You are on page 1of 1

PDO ENGINEERING STANDARDS AND PROCEDURES

PROJECT MANAGEMENT  –  CFDH:


  CFDH: UEP - (Julian Masters) MECHAN CAL TAT C EQU PMENT ENG NEER NG C DH U A ELECTRICAL ENGINEERING  –  CFDH:
  CFDH: UIE (UEE2) - (Mohammed Aghbari)

Doc. ID Document Title Additional Notes Rev./DEM Date m M Doc. ID Document Title AdditionalNotes Rev./DEM Date
ProjectEngineering –  ElectricalEquipment – 
SP-1099 ElectricalInfrastructure- SpecificationforElectrical Installation Practice Ver. 5.0 Dec-06
SP-1100 SpecificationforTesting& CommissioningofElectrical Equipment Ver. 3.0 Jun 04
CP-117 ProjectEngineering CodeofPractice Rev. 5.0 Jan-12
CP-122 Health, Safetyand Environment ManagementSystemManual Ver. 5.0 Jul-11 SP-1101 Electrical InfrastructureSpecificationforinstallation ofOverhead Transmission Ver. 2.0 May-08
CP-131 Riskand OpportunityManagementCodeof Practice Ver. 3.0 Dec-06 Lines
CP-206 ManagementofChangeCode ofPractice Rev. 1.0 Nov-11 SP-1102A Electrical InfrastructureSpecificationforDesign of33kV Overhead Power Ver. 6.0 Aug-08
Lines on Wooden Poles
PR-1150 Project CloseOut Procedure  – EngineeringCAPEX
 – EngineeringCAPEX &OPEX Projects Ver. 3.0 Apr-04 SP-1102B ElectricalInfrastructure SpecificationforDesign of33kV Overhead Power Ver. 7.1 Dec-10
PR-1153 Field Trouble Report Procedure Ver. 2.0 Feb 06
Lines on Concrete Poles
PR-1247 ProjectManagementofChangeProcedure Ver. 4.1 May-12
SP-1103 ElectricalEngineeringGuidelines Amend’t/
Amend’t /Suppl’t toDEP 33.64.10.10-Gen(Feb-11) Ver. 5.0 Oct-11
PR-1358 ProcedureforConcept Selection and PreparingaBasis forDesign Ver. 2.0 Dec-04
SP-1105 ElectricalInfrastructure- ElectricalStandard DrawingsList Ver. 4.0 May-06
PR-1979 ProcedureforProject DeliveryAssuranceBoards(PDAB’s) Rev. 1 Mar-11
SP-1106 ElectricalInfrastructure- SpecificationforCodingand Identificationof Ver. 2.0 May-08
SP-1134 SpecificationforDetailed Design and EngineeringofOil &Gas Facilities Rev. 1.0 Aug-06 Overhead LineSystems
SP-2050 SpecificationforConstruction
i onActivitieson Oil,Gasand UtilityFacil
i tyFacilitiesPro
i tiesProjects Ver.1.0 Jul-06 SP-1107 ElectricalInfrastructure-Specificationfor  E le le ct ri ca l P ro te
te ct io nS ys te m V er . 3 .0 J ul -0 8
SP-2100 Contract Cost EngineeringSpecification Ver. 1.0 Dec-09 SP-1109 Specification for Earthing and Bonding Ver. 4.0 Mar-04
SP-1110 ElectricalInfrastructure- SpecificationforElectrical SuppliesforMobile Camps Ver. 5.0 May-06
GU-484 ProjectEngineering  – Scheduling&ReportingGuideline
 – Scheduling&ReportingGuideline Ver.2.0 Feb-11 SP-1111 ElectricalInfrastructure- SpecificationforTemporaryElectrical Supplies Ver 4.0 Apr-06
GU-556 GuidelineforVendorProject Document Deliverables Rev.1.0 Feb-07 forConstruction &MaintenanceWork
GU-569 Project Cost Engineering Rev.1.0 Jan-07 SP-1112 ElectricalInfrastructure- ElectricalSpecificationforDrillingRigs Ver. 4.0 Apr-06
GU-663 Project ControlsPlan Guideline Rev. 0 Jun-11 SP-1113 ElectricalInfrastructure- Specificationfor132kV Substation Ver. 4.0 Apr-08
SP-1114A Electrical Infrastructure- ure- Specification forDesign of132kV Overhead Power
DEP 00.00.07.10 Design ClassTables Complexand/orHigh Valueprojectsonly- Evaluate &justifyon caseby casebasis    Sept-11 Lineson Wooden Poles Ver. 4.0 May-08
DEP01.00.09.10 (Ι) OperationalTaggingRequirements Feb-12 SP-1114B Electrical InfrastructureSpecificationforDesign of132/220 kV Overhead Ver 2.0 May-08
DEP30.10.01.10 RequisitionsIndex Feb-12 PowerLineson Steel Towers
DEP70.10.90.11 (Ι) SparesParts Feb-12 SP-1114C ElectricalInfrastructure  – Specification – SpecificationforDesign ofTWINELM 132kV Ver. 2 Dec-10
Overhead PowerLineson Concrete Poles
DEP 82.00.10.12 LifeCycle Costing(Endorsement ofISO 15663-1) Feb-11
SP-1115 S p ec i if c at i on f o r D gi i at l P o we r L i ne C a r ri e r Co m mu n ci a it o nS y st e m V e r2 . 0 J u n- 0 4
SP-1116 E l ec t ri c al I n fr a st r uc t ur e - S p ec i fi c at i on f o r S CA DA o f E l ec t ri c al S y st e m V e r. 3 . 0 J a n- 0 7
Design / Drafting –  SP-1117 Specification forPowerTransformers Amend’t /Suppl’t to DEP-33.65.40.31-Gen (Oct-01) Ver. 4.0 Nov-03
SP-1118 SpecificationforPowerStation Ver. 2.0 Oct-04
SP-1131 SpecificationforHand Overand AsBuilt Documentation Ver. 3.0 May-06 SP-1119 SpecificationsforElectrical MachinesCageInduction Types Amend’t /Suppl’t to DEP 33.66.05.31-Gen(Jan-99) Ver. 4.0 Jun-06
SP-1132 SpecificationforPlant Design ReferenceManual Ver. 3.0 Apr-06 SP-1120 SpecificationsforHigh VoltageSwitchgearand Control Assemblies Amend’t /Suppl’t to DEP 33.67.51.31-Gen(Jul-98) Ver. 3.0 Jun-04
SP-2047 Specificationforthe Preparation and Content ofEngineeringDrawings Ver. 2.0 Feb-10 SP-1121 SpecificationsforLowVoltage Switchgearand Control Assemblies ies Amend’t /Suppl’t 
Suppl’t to DEP 33.67.01.31-Gen (Jan-98) Ver 4.0 Jun-05
SP-1144 InfrastructurePowerSystemsDepartment  – O  – O i la n dG as D i r ec t or a et S e rv i ce V e r. F M ay - 05
PR-1666 Project Drawing Procedure Ver. 1. 0 May-06 Level Agreement
DEP 00.00.06.06 StandardDrawingsIndex Sep-12 SP-1242 HSE Specificationfor  Activitiesin theVicinityof OverheadPowerLines Ver 4.0 Oct-04
00.00.07.30 (ΙΙ)
DEP 00.00.07.30 ( Applicationofa functional specification Sep-12 SP-1267 SpecificationforSynchronousACMachines Amend’t /Suppl’t to DEP-33.65.11.31-Gen (Jan 99) Ver.2.0 Jun-06
(endorsementof ISO13879, ISO13880 andISO/TR 13881)
DEP 02.00.00.10 Preparation&Microfilmingof TechnicalDrawings Amended byCirculars15/99, 64/01 &56/03  
&56/03    Oct-95 PR-1168 PowerSystems  – EmergencyResponseProcedure
 – EmergencyResponseProcedure Ver 7.0 Mar-09
VolumeVII: PowerSystemsOperstionsInterior 
PR-1259 InfrastructureManagement Procedure Ver. 2.0 Sep-99
Standards Administration
ion –  PR-1265 ProceduresforMaintainingPowerSystem NetworkModels Ver. 2.0 Nov-06
PR-1353 ElectricalSystemFaults& AnalysisProcedure Ver. 4.0 Jun-05
PR-1561 WinPCSProcedure Rev. 0 Mar-04 PR-1421 InfrastructurePowerSystemsDepartment MHEWInterconnectorOperation Ver 3.0 Dec-04
GU-453 GuidelinesforWinPCS Users Rev. 02 Jul-06 MaintenanceProcedure
PR-1613 ProcedureforAssessment ofProtection RelayTestingEngineers Ver. 2.0 Jun-10
ORM OpportunityRealisationManual Apr-10
GU-290 InfrastructurePowerSystemsDepartment  –  PowerSystemsAsset
 PowerSystemsAsset Management Ver. 2.0 Apr-06
00.00.00.30 (ΙΙ)
DEP 00.00.00.30 ( ProcedureforGlobal Technical StandardsPublications Sep-12 GU-323 InfrastructurePowerSystemsDepartment - KeyBusinessControl Ver. 3.0 May-06
DEP00.00.05.05 Global Technical StandardsIndex Sep-12 DocumentationGuidelines
DEP00.00.10.05 StandardFormsIndex Sep-12
DEP00.00.20.10 TheUseof SIQuantities  – Endorsement
 – EndorsementofISO-31, ISO-1000 &ISO 80000 Feb-11 DEP 33.64.10.10 (
33.64.10.10 ( Ι) ElectricalEngineeringDesign Amended&Supplemented bySP-1103 DEM 1 Feb-11
DEP 33.64.10.12 (I)
33.64.10.12 (I) ElectricalSupplyand Generation-Design and Operation Sep-11
DEP 33.64.10.32 (I)
33.64.10.32 (I) Electrical NetworkMonitoringand Control SystemforIndustrial Sep-11
 Networks- Specification
DEP33.64.10.33 Electromagnetic Compatibility(EMC) Sep-12
NFORMAT ON MANAGEMENT ENG NEER NG DE GN Y TEM U D G DEP 33.65.11.31 (I)
33.65.11.31 (I) SynchronousACMachines  – Ame
 – Amendments/Supplementsto s to IEC 60034-1 & Amendedand SupplementedbySP-1267 Feb-12
12
IEC60034-14
DEP33.65.11.32 Packaged Unit AC GeneratorSets Apr-03
DEP33.65.40.31 (I) PowerTransformers – 
PowerTransformers  – A A me n dm en t s/ S up p el m en t s t oI E C6 0 07 6 -0 1 & A me n de d a n dS u pp l em en t ed b y S P 1
- 1 17 S e p- 1 1
IEC60076-11
DEP33.65.50.31 (Ι) Static DC UninterruptiblePowerSupply(DC UPS)Units DEM-1 Feb-11
DEP33.65.50.32 (Ι) Static AC UninterruptiblePowerSupplyUnit (Static A.C.UPS unit) DEM-1 Feb-11
MECHAN CAL ROTAT NG EQU PMENT ENG NEER NG C DH U R H DEP 33.65.60.30 (I)
33.65.60.30 (I) SolarPowerSystems Feb-12
DEP33.66.05.31 (I) ElectricalMachines-Cage-InductionTypes  – Amendments/S
 – Amendments/Supplements Amended and SupplementedbySP-1119 Feb-12
m M to IEC 60034-1 &IEC 60034-14
DEP 33.66.05.33 (I)
33.66.05.33 (I) AC ElectricalVariable Speed DriveSystems Feb-12
DEP33.67.01.31 (Ι) LowVoltageSwitchgear& Control GearAssemblies Amended and SupplementedbySP-1121 Feb-11
 –  Amendments/Supplementsto IEC60439-1
DEP 33.67.51.31 (I)
33.67.51.31 (I) High-VoltageSwitch Gearand Control GearAssembliesfor Rated Voltages Amended and SupplementedbySP-1120 Feb-12
 between 1kV &52kV – 
&52kV –  Amendments/Supplementsto IEC62271-200
DEP33.68.30.32 Electrical Trace Heating Sep-10
QUAL TY MANAGEMENT C DH U Q G DEP33.68.30.33 ElectricalProcessHeaters  Nov-06
DEP 63.10.08.11 (I)
63.10.08.11 (I) Field Commissioning& MaintenanceofElectrical Installations&Equipment Sep-11

Electrical Safety Operational Procedures (ESOP’s)– 

SP-1145 Guideto SafetyOperability(SAFOP)Studieson Electrical Systems Ver. 3.0 Oct-03

PR-1947 ElectricalSafetyRules Ver. 8.0 Aug-10


PR-1948 Electrical SafetyOperatingProcedures Ver. 9.0 May-10

PIPELINE & FLOWLINE ENGINEERING  –  CFDH:


 CFDH: UIPT(UEL) - (Said Asmi)

Doc. ID Document Title AdditionalNotes Rev./DEM Date


&H
SP-1032 SpecificationfortheDesign, Operation, Maintenance&Inspection Ver. 3.0 Sep-11
ofPipelineBlock ValveStations
SP-1199 ProcurementSpecificationforPipelineSplit Tees Ver. 2.0 May-11
SP-1208 PipelineConstruction Specification Ver. 3.0 Mar-11
SP-1210 PipelineOperationsand Maintenance Ver. 2.0 Dec-03
SP-1211 OnshorePipelineEngineering Ver. 3.0 Jan-11
SP-1212 DEP 31.40.40.38-PDOHydrostaticPressureTestingofNew Pipelines Based on DEP 31.40.40.38-Gen(Jan-10) Rev. 2.0 Mar-11
SP-1235 DEP 31.40.60.12-PDOPipelineRepairs(Supplement to ASME B31.4 &B31.8) Based on DEP 31.40.60.12-Gen(Jan-10) Rev. 2.0 Mar-11
SP-1236 DEP 31.40.21.31-PDOPipelineIsolatingJoints- Amendments/Supplementsto
/Supplementsto MSS SP-75 Based on DEP 31.40.21.31-Gen(1999) Ver. 1.0 Dec02

PR-1067 I n fr a st r uc t ur e - E me r ge n cy R e sp o ns e D o cu m en t P a rt I I I C on t n
i g en c y Pl a ns V e r. 8 . 0 J u -l 0 9
AFETY ENG NEER NG C DH M A m - Vol. 4: Main Oil Line
PR-1146 EngineeringandOperations  - FlowlineCold CuttingProcedure Ver. 3.0 Dec-06
PR-1235 Main Oil LineSystem - Management Procedure Rev. 02 Jun-08
m M
PR-1236 South Oman GasLineSystem - ManagementProcedure Rev. 02 Jun-08
PR-1416 Procedures for th the Us
Use ofof Pi
Pipe-RBA Methodology Rev. 1 Mar-03
H m
PR-1504 FacilitiesChangeProposal ProcedureforMain Oil Line, South Oman GasLine Rev. 0 Feb-02
and MAF Terminal
PR-1506 PipelineHot Tap ManagementProcedure Rev. 01 Oct-02
PR-1522 ProcedureforAnalysisof PipelineRoadCrossing Rev. 1.0 May-12
PR-1629 InstallationofEpoxyGrouted Sleeve& ClockSpringRepairs Ver. 2.0 Dec-09
PR-1642 Procedurefor“COSASCO”RetrievingEquipmentOperation,CorrosionMonitoring Ver. 2.0 Dec-09
and Weight LossCoupon Analysis
PR-1799 ProcedureforEmergencyPipelineRepair Material Management Ver. 1.0 Sep-08

GU-379 Pp
i el in e Em er ge nc yR ep ai rM an ua l( Cl as s 1P p
i el in es ) R ev .5 .0 M ay -1 2
GU-501 ExcavationandWorking AroundLivePipelines Rev. 2.0 Sept-11
MATERIALS SELECTION & CORROSION ENGINEERING  – CFDH: UEOC - (Nasser Behlani)
DEP 31.38.60.10 (Ι) Hot Tappingon Pipelines, Pipingand Equipment- Owner  – 
Owner  –  Mechanical Static Amended byCircular76/11 DEM-1 Feb-11
DEP 31.40.10.12 (
31.40.10.12 ( Ι) Design OfMultiple-pipeSlugCatchers Amended byCircular19/12  DEM-1 Feb-11
Doc. ID Document Title AdditionalNotes Rev./DEM Date DEP31.40.10.13 (Ι) Design ofPipelinePigTrap Systems Amended byCircular84/11 DEM-1 Feb-11
General - DEP31.40.10.16 UpheavalBucklingofPipelines Apr-06
DEP31.40.20.33 (Ι) LinePipeInduction Bends- Amendments/ Supplementsto ISO15590-1 Amended byCircular102/11 &56/12 DEM-1 Feb-11
CP-208 CorrosionManagementCode ofPractice NEWREQUIREMENT Ver. 1.0 Jul-12 DEP31.40.20.37 (Ι) LinePipefor Critical Service-
ce- Amendments/ Supplementsto ISO3183:2007 Amended byCircular100/11 DEM-1 Feb-11
DEP31.40.21.30 PipelineFittings- Amendments/ Supplementsto ISO-15590-2 Jun-07
SP-1128 SpecificationforCathodicProtection Design Ver. 2.0 Dec05 DEP31.40.21.31 PipelineIsolation Joints- Amendments/ Supplementsto ISO15590-2 Sep-11
SP-1129 Specification forConstruction, Installation and CommissioningofCathodicProtection Systems Ver. 2.0 Sep-05 DEP31.40.21.33 PigSignallers: IntrusiveType Sep-11
SP-1130 SpecificationforCathodicProtection Materialsand Equipment Rev. 1.0 Sep-99 DEP31.40.21.34 Carbon And LowAlloySteel PipelineFlangesFor Usein Oil &Gas Operations Jun-07
SP-1136 CathodicProtection Drawings Ver. 2.0 Dec05 - Amendments/Supplementsto ISO 15590-3
SP-1189 Specification forDuplexStainlessSteel LinePipe - Amendments/Supplementsto API5LC REPLACESDEP31.40.20.34 Ver. 1.0 Dec-00 DEP31.40.50.30 (I) Pre-commissioningof Pipelines Sep-11
SP-1195 Specificationforthe Wall ThicknessMeasurementofPipelinesby Automated Ver. 1.0 Jan-01 DEP31.40.60.11 PipelineLeakDetection Amended byCircular41/08  
byCircular41/08   Sep-02
UltrasonicTechniques
SP-1246 SpecificationforPaintingand CoatingofOil and GasProduction Facilities Ver. 2.0 Apr-10
(Parts1 to 5)
SP-2034 SpecificationforInternal FBE CoatingofLine Pipe Ver. 1.0 Sep 05
(Amendments/Supplementsto
s/SupplementstoAPI REP5L7)
H M H SP-2041 Specification forCrackingResistant Materialsin H 2S ContainingEnvironment Ver. 2 Mar-11
SP-2092-1 GRPSpecification  – Part
 – Part 1 (Qualification&Manufacturing) Ver. 0 Jan-10
SP-2094 SpecificationforPolyethyleneLinersin Carbon Steel Flowlines &Pipelines Ver. 0 Aug-10
SP-2095 Internal Liquid CoatingforCarbon Steel Pipingand LinePipes Ver. 1.0 Sept-09 CIVIL ENGINEERING  –  CFDH:
 CFDH: UEP1C (UEB) - (Hilal Aghbari)
PR-1180 PerformanceTestingofCoatingSystems forPipelineRehabilitation Ver. 2.0 Nov-05
PR-1234 SafeWorkingProceduresfor CathodicProtection Systems Ver. 2.0 Mar-01 Doc. ID Document Title AdditionalNotes Rev./DEM Date
PR-1503 ProcedureforDeterminingPipeline’sAssessed Corrosion Rate (ACR) Ver. 2.0 Dec-09
Civil / Structures  -
 -
PR-2006 Replacement(Like/Like)ofCarbon Steel / OtherSpoolsConnected to GRP Lines Ver. 1.0 Nov-11
SP-1143 Specificationsfor Earthmoving ng &ConstructionEquipment NEWREQUIREMENT Rev. 2 May-12
GU-368 GuidelinesForThe ProtectionOfBuried Sectionsof SurfaceLaid Pipelines/Flowlines Rev. 0 May-00 SP-1274 S pe ci fi ca
ca ti on f or C iv
iv ilil & B ui ld
ld in gs C on
on st ru ct
ct io n- M at er
er ia ls T es
es ti ng
ng V er . 2 .0 D ec -0
-0 9
GU-475 Corporate FlowlineMaterialsSelection Guideline Ver. 1.0 Sep-04 SP-1275 Specification&Criteria forDesign ofCivil &BuildingWorks Ver. 2.0 Dec-09
GU-486 Screening&MonitoringBacteriaGuidelines Ver. 1.0 Oct 05 SP-1277 SpecificationforTransportable Accommodation ion Units Ver. 2.0 Dec-09
O H & GU-637 SourWellsCompletion, Material Selection Guidelines Ver. 1.0 May-10 SP-1279 SpecificationforCivil &BuildingConstruction Ver. 2.0 Dec-09

DEP30.10.02.11 MetallicMaterials-Selected Standards Feb-12 SP-1281 EngineeringSpecification forSafeRoad Works Ver. 2.0 Dec-09
DEP30.10.02.13 (Ι)  Non-MetallicMaterials-Selection &Application Feb-12 SP-1282 SpecificationforReinforced Concrete - Production&Construction Ver. 2.0 Dec-09
DEP 30.10.02.14 (Ι) Carbon Steel Corrosion EngineeringManual forUpstreamFacilities DEM-1 Feb-11 SP-1284 SpecificationforSign &Signboards- Standard SignsCatalogue Ver. 2.0 Dec-09
DEP30.10.02.31 (Ι) MetallicMaterials-Prevention
ion ofBrittle Fracturein NewAssets Amended byCircular59/11  DEM-1 Feb-11
DEP 30.46.00.31 (
30.46.00.31 ( Ι) Thermal Insulation Amendedby Circular70/12 Sep-12 GU-628 Guideto Civil &Buildings Standard Drawings Ver2.0 
Ver2.0  Dec-09
Revisedby AmendmentA02 –  Sept-12 GU-629 GuidelineforApplication &Selection ofStandard PipeSupports Ver 1.0 Dec-09
DEP30.48.00.31 ProtectiveCoatingsforOnshoreFacilities Amended&Supplemented bySP-1246 Jan-09 GU-630 Guidelineto Design &Construction ofSwimmingPools Ver2.0 
Ver2.0  Dec-09
DEP 30.48.00.32 (
30.48.00.32 ( Ι) CoatingofFasteners Feb-12 GU-631 GuidelineforSunshade  –  Specification, Design Requirements&Standard Drawings Ver 1.0 Dec-09
30.48.30.31 ( Ι)
DEP 30.48.30.31 ( CementLining ofPipes (BasedonEN 10298) Sep-12
DEP30.48.40.31 Thermal Spray Coatings of Aluminium Feb-12 DEP34.00.01.30 (I) StructuralDesign &Engineeringof OnshoreStructures Sep-11
PROCESS ENGINEERING  –  CFDH:
  CFDH: OSE/1 - (Said Alawi) DEP30.48.41.31
DEP30.48.60.10
ElectrolessNickel Plating- Amendments/Supplementsto ASTM B 733
Rubber-LinedProcessEquipment
Jan-08
Sep-12
DEP 34.11.00.10 (I)
34.11.00.10 (I) Onshore&NearshoreSite Investigations Sep-11
DEP34.11.00.11 (I) SitePreparations&Earthworks IncludingTankFoundationsand TankFarms Sep-11
DEP 31.10.00.10 (
31.10.00.10 ( Ι) Positive Material Identification (PMI) Pr Program DEM-1 Sep-11 DEP34.11.00.12 (Ι) Geotechnical &FoundationEngineering – 
&FoundationEngineering –  Onshore Amendedby Circular99/11 & 68/12   Feb-11
Doc. ID Document Title Additional Notes Rev./DEM Date DEP31.24.40.31 (Ι) MaterialsforHigh TemperatureConversionProcessFurnaceParts Feb-12 &AmendmentA03-Sep-12
DEP 31.40.10.20 SpoolableFibre-ReinforcedPlasticPipes Sep-12 DEP 34.13.20.31 (I)
34.13.20.31 (I) Road Paving, Surfacing, SlopeProtection &Fencing Sep-11
CP-200 WaterManagement CodeofPractice Ver. 1.0 Nov-11 DEP 31.40.20.32 (I)
31.40.20.32 (I) CRAClad orLined Steel Pipe- Amendments/Supplementsto Supplementsto APISpec5LD Sep-11 DEP34.14.20.31 (Ι) Drainagesystemsand primarytreatment facilities Amended byCircular55/11 DEM-1 Feb-11
DEP31.40.30.31 (Ι) External Polyethylene&PolypropyleneCoatingfor LinePipe Feb-11 DEP34.17.00.32 (Ι) Design&Engineering ofBuildings Amended/Supplementedby SP-1275 Sep-12
SP-1125 IsolationofProcessEquipmentSpecification Rev. 4.0 Jun-12 -Amendments/SupplementstoISO/DIS21809-1:2009 DEP34.17.10.30 (Ι) Design ofBlast Resistant OnshoreBuildings, Control Rooms, &Field AuxiliaryRooms DEM-1 Feb-12
SP-1126 DrainSystemsSpecification Ver. 3.0 Jun-12 DEP31.40.30.32 External Fusion-BondedEpoxyPowderCoatingfor LinePipe Feb-11 DEP 34.17.10.31 Laboratories Sep-12
SP-1166 SpecificationforIdentification ofOn-Plot Pipework Ver. 2.0 Sep-04 -Amendments/Supp;ementsto ISO21809-2:2007 DEP 34.17.10.33 (
34.17.10.33 ( Ι) PortableBlast-ResistantModules Amended byCircular71/11 &42/12 DEM-1 Feb-11
SP-1190 D e si g nf o r S ou r S e rv i ce S p e ci f ci a it o n O wn e r: S a fe t y E ng i ne e ri n g V e r. 3 . 0 S e p- 1 1 DEP31.40.30.34 ThermoplasticLinedPipelines Amended byCirculars05/02 &39/08    Dec-99 DEP 34.17.10.35 (
34.17.10.35 ( Ι) SitingofOnshore Occupied Portable Buildings DEM-1 Feb-11
DEP31.40.30.35 I n et r na l C oa t n
i g o f L in e P i pe f o r N on - Co rr i si v e G as T r an s mi s si o n S er v ci e S e p- 1 2 DEP34.19.20.11 (Ι) FireproofingofSteel Structures
ructures Amended byCircular03/12 DEM-1 Feb-11
PR-1696 HAZOP Procedure ContactOSE/1 &MSE4 BeforeUse Rev. 3 Jun-12 - Amendments/SupplementstoISO 15741 DEP 34.19.20.31 (I)
34.19.20.31 (I) Reinforced Concrete Structures Sep-11
GU-665 Water Treatment Strategy Ver. 0 Oct-11 DEP31.40.30.37 External Field Joint and RehabilitationCoatingSystemsfor LinePipe Jan-08 DEP34.24.26.31 Chimneysselection, designandengineering (basedonEN 1992-1-1, Sep-12
DEP 39.01.10.11 (
39.01.10.11 ( Ι) Selection OfMaterial ForLifeCycle Performance(UpstreamFacilities) Amended byCircular35/12 DEM-1 Feb-11 EN1993-3-2, EN1443, EN13084 Parts1, 2, 4, 5, 6, 7 and 8)
DEP01.00.01.30 (Ι) Definition&Determination ofTemperature, Pressureand ToxicityLevels DEM-1 Feb-12 - MaterialsSelection Process DEP 34.28.00.31 (I)
34.28.00.31 (I) OnshoreSteel Structures Sep-11
DEP 01.00.02 11 (Ι) PreparationofProcessFlow Schemes&Process EngineeringFlowSchemes DEM-1 Feb-11 DEP 39.01.10.12 (
39.01.10.12 ( Ι) SelectionofMaterialsfor Life CyclePerformance(UpstreamFacilities) Amendedby A01 Sep-12 DEM-1 Feb-12 DEP 34.28.00.33 (I)
34.28.00.33 (I) OnshoreAncillarySteel Structures Amended byCircular52/12 Sep-11
DEP01.00.02.12 (Ι) Preparation ofSafeguardingMemoranda& ProcessSafeguardingFlowSchemes DEM-1 Feb-11  –   Equipment
DEP20.04.10.10 Glycol TypeGasDehydration System Amended byCirculars50/06, 74/08 &05/10  
&05/10    Jan-05 DEP39.01.10.32 (Ι) Specification ofnickel basealloy718 (UNS N07718)foroil and gasdrilling and Amended byCircular36/12 DEM-1 Feb-11
DEP20.05.50.10 (Ι) Heat TransferFluid (HTF)Systems Amended byCircular42/11  DEM-1 Feb-11  production equipment (amendments/supplementsto sto API spec6A718)
DEP 20.05.60.10 (
20.05.60.10 ( Ι) FuelSystems Amended byCircular27/11 DEM-1 Feb-11 DEP 70.10.70.11 (
70.10.70.11 ( Ι) PreservationofNew and Old EquipmentStandingIdle Feb-11
BuildingServices  -
 -
DEP20.21.00.31 FoulingResistanceForHeat TransferEquipment Feb-11
DEP 30.05.10.30 (
30.05.10.30 ( Ι)  Nitrogen / Oxygen Supply&Distribution System DEM-1 Feb-12 Welding - SP-1285 SpecificationforCivil &BuildingServices Ver. 2.0 Dec-09
DEP30.10.05.11 Plant Model Construction & Review Feb-12
DEP 30.75.10.10 (
30.75.10.10 ( Ι) Steam, Condensate and BoilerFeed WaterSystems DEM-1 Feb-12 SP-1097 SpecificationforWeldingof DuplexStainlessSteel Pipelines Ver. 2.0 May-05 DEP31.76.10.10 Heating, Ventilation and AirConditioningforPlant Building Amended byCircular43/08 Jul-98
DEP31.22.05.11 Gas/LiquidSeparators - TypeSelection and Design Rules Feb-12 - Amendments/Supplementsto API Std 1104 DEP31.76.10.11 Installation, Testingand Balancing, and CommissioningofHVAC Systems Apr-06
DEP31.22.05.12 Liquid/Liquidand Gas/Liquid/Liquid Separators- TypeSelection and Design Rules Feb-12 SP-1167 Specification for We Welding on
on Pressurised Pipes Ver. 2.0 Oct-06 DEP34.14.20.31 (Ι) Drainagesystemsand primarytreatment facilities Amended byCircular55/11 DEM-1 Feb-11
DEP 37.05.10.11 (
37.05.10.11 ( Ι) Diesel Oil Systems DEM-1 Feb-12 SP-1173 Specification forWeldingon On-Plot Pipe-Work  REPLACESDEP31.38.01.31-GEN Ver. 1.3 May-08
DEP 80.10.10.31 (Ι) BreathingAir& Supply Systems ems NEWREQUIREMENT –  TB  TBC Sep-12 -Amendments/Supplementsto ASMEB31.3 &Amend/ Supl’t 
Supl’t DEP 30.10.60.18-GEN
DEP 80.45.10.10 (
80.45.10.10 ( Ι) DesignofPressure Relief, FlareandVent Systems AmendedA01 –  Sep-12 DEM-1 Feb-12 SP-1174 Sp eci if cat o
i n f or We
We dl n
i go
go fC
fCl as s2
s2 & Cl
Cl as s3
s3 Pi pel n
ie s V er .2 0
. D ec -04
DEP 80.45.10.11 (
80.45.10.11 ( Ι) OverpressureandUnder-pressure  – Prevention
 – Prevention and Protection DEM-1 Feb-12 - Amendments/Supplementsto API Std 1104
SP-1177 Specification for We Welding of
of Cl
Class 1 Pipelines Ver. 2.0 Oc
Oct-05
DEP 80.45.10.12 (
80.45.10.12 ( Ι) EmergencyDepressuringand Sectionalizing Amendedby Circular 77/12 DEM-1 Feb-11
AmendedA03 –  Sep-12
 Sep-12 - Amendments/Supplementsto API Std 1104
DEP80.45.11.12 (Ι) FlareDetails(Amendments/Supplementsto ISO 25457) AmendedbyCircular 01/12 DEM-1 Feb-11 PR-1272 S t an d ar d W e d
l i ng P r o ce d ur e Q ua l fi i ca t o
i n R e co r ds f o r O n- P o
l t P i pi n g V e r. 2 . 0 J u n- 0 5
PR-1274 S t an d ar d W e d
l i ng P r o ce d ur e Q ua l fi i ca t o
i n R e co r ds F o r C la s s 2 P i pe l n
i es V e r. 2 . 0 J u n- 0 5
(No DocNo) De-oilingManual Ver 2.0 Dec-10
PR-1276 Standard ProcedureQualificationRecordsforWelding on to Pressurised Pipes Ver. 2.0 Jun-05
FEED OFF CE ENG NEER NG M U FOR U E N FEED OFF CE ONLY
EP95-0312HAZID Hazard IdentificationTechnique Rev. 0 Sep-95
EP95-0313HAZOP Hazard &OperabilityTechnique Rev. 0 Oct-95 PR-1659 PipelineEmergencyRepairPQR’SWelding/ PipelineProcedures Ver. 1.0 Oct 05
EP 98-5632 Best Practices Guide - Gas Sw
Sweetening Technology Dec-98 DEP30.10.60.18 WeldingofMetals Amended and SupplementedbySP-1173 Feb-12
m M
EP 99-5266 Removal ofHeavyMetals fromWasteWater   – D  – Desk Study Feb-99 - Amendments/ Supplementsto
sto APIRP 582 O M m
EP 99-5508 KeyMultiphaseand Hydrate LearningPointsfrom theMain GasCondensate Sep-99 DEP-30.10.60.30 (Ι) Welding on Pressurised Pipes Amended and Supplemented by SP-1167 DEM 1 Feb-11
Systemsin theShell Group - Amendments/Supplementsto ANSI/ API RP 1107 AmendedbyCircular 60/11 
EP 99-5806 Best Practicein Produced WaterTreatment Dec-99 DEP-30.10.60.31 OxidationofStainlessSteel Weldments Dec-98
EP2003-5184 Shell Expro TopsidesSolidsManagement Guide Sep-03 DEP61.40.20.30 (Ι) WeldingofPipelinesand Related Facilities Amended byCircular07/12 DEM 1 Feb-11
EP2007-5644 EP Guidelineon ProcessSafeguarding Nov-07 (Amendments/Supplementsto
s/Supplementsto ISO13847:2000)
EPTL-GL-PRO-0001 Global ProcessEngineeringGuideline  – FacilityLineSizing
 – FacilityLineSizing Dec-08
GS 06.53139 GuideforFluid Characterization usingC7PLUSMethod in HYSYS Dec-06
Inspection-
GS 08.53105 HydrateGuidelines Aug-08
PR-1013  
PR-1013 StaticEquipmentInspection and MaintenanceProcedure Ver. 3.0 May-05 H
GS 09.50282 FlowAssuranceGuideline Jan-09
GS 09.51858 Guidelinesforthe HydraulicDesign and Operation ofMultiphaseFlowPipelineSystems PreviouslyGS.06.50701 May-09 GU-256 Static EquipmentInspectionGuideline Ver. 2.0 May-05
GS 09.53369 Plant and Pipeline Depressuring Guideline Dec-09 GU-363 Guidelineforthe Useof Scaffolding Ver. 1.0 Aug-00
GS 10.50828 Heat ExchangerSelection Guideline PreviouslyEP 2005-5186   Apr-10 GU-432B GuidelineforAutomated UltrasonicTestingScope Ver. 1.0 May-03
SR 11.11103 GuideforFluid Characterization usingC7PLUSMethod in UNISIM Apr-11 Definition forClass1 Piggable Pipelines
GU-450 GuidelineforInspection and IntegrityAssessment of Ver. 1.0 Nov-03
CarbonSteelNon-PiggablePipelines

DEP30.55.03.30 Validation ofNDE forFabrication Inspection Feb-12


DEP61.10.08.11 Field Inspection priorto CommissioningofMechanical Equipment Feb-11
CONTROL & AUTOMATION ENGINEERING  –  CFDH:
 CFDH: UEOA2 (UES) - (Salim Hinai)

Doc. ID Document Title AdditionalNotes Rev./DEM Date


InstrumentEquipment 
ECUR TY C DH U C m Am
S P- 10
10 89 I ns tr um
um en t I mp ul se L in
in es WITHDRAWN  –  Replacedby
 Replacedby DEP 32.37.10.11 Ver 1.0 Jan 01
SP-1090 InstrumentSignal Lines Based on DEP 32.37.20.10(May2004) Ver. 2.0 Dec05 m M
SP-1206 C &A Standard Drawings Ver. 2.0 Dec-10
SP-1243 CorporatePhilosophyforControl and Automation Ver. 2.0 Jun-11
SP-1245 Fieldbus Control SystemSpecification Ver. 3.0 Dec-10
SP-2098  
SP-2098 SmartPlant InstrumentationSpecification
ionSpecification NEWREQUIREMENT Ver. 2.0 May-12
SP-2121 DACAPCDSystemsAccess &Control Management Ver. 1.0 Dec-11

PR-1094 
PR-1094  I ns rt umen et d P o
r et c itv eF
eF un cti ons Te
Te st Pr oce du re R ev .1 0
. Au g- 04
PR-1293 Main Oil Line(MOL)MeteringSystems Verification Procedure Rev. 1 May-09
PR-1304 Product FlowMeasurement Rev. 3.0 Jul-11
TELECOM U D
PR-1315 MeasurementEquipmentCalibration/Recertification Procedure Rev. 2.0 Aug-11
PR-1619 MinaAl Fahal Terminal Oil Material Balance Rev. 1.0 Mar-11 &
PR-1620 MinaAl Fahal Terminal Dip Procedure Rev. 2.0 Sep-10
PR-1809 ProductionMeasurementManagementSystemProcedure Ver 1.0 Nov-08
PR-1995 DACAPCDP &PCD SystemsAccessRequest Procedures Ver. 1.0 Dec-11
PR-1996 Venturi Based Wet GasMeter(WGM) Sizing, Commissioning, Update &Review Rev. 1.0 Nov-11

GU-437 SILAssessment &Implementation Guidelines Ver. 2.0 May-09


GU-513 GuidelinesforAlarmManagement and Rationalisation Ver. 2.0 Dec-09
GU-656 Guidelineforthe useof Level MeasuringInstruments Rev. 1.0 Sep-11

DEP 30.00.60.15 (
30.00.60.15 ( Ι) HumanFactorsEngineering  – Control
 – Control RoomDesign Feb-12 Q M m
DEP30.00.60.16 Human FactorsEng.  –  Human/MachineInterfaceDesign for Situation Awareness REPLACESSP-1192   Aug-09
DEP31.40.70.30 (Ι)
DEP32.01.20.12
QuarterTurn Actuatorsfor On/OffValves
ProcessControl Domain -
Amended byCircular50/11 DEM-1 Feb-11
Feb-12 Notes:
- Enterpriseindustrial automation information technologyand security
DEP32.01.23.17 (Ι) ProcessControlDomain  –  SecurityRequirementsforSuppliers
  SecurityRequirementsforSuppliers DEM-1 Feb-11 T D m mL L m M
DEP32.01.40.31 (Ι) RequirementsforReal-TimeProduction Operationsand Production-Critical Feb-12
Real-TimeData DE D m m m
DEP32.10.03.10 (Ι) InstrumentSymbolsand Identificationon ProcessEngineeringFlowSchemes DEM-1 Feb-11 m m M m
DEP32.24.20.44 (Ι) Instrumentation Control & Protection forFired Equipment DEM-1 Feb-12
DEP32.29.20.10 (I) Safeguarding&Instrumented ProtectiveFunctionsforRotatingEquipment AmendedbyCircular 74/11  DEM-1 Feb-11
DEP32.30.20.11 (I) Fire, Gasand Smoke Detection Systems AmendedbyCircular 72/12 DEM-1 Sep-11 DO M m mD m L m M
DEP 32.30.20.14 (I)
32.30.20.14 (I) InstrumentAsset Management Feb-12
DEP 32.30.20.15 (I)
32.30.20.15 (I) DCSBasicApplication Standards
D DO H
CM C M m m w M
M
C C M
M
R M
GU G N M CAUT ON
T H D m W C M A T m m MAKE SURE YOU HAVE LATEST REV S ON CHECK N L VEL NK o SHELL DEP WEBS TE
w L
A w BOLD
Rev on 18a
UE w
D m Ow U
Documen N GU-611 ue Da e Nov 2012

You might also like