• Minimised interfaces
• No turret interface
• 12 Cargo Tanks
15000
12T + B
10T
8T + B
8T
10000 6T
16T + B
5000
She a r Force (tonne s)
0
0 20 40 60 80 100 120 140 160
-5000
-10000
-15000
-20000
-25000
X fwd AP (m)
BARTOP Bending Moment Details
Bending Moment Curves
Bending Moment
0
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0
-200000
-400000
Bending Mome nt (tonne.m)
-600000
-800000
10T
-1000000 12T + B
8T + B
8T
6T
16T + B
-1200000
-1400000
X fwd AP (m)
BARTOP Hull Construction
• Hull
• Helideck
• Accommodation
• Cranes
systems
• Utilities systems
• Helifuel system
All Systems Operational When Leaving Shipyard
Marine Systems Locations
SLOPS TANK
FORWARD
SEA WATER LIFT (Vessel North)
PUMP CAISSONS
FIRE PUMPS
(Typical port and
starboard sides)
AFT MACHINERY SPACE
INCORPORATES:
CARGO EXPORT PUMPS
3x50%
MID SECTION BALLAST
BALLAST PUMPS 2x50% TANK
INERT GAS GENERATOR
2x100% VESSEL SCOPE TO INCLUDE:
DIESEL AND MODULE SUPPORT FRAMES
SELF CONTAINED HVAC
POTABLE WATER EGRESS TUNNELS
SYSTEMS
STORAGE (excluding local sections to
ELECTRICAL SWITCH modules)
ROOM AFT CRANE
VESSEL FEATURES: LOWER PEDESTAL
VCS
* STANDARD MARINE SYSTEMS * SECTIONS (for both forward
MINIMUM SYSTEMS INBUILT and mid sections) HOSE
SUPPORT STRUCTURE AND
CHUTE
Midship Section
Transverse Web Frame Section
200x15 F.B.
Hull Engineering Strategy
100 year wave condition comparison - BARTOP and Terra Nova FPSO
Current Status of Design
• Fatigue analysis
• Topsides supports
• F E Strength analysis
• Green water
• Model Testing
Fairlead
Drag Anchor or
Suction Anchor Suction Anchor
Typical Mooring Line Arrangement
Fairlead
1
Line Section Type
1 Chain
2 Spiral Strand
Passive mooring line 3 Chain
arrangement example
2
Drag Anchor or
Suction Anchor
Example Deep Water Riser Options
Flexible Risers
Flexible Risers
Drag Anchor or
Suction
Suction Anchor
Anchor
Mooring System Description
• Increased barge width yields 17% reduction in mooring loads
• 16 Dismountable fairleads
• 16 Suction anchors
FORWARD
FORWARD
FLARE
FLAR (VESSEL
(VESSEL
NORTH)
NORTH)
E UTILITIES
MODULE
POWER
POWER
GENERATION
GENERATION
MODULE
MODULE
PROCES
PROCESS HELIDECK
S
MODULE HELIDECK
FLARE KO MODUL
FLARE
DRUMSKO E
DRUMS
ACCOMMODATIO
ACCOMMODATION
RAISED TUNNEL WITH FORWARD N
RAISED TUNNEL WITH PIPERACK FORWARD
INTEGRAL CRANE
INTEGRAL PIPERACK CRANE
BETWEEN PROCESS AND
BETWEEN PROCESS
FLARE AND
FLARE
Topsides Layout
Production Risers
Fuel gas
Diesel
Seawater Firewater
Firewater Open Drains
Potable Water Heating Medium
Instrument Air Seawater
Drains – Open Nitrogen
Diesel Instrument Air
Stabilised Crude Potable Water
Aviation Fuel Drains
Nitrogen
Minimal Hook-ups!
Execution Plan Options Overview
• Project management - Project Office
• Topsides engineering - Project Office Barge & topsides fabrication,
• Hull engineering - Project Office construction & Integration
Moorings suppliers options
• Moorings engineering - Project Office
Korea
Europe
China
Singapore
Essential Route to FPSO Completion
• Integrated HUC / Operations Team
How ?
Input Into Design at ALL Stages
Interface Register Set-up Process
Abbreviations:
CC: Contractor Clarification Form Closeout: Originator DC:
Discipline Eng /
CDC: Central Document Controller Confirm receipt of
PMT: IDR will be
DE: Discipline Engineer IDR via Project
Review the CC automatically closed
IDR: Interface Data Request Form Place
response and reply after 5 working days
PMT: Project Management Team
to IDR
NO
“Contractor to
raise IDR, using “Further
the original IDR Clarification?”
number, updating YES
Rev. number only”
Hull & Topsides Integration Philosophy
Interface Management
OPERATIONS &
CLIENT MAINTENANCE
DRILLING
CONTRACTOR
RESERVOIR
SUBSEA
HULL TOPSIDES MOORINGS
INSTALLATION
FLOWLINES/RISERS
Guiding Principals
• Define interfaces as early as possible
• Enroll fabricators/contractors
Vessel & Topsides Fabrication and Installation
Fundamental Characteristics
• Topsides arranged into minimum number of modules for maximum
quayside completion and minimum module/module hook-up on vessel
FORWARD
(VESSEL NORTH)
NON-MODULAR
FLARE
EQUIPMENT
556 te POWER GENERATION
1321te (Gross)
(Gross) 2782 te (Gross)
UTILITIES MODULE
TOTAL GROSS 2332 te (Gross)
TOPSIDES WEIGHT PROCESS MODULE
13021 te 6030 te (Gross)
AFT
MACHINERY
SPACE
RISER
BALCONY
Modules Installation
Modules Skidded or Trailered onto Deck
Barge or Quayside
POWER GEN
PROCESS
UTILITIES
H
Loading Direction from Barge
Barge
Modules Installation Options
Module Installation at Quayside or Offshore
Installation of topsides packages onto vessel
at fabrication yard:
• Topsides installed onto vessel in large
modules by skidding or trailer load out from
barge
• Topsides modules installed using crane
Floating Crane
Skidded / Trailored Topsides Modules
Installation
Barge
MODULE
TRAILER
MODULE SUPPORT ‘ROAD’
TRANSPORT
BARGE
Barge FPSO ready to
take onboard modules
BRIDGE LINK
OPENINGS
JACKING POINTS
High Level Schedule Example
Summary
Design Status:
• FPSO technical definition complete (hull and typical topsides)
Expectations:
• Solution is commercially attractive and will achieve a good schedule
• Execution plan developed to mitigate risk of cost escalation and
schedule delay
Summary cont’d
Why BARTOP & Irvine Engineering?
Irvine Design Shipyard Converted Tanker Design
9 Improved layouts / Integrated solution. 9 Some fabrication drawings can be used
9 Long lead items do not affect hull “as is”.
schedule. 9 Shipyard familiar with their own design.
9 Simple and robust hull less sensitive to 9 Schedule benefit (perceived ?).
topsides changes. × A significant amount of re-engineering
9 Shorter/Beamier hull, efficient ballast required.
design giving reduced mooring loads × Difficult to accommodate late changes
and offsets. and late delivery of long lead packages.
9 Better damage stability characteristics. × Longer hull, larger mooring loads and
9 In-house control of design. greater offsets.
× Hand-over period with shipyard × Reduced control of design.
× New fabrication drawings and CNC × Non optimum solution.
programmes.
“A New Build Minimal Cost
FPSO & FSO Barge Design”