps/Procedure:
1. Read information sheet 2.1-3 Ethernet Cable configuration
2. Create a straight through ethernet cable configuration using
T568A color scheme
3. Create a straight through ethernet cable configuration using
T568B color scheme
4. Create a crossover ethernet cable configuration

Assessment Method:
Demonstration, Observation

You might also like