2435.

0
Chainage--------------------0+040 (Alignment 2) Estimated Quantities [at 0+40 ]
Structure Type------------- New RCP Item Quantity
Pipe Size------------------- 1 Ø1220mm
Invert Level---------------- 2424.27 Structural Excavation---------------------75.60m3
Flow Direction------------ R Channel Excavation---------------------1.46m3
Invert Slope---------------- 5% Backfill -------------------------------------30.24 m3
Pipe Length---------------- 20.75m Cement Mortared Stone Masonry------- 15.32m3
2430.0 LHS End Structure-------- Type A Inlet Grouted Stone Pitch----------------------- 8.32 m2
RHS End Structure-------- Type C End Wall Concrete Pipes------------------------------ 20.75m
Skew Ang------------------- 0 Degree
-2.5% -2.5%
-2.0
:1
2425.0 Inv.elev=2424.27
-10 -5.00 0.00 5.00 10.00Chanelization
NOTES:- CLIENT CONSULTANT PROJECT From Genflie Bridge to Janmeda
1. ALL DIMENSIONS ARE IN MILLI METERS UNLESS OTHERWISE INDICATED
2. ALL COORDINATES ARE IN MILLI METERS
ETHIOPIAN CONSTRUCTION DESIGN NEW RIVISIONS
Pipe Culvert Cross section at station 0+040
SCALE:
As Shown
3. ALL LEVELS ARE IN MILLI METERS AND SUPERVISION WORKS CORPORATION DATE DISCRIPTION DATE DISCRIPTION
DATE July, 2020
4. DIGITAL TERRAIN MODEL HAS BEEN PRODUCED FROM SURVEY DATA
Drawn by Designed by Checked by Approved by
TRANSPORT DESIGN AND SUPERVISION WORKS SECTOR SHEET No.GSC-01/04
Getnet M. Getnet M. Yordanos B.