Professional Documents
Culture Documents
11 FIRST ISSUE
REV. DATE DESCRIPTION PREPARED CHECKED APPROVED
REVISION
OWNER IDENTIFICATION No.:
REV.: 00
OWNER: CONSULTAN
VIETNAM ELECTRICITY T:
POWER ENGINEERING
VINH TAN THERMAL POWER MANAGEMENT
BOARD CONSULTING J.S.C 2 (PECC2)
EPC
CONTRACTOR: SHANGHAI ELECTRIC GROUP CO.,LTD.
DESIGN:
NORTHERN HEAVY INDUSTRIES GROUP CO.,LTD
PROJECT: DESIGN STAGE:
VINH TAN 2 2×622MW THERMAL POWER PLANT Not Available
APPROVED CHECKED
Li Hongsheng Wang Kuimin
MGS4772 双进双出磨煤机试运行操作规范
REVIEWED PREPARED Liu Yin Test Run Operation Specification of MGS4772 Double-inlet and
Zhang Pengxiao
double- outlet coal mill
DATE 2011.11 SCALE NO SCALE DRAWING No. REV. A
DZMS0015.00SM-2
Test Run Operation Specification of MGS4772
Double-inlet and double- outlet coal mill
CONTENTS
1 General ........................................................................................ 4
1.1 Running principle of the coal mill ................................................. 4
1.2 Mechanical description of the coal mill ........................................ 5
1.2.1 Barrel........................................................................................ 5
1.2.2 Hollow shaft .............................................................................. 5
1.2.3 Bearing ..................................................................................... 5
1.2.4 Sealing system ......................................................................... 6
1.2.5 Driver........................................................................................ 6
1.2.6 Slow driver ............................................................................... 6
1.2.7 Sound insulation cover ............................................................. 6
1.2.8 Ball adding system ................................................................... 6
1.2.9 Deactivating system ................................................................. 7
1.3 Description of control system ...................................................... 7
1.3.1 Temperature control for air-dust mixture at outlet of separator. . 7
1.3.2 Control of total capacity of primary air....................................... 7
1.3.3 Adjustment of coal level in coal mill .......................................... 7
1.3.4 Automatic control system .......................................................... 8
2 Preparations before test run ........................................................ 8
2.1 Visual inspection ......................................................................... 8
2.2 Pipe inspection ............................................................................ 8
2.3 Electric and instrument inspection ............................................... 9
2.4 Mechanical inspection ................................................................. 9
2.5 Fill of oil and lubricating grease ................................................. 10
2.6 Manual inspection ..................................................................... 10
Hot air comes into coal mill through center pipe rotated by beam,
inside of the beam is fixed on lining board, and outside is supported by
external rolling bearing at outlet of air-heater box.
Raw coal is sent into barrel through rotary vane fixed at outside of
center pipe by protective chain.
(2)Hollow shaft can make barrel rotating by cooperation of slide bearing.
1.2.3 Bearing
Structure of bearing can compensate the droop of coal mill at load.
Bearing body is made of antiwear metal,which can prevent any damage,
bearing seat is made of welding steel component.
When lubricating oil is sent out by hydraulic power unit:
——At HP,oil is sent to bottom of hollow shaft to ―float up‖ it.
——At LP, a great number of oil is sent to top of hollow shaft to cool it.
Addition of steel balls should be gradually carried out during coal mill
operating.
——1st step: 1/4 of total of steel balls
——2nd step: 2/4 of total of steel balls
——3rd step: 3/4 of total of steel balls
——4th step: 4/4 of total of steel balls
Important prompt:——To avoid firing danger,cannot have coal when
running
——Record the quantity of steel balls to be added into coal mill is very
important.
——Record all characteristics in operation(i.g. absorbed power, vibration
and oil pressure etc.).
——Coal mill operates half-hour at max balls loading capacity.
——First addition of balls must be done through manhole and not ball
adding system.
(1) 1st step
Coal mill, first time, must be added with 25% of total steel balls