You are on page 1of 3

ENGINEERING DELIVERABLE

Document No. PROCESS CALCULATION Rev. : 1


STEAM GENERATION Page No.
(BOILER PACKAGE)
1 from 3

DISCIPLINE : PROCESS

CLIENT : PT. JHONLIN AGRO RAYA

PROJECT NAME :
PEMBANGUNAN PABRIK BIODIESEL
PLANT KAPASITAS 1500 TPD
TERMASUK PRETREATMENT,
BATULICIN, KALIMANTAN SELATAN

IFA DMP AR MWH/AR

PREP'D CHK'D APP'D APP'D APP'D

Rev Date Description PT. Damanito


PT. Jhonlin Agro
PT. WIKA Rekayasa Konstruksi Teknologi
Raya
Rekatama
ENGINEERING DELIVERABLE

Document No. PROCESS CALCULATION Rev. : 1


STEAM GENERATION Page No.
(BOILER PACKAGE)
2 from 3

REVISION SHEET

Rev. No. Date Description


ENGINEERING DELIVERABLE

Document No. PROCESS CALCULATION Rev. : 1


STEAM GENERATION Page No.
(BOILER PACKAGE) 3 from 3

BOILER PACKAGE FOR STEAM GENERATION

Object : To Produce steam


1. Steam Data :
Net Steam Requirement at Header = 35.00 TPH
Steam Pressure at header = 17 barG
Steam Type = saturated

1. Boiler Steam Data :


Boiler Capacity = 39.00 TPH (vendor should rechek and recalculate)
Steam Pressure outlet Boiler = 17 barG
=

2. Water Data :
Water type = Demin Water
Water Temperatur From make up water tank = 55.00 Oc
Water Consumption = 39.00 TPH

3. Coal Data :
- Gross Calorific value = as per sampling analysys attached
- coal sizing maksimum input to crusher = 100 mm … refer for meeting 2019/11/04

Fuel Consumption
Boiler Efiiciency = 80% … Vendor need to recheck and recalculate
Coal Consumption = 7.29 TPH … Vendor need to recheck and recalculate

4. Flue Gas :
Flue gas calculation
ash content for Coal analysys general = 0.12 …average 11 - 14%
… Vendor need to recheck and
Ash produced = 0.87 TPH recalculate
= 21.00 tpd

5. Coal Shield Desain


Coald shield capacity = 1224.72 ton ….....Design Building Coal Shield for 7 days
= 1230 ton storage